| 1 | L1₹7.5 LAccepted-AOC | ₹7.5 L | L1 | Accepted-AOC LOWEST AMOUNT QUOTED BY EDATTU CONSTRUCTIONS |
| 2 | L2₹7.8 L+₹29,659.51 (3.93%)Rejected-AOC | ₹7.8 L+₹29,659.51 (3.93%) | L2 | Rejected-AOC LOWEST AMOUNT QUOTED BY EDATTU CONSTRUCTIONS |
| Sl No | Description | Qty | Unit | RAJEEV P.S L2 | EDATTU CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Pazhayarikandam GHS toilet | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 13.77 | cum | 350 ₹4,818.1 | 300 ₹4,129.8 Lowest |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 3.26 | cum | 8,138.7 ₹26,540.3 | 7,900 ₹25,761.9 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.21 | cum | 9,694.9 ₹31,110.93 | 8,500 ₹27,276.5 Lowest |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 9.4 | cum | 309.87 ₹2,914.33 | 300 ₹2,821.5 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.56 | cum | 7,717.7 ₹19,734.16 | 7,500 ₹19,177.5 Lowest |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 14.57 | cum | 7,505.27 ₹1,09,344.28 | 7,500 ₹1,09,267.5 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.99 | cum | 13,079.2 ₹39,146.05 | 13,000 ₹38,909 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 27.93 | sqm | 935.28 ₹26,122.37 | 800 ₹22,344 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 17.64 | sqm | 742.28 ₹13,093.82 | 700 ₹12,348 Lowest |
Tender Value
₹8.1 L
EMD Value
₹20,126
Closing Date
18 Mar 2026, 6:00 pmClosed
ASSI.EXECUTIVE ENGINEER
ASSI.EXECUTIVE ENGINEER LID EW DIVISION IDUKKI DP PAINAVU
Annual Plan-Annual Plan - IDP - 2025-26 KANJIKUZHY GRAMAPANCHAYATH PAZHAYARIKANDAM GHS TOILET -- 80/26-General Civil Work
2026_LSGD_845185_19
19/T/AEE/LID EW/IDK/2025-2026
Open Tender
Civil Works - Others
Item Rate
60 days
KANJIKUZHY GP
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,775
Yes
₹20,126
Yes
30 Jul 2026
9 Mar 2026
21 Mar 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
9 Mar 2026 - 18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pazhayarikandam GHS toilet | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | - | - |
| 1.007 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1 | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1428099.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.11 MB
BID.pdf
Additional Documents • 1.93 MB
BOQ_1428099.xls
BOQ • 0.33 MB
NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .