Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L1 | Accepted-AOC Agreement No 01/EE/2025-26 | |
| 2 | L2₹21.0 L+₹29,831.02 (1.44%)Rejected-Finance DHANAURI KUNWAR POST AKBARABAD TEHSIL NAJIBABAD DISTRICT BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | L2 | Rejected-Finance Financial Bid Open |
| Sl No | Description | Qty | Unit | VINEET KUMAR L2 | MANOJ CHAUDHARY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation i/c lead upto 30.00m & lift upto 1.50m | 448.48 | m³ | 110 ₹49,332.8 Lowest | 110 ₹49,332.8 Lowest |
| 2.00 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | 51.77 | m² | 245 ₹12,683.65 Lowest | 245 ₹12,683.65 Lowest |
| 3.00 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 76.87 | m³ | 5,765 ₹4,43,155.55 Lowest | 5,946 ₹4,57,069.02 |
| 4.00 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 156.02 | m³ | 5,465 ₹8,52,649.3 Lowest | 5,471 ₹8,53,585.42 |
| 5.00 | Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. | 23.8 | m² | 685 ₹16,303 Lowest | 685 ₹16,303 Lowest |
| 6.00 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. | 11.31 | m³ | 7,388.1 ₹83,559.41 | 7,388 ₹83,558.28 Lowest |
| 7.00 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | 0.98 | M.T | 97,230.6 ₹95,285.99 | 97,230 ₹95,285.4 Lowest |
| 8.00 | P.C.C.1:6:12 in approch slab including all cost of material, labour and T&P etccomplete. | 7.43 | m³ | 5,513.5 ₹40,965.31 | 5,513 ₹40,961.59 Lowest |
| 9.00 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 213.79 | m² | 105.3 ₹22,512.09 | 105 ₹22,447.95 Lowest |
| 10.00 | S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. | 10 | Rm | 240 ₹2,400 Lowest | 240 ₹2,400 Lowest |
Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
9 Mar 2026, 12:00 pmClosed
E.E
MGCCD-3 Amroha
LOT01 CONSTRUCTION OF D.R.B CUM FALL AT KM 3.160 OF JATPURA MINOR OF MGC STAGE-II
2026_UPIDC_1120808_1
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹42,000
5 May 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
Earth work in excavation of foundation i/c lead upto 30.00m & lift upto 1.50m
Shuttering for P.C.C. including all cost of material, labour and T&P etc complete.
Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete.
M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete.
Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete.
R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete.
Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete
P.C.C.1:6:12 in approch slab including all cost of material, labour and T&P etccomplete.
Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete.
S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete.
S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete.
S/Laying Tarfelt in 2- layers for Bearing slab. i/c all cost of material, labour and T&P etc complete.
S/L wheel Guard stone including all cost of material, labour and T&P etc complete.
Earth work in filling for making diversion ,ramp in all type soil with all lead & lead i/c all cost of labours t&p etc. complete.
Providing & Laying 1st class Brick on edge soling 110 mm thick on Diversion & Ramp i/c all cost of material, labour and T&P etc complete.
Laying Brick on edge soling with old brick including all cost of labour and T&P etc complete.
Dismantling Ist class Brick on edge soiling 110 mm thick including all cost of material, labour and T&P etc complete.
Earth work in Removing diversion with all lead & lift i/c all labour,T&P etc complete.
C.C. ( M-20) in 1:1.5:3 including all cost of material, labour and T&Petc complete.
Supplying and filling Coarse sand below c.c block including cost of all material, labour and T & P etc.
Supplying and filling Shingle(20-40 mm) below c.c block including cost of all material, labour and T&P
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.87 MB
TD01.pdf
Tender Documents • 2.98 MB
BOQ_2084969.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .