Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.4 LAccepted-AOC | ₹24.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹28.1 L+₹3.7 L (15.3%)Rejected-AOC | ₹28.1 L+₹3.7 L (15.3%) | 2 | Rejected-AOC NOT L1 |
| 3 | 3₹33.3 L+₹8.9 L (36.6%)Rejected-AOC | ₹33.3 L+₹8.9 L (36.6%) | 3 | Rejected-AOC NOT L1 |
| 4 | 4₹38.1 L+₹13.7 L (56.2%)Rejected-AOC 602 6TH FLOOR WESTERN EDGE I WESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI MAHARASHTRA 400066 | MUMBAI SUBURBAN | MAHARASHTRA | 400066 | ₹38.1 L+₹13.7 L (56.2%) | 4 | Rejected-AOC NOT L1 |
| 5 | 5₹40.6 L+₹16.2 L (66.4%)Rejected-AOC B 101 GIDC ELECTRONIC ZONE SECTOR 25 GANDHINAGAR GUJARAT | GANDHINAGAR | GANDHINAGAR | GUJARAT | ₹40.6 L+₹16.2 L (66.4%) | 5 | Rejected-AOC NOT L1 |
Tender Value
Refer Docs
EMD Value
₹30,262
Closing Date
30 Dec 2019, 11:00 amClosed
GM(P) LBP SILVASSA
Plot NO 75/1 karajgam PO -Amboli Silvassa 396230 Dadra and Nagar Haveli
Engineering, Procurement, Construction EPC inclusive of 1 Year Comprehensive Operation and Maintenance of 70 KWp OnGrid Ground or Roof Mounted Captive Solar Power Project at LBP Silvassa with its further Comprehensive O and M for 4 Years
2019_GSO_110093_1
LBP-SIL/ENGG/SOL/LT/2019-20
Limited
Lump Sum TurnKey
Lump-sum
120 days
LBP Silvassa
refer tender documents
6 documents required · 6 mandatory
₹30,262
Yes
27 Feb 2020
20 Dec 2019
31 Dec 2019
20 Dec 2019
30 Dec 2019
20 Dec 2019
Amount
PART A (1) : Supply of Plant & Equipment including Spares and Allied Services of Installation & Other Works
PART A (2) Operation & Maintenance of Solar Power Generating System for 1 Year
TOTAL FOR PART A: SOLAR POWER GENERATING SYSTEM
PART B: OPERATION AND MAINTENANCE FOR 4 YEARS AFTER COMPLETION OF PART A
Description of Work / Item(s)
Amount
Supply of Plant & Equipment including Spares and Allied Services of Installation & Other Works
Description of Work / Item(s)
Amount
Operation & Maintenance of Solar Power Generating System for 1 Year
Description of Work / Item(s)
Amount
Operation and Maintenance (O&M) for 1st year after completion of Part A
Operation and Maintenance (O&M) for 2nd year after completion of Part A
Operation and Maintenance (O&M) for 3rd year after completion of Part A
Operation and Maintenance (O&M) for 4th year after completion of Part A
Freyr Energy Services Pvt Ltd
U R Energy (India) Pvt. Ltd
Waaree Energies Ltd
Topsun Energy Limited
Sree Nandhees Technologies Pvt Ltd
Freyr Energy Services Pvt Ltd
U R Energy (India) Pvt. Ltd
Topsun Energy Limited
Waaree Energies Ltd
Sree Nandhees Technologies Pvt Ltd
Sree Nandhees Technologies Pvt Ltd
Freyr Energy Services Pvt Ltd
U R Energy (India) Pvt. Ltd
Waaree Energies Ltd
Topsun Energy Limited
Freyr Energy Services Pvt Ltd
U R Energy (India) Pvt. Ltd
Sree Nandhees Technologies Pvt Ltd
Waaree Energies Ltd
Topsun Energy Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .