Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹35.0 L+₹5,365.70 (0.15%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹35.1 L+₹17,173.59 (0.49%)Admitted-Finance POLICE LINE ROAD KUMOUR PITHORAGARH | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | vijay electricals L2 | Saun Engineering and Construction Co P Ltd L3 | D.S.ENGINEERS L1 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY OF FOLLOWING DE-CENTRALISED MATERIAL | ||||||
| 2.00 | E-CLAMP FOR 11kV | 102 | No. | 189 ₹19,278 | 190 ₹19,380 | 188 ₹19,176 Lowest |
| 3.00 | STAY CLAMP FOR SP 23 SINGLE END | 16 | No. | 189 ₹3,024 | 190 ₹3,040 | 188 ₹3,008 Lowest |
| 4.00 | STAY CLAMP FOR SP 23 DOUBLE END | 68 | No. | 249 ₹16,932 | 250 ₹17,000 | 248 ₹16,864 Lowest |
| 5.00 | Holding Clamp for TPMO & Fuse Set SP23 with N&B | 48 | No. | 189 ₹9,072 | 190 ₹9,120 | 188 ₹9,024 Lowest |
| 6.00 | Top Channel Clamp for SP-23 with N&B | 84 | No. | 189 ₹15,876 | 190 ₹15,960 | 188 ₹15,792 Lowest |
| 7.00 | LT Clamp with N&B ST Pole SP-21 | 239 | No. | 180 ₹43,020 | 179 ₹42,781 Lowest | 179 ₹42,781 Lowest |
| 8.00 | STAY CLAMP FOR SP-21 WITH NUT & BOLT | 64 | No. | 180 ₹11,520 | 179 ₹11,456 Lowest | 179 ₹11,456 Lowest |
| 9.00 | STAY CLAMP FOR SP-10 WITH NUT & BOLT | 47 | No. | 169 ₹7,943 | 170 ₹7,990 | 168 ₹7,896 Lowest |
| 10.00 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 50 | No. | 189 ₹9,450 | 190 ₹9,500 | 188 ₹9,400 Lowest |
Tender Value
₹35.0 L
EMD Value
₹75,000
Closing Date
12 May 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDING ENGINEER EDC PITHORAGARH
CONSTRUCTION OF 11 KV LT LINE AND NEW LT SUB STATION AND INSTALLATION OF DTRS IN VARIOUS VILLAGE IN DHARCHULA SECTION UNDER EDD DHARCHULA
2026_UPCL3_94739_1
06/EDC(P)/2026-27
Open Tender
Electrical Works
Item Rate
120 days
DHARCHULA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EE EDD UPCL PITHORAGARH
₹75,000
26 May 2026
27 Apr 2026
13 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUPPLY OF FOLLOWING DE-CENTRALISED MATERIAL | - | - | - | - |
| 2 | E-CLAMP FOR 11kV | 102 | No. | - | - |
| 3 | STAY CLAMP FOR SP 23 SINGLE END | 16 | No. | - | - |
| 4 | STAY CLAMP FOR SP 23 DOUBLE END | 68 | No. | - | - |
| 5 | Holding Clamp for TPMO & Fuse Set SP23 with N&B | 48 | No. | - | - |
| 6 | Top Channel Clamp for SP-23 with N&B | 84 | No. | - | - |
| 7 | LT Clamp with N&B ST Pole SP-21 | 239 | No. | - | - |
| 8 | STAY CLAMP FOR SP-21 WITH NUT & BOLT | 64 | No. | - | - |
| 9 | STAY CLAMP FOR SP-10 WITH NUT & BOLT | 47 | No. | - | - |
| 10 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 50 | No. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
06formdharchula.pdf
Tender Documents • 1.36 MB
BOQ_112086.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .