| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹1.3 L (1.05%)Admitted-Finance NA | ₹1.3 Cr+₹1.3 L (1.05%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S. CHANDAN ARVIND CONSTRUCTION CO L2 | THE AKASHDEEP COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD L1 |
|---|---|---|---|---|---|
| 1.00Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottam and back filling with approved material.) | |||||
| 1.10 | upto 3.00 metre depth. | 1,475.42 | Cum (Cubic Metre) | 80 ₹1,18,034 | 76.89 ₹1,13,445 Lowest |
| 1.20 | 3.00 metre to 6.0 meter depth. | 128.66 | Cum (Cubic Metre) | 80 ₹10,293 | 78.46 ₹10,095 Lowest |
| 2.00 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) for base course under Abutment and Pier complete as per drawing & technical specifications. | 128.42 | Cum (Cubic Metre) | 5,000 ₹6,42,100 | 4,058 ₹5,21,128 Lowest |
| 3.00 | Providing and laying P.C.C. M-15 Grade leveling course below approach slab complete as per drawing and Technical specification complete in all respects clause 800 and 1211. Using Batching Plant Transit Mixer & Concrete Pump | 176.89 | Cum (Cubic Metre) | 3,950 ₹6,98,716 | 3,854 ₹6,81,734 Lowest |
| 4.00 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 PCC M-20 Using Batching Plant Transit Mixer & Concrete Pump | 84.08 | Cum (Cubic Metre) | 4,450 ₹3,74,156 | 4,288 ₹3,60,535 Lowest |
| 5.00 | Brick Masonary work (1:3) in cement mortar in foundation and plinth complete excluding pointing and plastering as per drawing and technical specifications Clauses 702, 704, 1202 & 1204 | 90.37 | Cum (Cubic Metre) | 5,800 ₹5,24,146 Lowest | 5,928 ₹5,35,713 |
| 6.00 | Plain/Reinforced Cement Concrete (R.C.C. M-30) in Open Foundation complete as per Drawing and Technical Specifications for Abutment/Pier/Wing wall Footing including Centring Shuttering but excluding steel reinforcement complete as per drawing and technical specifications. Using Batching Plant Transit Mixer & Concrete Pump | 191.09 | Cum (Cubic Metre) | 5,000 ₹9,55,450 Lowest | 5,000 ₹9,55,450 Lowest |
| 7.00Plain/Reinforced Cement Concrete (R.C.C. M-30) for Substructure complete as per Drawing and Technical Specifications for Abutment/stem/Pier stem & Return wall including Centring Shuttering as per drawing and technical specifications. Using Batching Plant Transit Mixer & Concrete Pump | |||||
| 7.10 | Height upto 5m | 127.79 | Cum (Cubic Metre) | 6,100 ₹7,79,519 | 6,000 ₹7,66,740 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
10 Jul 2026, 4:00 pmClosed
Executive Engineer Civil PMB
Amritsar
Const. of Bridge 3 Span 8.0 M each over Hudiara Nallah at RD. 103800 on Link Road Asr-Ranian Road to Jhanjoti at RD 0/785 under PMGSY-III, Distt Amritsar (Pkg No. PB01157)
2026_AGRI_148459_1
10 of 2026
Open Tender
Civil Works - Bridge Construction
Percentage
270 days
Amritsar
Refer Tender Notice
10 documents required · 10 mandatory
₹20,000
Executive Engineer (C) Punjab Mandi Board
₹2.6 L
Yes
28 Jul 2026
25 Jun 2026
11 Jul 2026
25 Jun 2026
10 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottam and back filling with approved material.) | |||||
| 1.1 | upto 3.00 metre depth. | 1,475.42 | Cum (Cubic Metre) | 111.39 | ₹1,64,347.03 |
| 1.2 | 3.00 metre to 6.0 meter depth. | 128.66 | Cum (Cubic Metre) | 254.57 | ₹32,752.98 |
| 2 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) for base course under Abutment and Pier complete as per drawing & technical specifications. | 128.42 | Cum (Cubic Metre) | 55.74 | ₹7,158.13 |
| 3 | Providing and laying P.C.C. M-15 Grade leveling course below approach slab complete as per drawing and Technical specification complete in all respects clause 800 and 1211. Using Batching Plant Transit Mixer & Concrete Pump | 176.89 | Cum (Cubic Metre) | 111.39 | ₹19,703.78 |
| 4 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 PCC M-20 Using Batching Plant Transit Mixer & Concrete Pump | 84.08 | Cum (Cubic Metre) | 254.57 | ₹21,404.25 |
| 5 | Brick Masonary work (1:3) in cement mortar in foundation and plinth complete excluding pointing and plastering as per drawing and technical specifications Clauses 702, 704, 1202 & 1204 | 90.37 | Cum (Cubic Metre) | 55.74 | ₹5,037.22 |
| 6 | Plain/Reinforced Cement Concrete (R.C.C. M-30) in Open Foundation complete as per Drawing and Technical Specifications for Abutment/Pier/Wing wall Footing including Centring Shuttering but excluding steel reinforcement complete as per drawing and technical specifications. Using Batching Plant Transit Mixer & Concrete Pump | 191.09 | Cum (Cubic Metre) | 459.3 | ₹87,767.64 |
| 7Plain/Reinforced Cement Concrete (R.C.C. M-30) for Substructure complete as per Drawing and Technical Specifications for Abutment/stem/Pier stem & Return wall including Centring Shuttering as per drawing and technical specifications. Using Batching Plant Transit Mixer & Concrete Pump | |||||
| 7.1 | Height upto 5m | 127.79 | Cum (Cubic Metre) | 2,079.02 | ₹2,65,677.97 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
NIT010.pdf
Tender Documents • 0.33 MB
BOQ_232610.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .