| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹49.9 L+₹1.8 L (3.82%)Rejected-AOC 2003 SUB TREASURY NILESWAR | L2 | Rejected-AOC L2 | |
| 3 | L3₹58.6 L+₹10.5 L (21.9%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹61.9 L+₹13.8 L (28.8%)Rejected-AOC THRISSUR KERALA | KANNUR | KERALA | 670511 | L4 | Rejected-AOC L4 |
Tender Value
₹53.5 L
EMD Value
₹50,000
Closing Date
9 Apr 2025, 2:00 pmClosed
EXECUTIVE ENGINEER
O/O Executive engineer PWD Buildings division Malappuram
GENERAL-Reconstruction of Damaged compound wall at Government Technical High School, kuttippuram -Reconstruction of Damaged compound wall at Government Technical High School, kuttippuram -General Civil Work-1
2025_PWD_757387_1
BL/DN/MPM/3/2025-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
THS Kuttipuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
₹50,000
Yes
28 May 2025
1 Apr 2025
11 Apr 2025
1 Apr 2025
9 Apr 2025
1 Apr 2025
Amount
CIVIL WORK
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD20168/2023-2024:Dry Rubble Masonry-Dry rubble without concrete levelling course masonry with Departmental rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.45.1:Finishing walls with textured exterior pint of required shade:New work (Two or more coats applied @ 3.28 ltr/ 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD264503/2024-2025:Stainless steel letters in Malayalam /English of size 20 cm as per design
OD264506/2024-2025:Steel work for purlin/single section with G P pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete, as per direction of engineer at the site
12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
10.29.1:Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm and nuts & bolts complete.Galvanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides
OD265504/2024-2025:Proving and fixing Ist quality laterite cladding confirming to IS:15622 (thickness to be specified by the manufacture) of approved make any size as approved by Engineer-in charge ,in skirting, risers of steps and dados, over 12mm thick bed of cement mortar 1:3 (1cement:3coarse sand) and jointing with grey cement slurry @3.3kg per sqm ,including pointing in white cement mixed with pigment of matching shade complete.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
OD279271/2024-2025:engaging coolies
BABU K (BID ID -2190134)
kunhahammed v (BID ID -2192115)
v.abdul salim (BID ID -2192136)
Bidder Name
kunhahammed v
P. P. SIRAJUDHEEN
v.abdul salim
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1230695.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .