Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹6.4 L Construction of Boys Hostel of 500 Students capacity at IIITM Gwalior (MP) Including Electrical works. (SH:- Hiring of Inspection Vehicle for EE, GCD, CPWD Gwalior) | Construction of Boys Hostel of 500 Students capacity at IIITM Gwalior (MP) Including Electrical works. (SH:- Hiring of Inspection Vehicle for EE, GCD, CPWD Gwalior) | L1 | |
| 2 | L2₹6.4 L+₹401.10 (0.06%) Construction of Boys Hostel of 500 Students capacity at IIITM Gwalior (MP) Including Electrical works. (SH:- Hiring of Inspection Vehicle for EE, GCD, CPWD Gwalior) | Construction of Boys Hostel of 500 Students capacity at IIITM Gwalior (MP) Including Electrical works. (SH:- Hiring of Inspection Vehicle for EE, GCD, CPWD Gwalior) | L2 |
| Sl No | Description | Qty | Unit | DILIP SINGH TOMAR L2 | RAKESH SHRIVASTAVA L1 |
|---|---|---|---|---|---|
| 1 | ESTIMATE COST | - | - | -3.99 ₹6,41,827.81 | -4.05 ₹6,41,426.71 Lowest |
Tender Value
₹6.7 L
EMD Value
₹13,370
Closing Date
2 Feb 2024, 3:00 pmClosed
EE-Gwalior
Rajesh Kumar Garg
EE GCD CPWD 35 CITY CENTRE GWALIOR
Construction of Boys Hostel of 500 Students capacity at IIITM Gwalior (MP) Including Electrical works. (SH:- Hiring of Inspection Vehicle for EE, GCD, CPWD Gwalior)
66422
29/EE/GCD/2023-24
OPEN
Hiring of Vehicles
NCB
12 months
Gwalior, Madhya Pradesh
14 documents required · 14 mandatory
₹13,370
Not Applicable
2 Feb 2024
25 Jan 2024
2 Feb 2024
2 Feb 2024
1 Feb 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
1NewNITNo29.pdf
document • 9.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .