Tender Value
₹16.1 L
EMD Value
₹41,000
Closing Date
7 Oct 2026, 5:00 pm
Executive Engineer
O/o the Executive Engineer Generation Division, Kerala State Electricity Board Ltd., Chithirapuram, Idukki District
Construction of Retaining Wall and Wing Wall for Strengthening Culvert on Road to Pallivasal Power House
2026_KSEB_871069_1
KSEB/GDC T (E)-02/2026-27 dated 18.09.2026
Open Tender
Civil Works - Others
Percentage
90 days
Pallivasal Power House
Please refer Tender documents.
13 documents required · 13 mandatory
₹5,900
₹41,000
19 Sept 2026
19 Sept 2026
9 Oct 2026
22 Sept 2026
7 Oct 2026
22 Sept 2026
22 Sept 2026 - 7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drilling holes for providing anchor /dowel bars varying in depth and diameter in rock or concrete and cleaning the holes, grouting with cement grout (CM 1:2) after fixing dowel bars including cost of all materials, labour etc. complete as per specification and drawings. | 24 | mtr | 220.06 | ₹5,281.44 |
| 2 | Providing anchor bars of varying depth using Tor steel, bend, jumped, etc. including cost and conveyance of steel, labour charges, etc. complete as per the specifications and drawing as directed by the departmental officers. | 148.2 | kg | 100.19 | ₹14,848.16 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 152.02 | Cum | 359.72 | ₹54,684.63 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.11 | Cum | 7,932.89 | ₹40,505.34 |
| 5 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,042.4 | Kg | 112.43 | ₹2,29,627.03 |
| 6 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 226.05 | Sqm | 386.16 | ₹87,291.47 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 116.18 | Cum | 9,760.82 | ₹11,34,012.07 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m | 137.5 | Cum | 318.47 | ₹43,789.63 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
tenderdocs.pdf
Tender Documents • 1.04 MB
BOQ_1476287.xls
BOQ • 0.31 MB
Drawing.pdf
Other Document • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .