| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-AOC GURUCHARAN SAHU ODISHA | KHORDHA | ODISHA | 752034 | L1 | Accepted-AOC Accepted | |
| 2 | L1₹28.7 LRejected-AOC | L1 | Rejected-AOC Reject | |
| 3 | L1₹28.7 LRejected-AOC | L1 | Rejected-AOC Reject | |
| 4 | L1₹28.7 LRejected-AOC | L1 | Rejected-AOC Reject | |
| 5 | L1₹28.7 LRejected-AOC | L1 | Rejected-AOC Reject |
Tender Value
₹28.7 L
EMD Value
₹28,690
Closing Date
10 Aug 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
RURAL WORKS DIVISION, NUAPADA
Construction of D type Staff quarter at Govt. Ayurvedic Dispensary building at Amanara under Nuapada block district Nuapada
2026_CERWI_137833_1
RWNPD/Online-08/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Nuapada
2 documents required · 2 mandatory
₹6,000
₹28,690
Yes
31 Oct 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
3 Aug 2026 - 9 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including dressing and leveling the bed upto the required depth and depositing the excavated materials with all leads and lifts T&P shoring & Shuttering if required etc. complete as directed by the Engineer-in-charge. | 107.04 | cum | 282.89 | ₹30,280.55 |
| 2 | Supplying filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P required for the work etc. complete (measurement will be taken on finished section only etc.complete as directed by the Engineer-in-charge. | 85.66 | cum | 725.54 | ₹62,149.76 |
| 3 | Cement concrete (1:3:6 ) in foundation and plinth below the base course of terrazzo flooring using 4cm (1 1/2") size black hard hand broken granite stone metals of approved quality from approved quarry including lowering laying concrete watering and curing etc. complete to required levels laid in layers not exceeding 0'-6" thick inlcuding cost, conveyance, royalties and all taxes of all materials and cost of all labour with T & P required for the work complete. | 19.74 | cum | 6,076.39 | ₹1,19,947.94 |
| 4.01 | Brick masonary in cement mortar (1:6) using K.B.Bricks / Cement flyash of size 10" x 5" x 3" having crushing strength not lessthan 75 Kg/Cm2 after immersing the bricks for six hours in water before use in Foundation and plinth in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge. Ground Floor | 32.31 | cum | 5,435.49 | ₹1,75,620.68 |
| 5.01 | R.C.C.work of M-25 having a minimum comprresive strength (in work test) 250 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. Column Base | 22.1 | cum | 6,932.87 | ₹1,53,216.43 |
| 5.03 | Plinth Bend/Grade Beam Ground Floor | 5.98 | cum | 6,932.87 | ₹41,458.56 |
| 5.04 | First Floor | 1.31 | cum | 7,132.43 | ₹9,343.48 |
| 5.06 | Bed Block Ground Floor | 0.37 | cum | 9,454.11 | ₹3,498.02 |
| 5.08 | Lintel Band Ground Floor | 2.96 | cum | 14,664.95 | ₹43,408.25 |
| 5.09 | First Floor | 0.56 | cum | 16,410.92 | ₹9,190.12 |
stage.html
html • 0.17 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.35 MB
Tendernotice_1.pdf
PDF • 2.85 MB
BOQ_604519.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .