Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC VILL ADISAPTAGRAM PO MOGRA | ₹4.4 Cr Quoted ₹4.6 Cr | L1 | Accepted-AOC As L1 bidder |
| 2 | L2₹4.8 Cr+₹20.6 L (4.45%)Rejected-AOC | ₹4.8 Cr+₹20.6 L (4.45%) | L2 | Rejected-AOC As L2 bidder |
| 3 | L3₹5.0 Cr+₹37.4 L (8.09%)Rejected-AOC PUNJAB NATIONAL BANK BUILDING P O MECHEDA MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | ₹5.0 Cr+₹37.4 L (8.09%) | L3 | Rejected-AOC As L3 bidder |
Tender Value
₹4.1 Cr
EMD Value
₹8.1 L
Closing Date
21 Sept 2020, 12:00 pmClosed
GM,BTPS
Administrative Building, Bandel Thermal Power Station, Tribeni, Dist Hooghly Pin712503
Sweeping and Cleaning of various locations of Power House, ECR, AHP and ESP along with Removal of deposited ash from various Locations of Unit 1, 2 and 5 of BTPS.
2020_WBPDC_293929_1
WBPDCL/BTPS/NIT/E1751/20-21
Open Tender
Housekeeping/ Cleaning
Item Rate
730 days
Bandel Thermal Power Station
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹8.1 L
Administrative Building, Bandel Thermal Power Stn.
8 Apr 2021
25 Aug 2020
23 Sept 2020
25 Aug 2020
21 Sept 2020
2 Sept 2020
31 Aug 2020
Amount
Sweeping & Cleaning of various locations of Power House, ECR, AHP & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS.
Supply of unskilled workman (45 nos Listed) for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS, Category I Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works. Category I
Cost for listed holiday. Category I Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer
House rent allowance for 45 nos worker. Category I This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against 45 Nos. labourers. Category I
Supply of unskilled workman (02 no Listed) for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS, Category II Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works. Category II
Cost for listed holiday. Category II Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer.
House rent allowance for 1 no worker. Category II This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against labourers. Category II
Supply of unskilled workman (01 no Listed) for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS, Category III Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works. Category III
Cost for listed holiday. Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer. Category III
House rent allowance for 1 no worker. Category III This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against labourers. Category III
Supply of unskilled workman (01 no Listed) for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS, Category IV Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works. Category IV
Cost for listed holiday. Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer. Category IV
House rent allowance for 1 no worker. Category IV This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against labourers. Category IV
Supply of unskilled workman (01 no Listed) for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS, Category V Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works. Category V
Cost for listed holiday. Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer. Category V
House rent allowance for 1 no worker. Category V This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against labourers. Category V
Supply of unskilled workman (01 no Listed) for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS, Category VI Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works. Category VI
Cost for listed holiday. Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer. Category VI
House rent allowance for 1 no worker. Category VI This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against labourers. Category VI
Supply of unskilled workman (01 no Listed) for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS, Category VII Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works. Category VII
Cost for listed holiday. Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer. Category VII
House rent allowance for 1 no worker. Category VII This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against labourers. Category VII
Supply of unskilled workman (01 no Listed) for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS, Category VIII Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works. Category VIII
Cost for listed holiday. Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer. Category VIII
House rent allowance for 1 no worker. Category VIII This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against labourers. Category VIII
Welfare allowance for 53 nos workerS. Category I TO VIII. This allowance @ 400/ per month shall be paid to these workers subject to minimum 06 days work per month by the worker. Payment will be made accordingly by per head per month.
Cost of Liveries (For Category I to VIII)
Cost of PPE(For Category I to VIII)
Supply of unskilled workman (05 nos Non-Listed)for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS Note :- i) In case of enjoying E. L (Max. 7 days), this rate will be reduced by Rs. 92. 93 per day for each labour. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works (5 Nos. Non-Listed)
Cost for listed holiday. Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by the Controlling Officer. (5 Nos. Non-Listed)
House rent allowance (05 nos Non-Listed) This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month.
Statutory component (ESI, PF, Bonus) against labourers (5 Non-listed)
Provision of EL for 05 nos. Non Listed workers
Cost of PPE (5 Nos. Non-Listed Workers)
Supply of unskilled worker (1 NO. NO-CATEGORY)for Sweeping & Cleaning of various locations of power house, ECR, AHP, & ESP along with Removal of deposited ash from various Locations of Unit 1, 2 & 5 of BTPS ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including profit on basic and including supply/ hire charges of necessary tools & tackles.
Statutory component (ESI, PF, Bonus) against labourers. [1 No. No-Category Worker]
Cost of PPE (For 1 No. No Category Worker)
STHAPATI
INDIAN CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .