| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAccepted-AOC | ₹8.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹10.1 Cr+₹1.2 Cr (13.6%)Rejected-AOC | ₹10.1 Cr+₹1.2 Cr (13.6%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical PQ committe not decided to pre-qu |
Tender Value
₹6.8 Cr
EMD Value
₹2 L
Closing Date
13 Oct 2020, 6:15 pmClosed
Superintending Engineer, Irrigation North Circle,
Office of the Superintending Engineer, Irrigation North Circle,Cauvery House,Westhill, Kozhikode 673005
Construction of Groynes at Kallai River mouth in Calicut Corporation
2020_Irrig_377918_2
SEIK/ET-PQ-01/2020-21/S
Open Tender
Civil Works - Others
Item Rate
540 days
Kallai river mouth
Please refer Tender documents.
8 documents required · 8 mandatory
₹13,150
Yes
online
₹2 L
Yes
Office of the Superintending Engineer, Irrigation
24 Sept 2022
22 Sept 2020
16 Oct 2020
22 Sept 2020
13 Oct 2020
22 Sept 2020
22 Sept 2020 - 30 Sept 2020
24 Sept 2020
Amount
Supplying and laying Bedding layer at site of work 1Kgs. to 50 kgs. blasted granite stones (1 Kg. to 20 Kgs. 40% ,20 to 40Kgs. 40% and 40 to 50 kgs. 20% ) as per approved design including supply of stones , loading from quarry ,conveying to site in tipper ,weighing on contractors own weigh bridge for measurement , unloading dumping at site to lines and levels ,rehandling stones for forming the section with the help of crane and packing of stones if necessary ,including hire and operational charges of all tools and plants and all sundry expenses ,providing and maintaining the runway for movement of vehicles ,crane using spalls gravel or sand etc.. complete as per the direction of departl. officers at site.and as per standard specification.
Supplying and laying Core layer using 50Kgs to 150Kgs.. Blasted granite stones (50 Kg to 75Kgs. 50%,75 to 150Kgs.50% ) as per the approved design , including supply of stones , loading from quarry conveying to site in tipper ,weighing on contractors own weigh bridge for measurement , unloading and dumping and packing in position at site to lines and levels to form the core layer over the filter already laid by ,rehandling stones for forming the section with the help of tippers /cranes /any floating arrangement and packing stones if necessary, including hire and operational charges of all tools and plants wages of divers and all sundry expenses ,providing and maintaining the runway for movement of vehicles ,crane using spalls gravel or sand etc. complete as per the direction of departl. officers at site.and as per standard specification.
Supplying and Providing secondary layer using 150kgs to 500kgs. blasted granite stones (150kg to 300kg 40% , 300to 400kgs 30% and 400 to 500kg 30% ) with its specific gravity not less than 2.4 , as per approved design including supply of stones, loading from quarry to tipper by crane and conveying to site weighing on weigh bridge provided by contactor at site for measurement unloading and dumping and packing in position at site to lines and levels to form the secondary layer over the core layer and filter layer already laid by re handling stones packing for forming the section with the help of crane floating arrangement if necessary including hire and operational charges of all tools and plants wages of divers and all sundry expenses ,providing and maintaining the top surface of runway for movement of vehicles ,crane using spalls gravel or sand etc.. complete as per the direction of departl. officers at site..and as per standard specification.
Supplying and providing armour layer and toe layer using 500 Kgs , 2500Kgs blasted granite stones(500 to1000Kgs 60%, 1000-2000 kg 20% and 2000 to 2500 KG 20% ) with its specific gravity not less than 2.4 as nearly cubical as possible as per approved design including supply of stones, loading from quarry to tipper by crane conveying to site weighing on weigh bridge provided by contractor at site for measurement unloading and dumping and packing in position at site to lines and levels to form the armory layer over the secondary layer already laid, with heavier stones on top layer by ,rehandling stones, packing for forming the section with the help of cranes /any floating arrangement if necessary including hire and operational charges of all tools and plants wages of divers and all sundry expenses ,providing and maintaining the top surface of runway for the movement of vehicles ,crane using spalls gravel or sand etc.. complete as per the direction of departl. officers at site.and as per standard specification.and as per standard specification.
P M MANSOOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .