| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Fee/PreQual/Technical/Finance | -3.00% | ₹5.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.8 L+₹1.3 L (24.7%)Admitted-Fee/PreQual/Technical/Finance | +21.00% | ₹6.8 L+₹1.3 L (24.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.6 L
EMD Value
₹14,100
Closing Date
24 Aug 2026, 5:00 pmClosed
Executive Engineer, PMU, Tirur
KSEB Limited, Vydyuthi Bhavanam, Pookayil (P.O), Thazhepalam, Tirur - 676107
Drawing new HT ABC line and erection of New transformer at Exchange Road
2026_KSEB_864904_1
TENDER/2026-27/6155/56 dated 10.08.2026
Open Tender
Electrical Works
Percentage
90 days
Tirurangadi
As per tender documents
7 documents required · 7 mandatory
₹1,416
₹14,100
31 Aug 2026
10 Aug 2026
31 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
11 Aug 2026 - 18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles | 700 | m | 45.62 | ₹31,934 |
| 2 | Transportation of one KM HT AB Cable and its accessories by hired vehicle from store to the site including loading and unloading. | 0.77 | km | 13,327.7 | ₹10,262.33 |
| 3 | Providing Cable Tie | 30 | E | 3.85 | ₹115.5 |
| 4 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size | 16 | E | 164.67 | ₹2,634.72 |
| 5 | Erection of suspension clamp for 11KV ABC of any size | 25 | E | 164.67 | ₹4,116.75 |
| 6 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable | 6 | E | 193 | ₹1,158 |
| 7 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. | 6 | E | 370 | ₹2,220 |
| 8 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 24 | No | 762.14 | ₹18,291.36 |
| 9 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | 17 | No | 1,373.73 | ₹23,353.41 |
| 10 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 10 | No | 906.41 | ₹9,064.1 |
stage.html
html • 0.02 MB
finance_1463502.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_1463502.xls
BOQ • 0.29 MB
TENDERDocumentTgdi.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .