CONSTRUCTION OF RESIDUAL SPACE ELEMENTS FROM VASNA BARRAGE TO DAFNALA ON EAST BANK AND VASNA BARRAGE TO TORRENT POWER ON WEST BANK OF RIVER SABARMATI AND CONSTRUCTION OF WALL CLIMBING NEAR SARDAR BRIDGE ON WEST BANK OF RIVER SABARMATI
292748
2026-27
Open
Miscellaneous Works
Ahmedabad
3 documents required · 3 mandatory
₹2,400
The Executive Director, Sabarmati River Front Development Corporation Ltd
₹1.5 L
1 Apr 2026
1 Apr 2026
1 Apr 2026
29 Apr 2026
1 Apr 2026
To : The Chairman,
Sabarmati River Front Development Corporation Limited
Address : 1st Floor, Dr. Ramanbhai Patel House, West Zone Office, Ahmedabad
Municipal Corporation, Usmanpura, Ahmedabad
Gentlemen,
Having examined the bidding documents including addendum, visited the site of works, we offer to execute
the Works described above in accordance with the Conditions of Contract, Specifications, Drawings and Bill
of Quantities accompanying this Bid at the quoted percentage above/below* the contract price mention in
Bid BOQ at arrived contract Price of ________________________________ [in figures]
letters]1.
The advance Payment required is: Rupees _____________________.
This Bid and your written acceptance of it shall constitute a binding contract between us. We understand
that you are not bound to accept the lowest or any Bid you receive.
We undertake that, in competing for (and, if the award is made to us, in executing) the above contract, we
will strictly observe the laws against fraud and corruption in force in India namely “Prevention of Corruption
Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract
execution if we are awarded the contract, are listed below:
Name and address of agent Amount Purpose of Commission or gratuity
(if none, state “none”)
We hereby confirm that this Bid complies with the Bid Validity and Bid Security required by the Bidding
documents.
*: Strike out which is not applicable.
We attached herewith proof of submission of income tax returns along with profit & loss statement attached
with tax returns.
Yours faithfully,
Authorised Signature :
Name & Title of Signatory : ________________________________________________
Name of Bidder : ________________________________________________
Address : _________________________________________________
To be filled in by the Bidder, together with his particulars and date of submission at the bottom of the Form of Bid.
Signature of Bidder Page
Sabarmati River Front Development Corporation Limited
SECTION VI
BILL OF QUANTITIES
Signature of Bidder Page
Sabarmati River Front Development Corporation Limited
MEASUREMENT PREAMBLE
1. All quantities in the Bill of Quantities are estimated quantities. For all payment purposes measurements,
as prescribed in the contract document shall be taken and quantities shall be computed from such
measurements.
2. The inclusions and exclusions from quoted rates are specified in the details of each item of work in the
specifications and the Bill of Quantities. In case there is no specific mention of a particular detail, the
mode of measurements as prescribed in MORTH specifications or other standard specification for such
an item shall be followed.
3. In the event of contradiction between the MORTH specifications or other standard specification referred
to above and this Contract document, the provisions of this Contract document shall prevail.
Signature of Bidder Page
SECTION VI
BILL OF QUANTITIES
CONSTRUCTION OF RESIDUAL SPACE ELEMENTS FROM VASNA BARRAGE TO DAFNALA
ON EAST BANK AND VASNA BARRAGE TO TORRENT POWER ON WEST BANK OF RIVER
SABARMATI AND CONSTRUCTION OF WALL CLIMBING NEAR SARDAR BRIDGE ON WEST
BANK OF RIVER SABARMATI
SUMMARY SHEET
Section Amount (Rs.)
Sub Section 6.1: CIVIL WORKS
1 EARTH WORK & CARRIAGE OF MATERIAL
2 PLAIN & REINFORCEMENT CEMENT CONCRETE WORK
3 WATERPROOFING WORK
4 PAINTING/POLISHING WORKS
5 METAL WORK
6 EXTERNAL DEVELOPMENT WORK
7 PREPARATORY WORKS - RESIDUAL ELEMENTS
Sub Section 6.2: WALL CLIMBING WORKS
8 PLAY EQUIPMENT
9 PREPARATORY WORKS - WALL CLIMBING
Grand Total
Grand Total
Signature of Bidder Page No.1
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
1 EARTH WORK & CARRIAGE OF MATERIAL
1) The method of excavation shall be approved by the Engineer in
charge before execution.
2) Excavation shall be carried out very carefully without damaging
existing structures and surrounding if any.
3) If required, the contractor shall provide stabilization by any
means to protect the foundation of the existing structure and
building without any extra cost.
4) Rate shall include dewatering work (pumping out and removing
slush) while execution in underwater condition if required.
Excavation for all kinds of soil Cum 135 261.00
Earthwork in excavation for all kind of soil by any means including
getting out the excavated soil, sorting and stacking of useful
material, dressing of the sides, ramming of bottom, and disposal of
surplus excavated earth for all lead within the site area at non
objectionable place and lift up to 1.5 mt depth, including
dewatering and working in or under water and /or liquid mud,
1 including pumping out water/slush as required etc complete as
directed by engineer-in-charge. In case of excavation for pipe,
cable, any services trenches, making base for road work, pavement
works walkway, etc, proper slop and camber by any means shall be
maintain and dressing of the sides shall be made as per
requirement and as directed by engineer-in-charge.
Total Carried Over to Summary
2 PLAIN & REINFORCEMENT CEMENT CONCRETE WORK
1) All types of shuttering shall be designed by the contractor and
submitted to the Engineer in charge along with design calculations
(if required) and approved by the Engineer in charge. However, the
Stability and compatibility of shuttering shall be the responsibility of
the contractor. Shuttering shall be executed as per the approved
shop drawing. No extra payment shall be made for the above.
2) Rate shall be inclusive of dewatering work (pumping out and
removing slush) while execution in underwater conditions. The
contractor shall not claim for dewatering if required.
3) Rate shall be inclusive of providing grooves, drip moulds,
pockets, cut-outs, etc., and co-ordination of insert sleeves, insert
plate (cost of insert sleeves/ plate shall be paid separately),
encasing if any wherever required while casting for all level all
4) If required concrete batching and mixing plant of minimum
cum/hr capacity shall be set up by contractor.
5) Mould release agent of approved make shall be used at every
repeatation on formwork material.
6) Shuttering shall be compatible with self-compacting concrete
(SCC) work, wherever required.
7) Shuttering shall be compatible with heavy/bulky RCC elements,
wherever required.
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
2 Concrete (PCC) of grade - M15 Cum 42 4,290.00
Providing and laying in position Controlled cement concrete
/Ready mix concrete/ batch mix concrete of cement concrete
(PCC) of grade - M15 cement concrete work, using cement content
as per approved design mix (Min cementitious level as per latest IS
456 shall be maintained) manufactured in fully automatic batching
plant and transported to the site of work in transit mixer for all lead
having a continuous agitated mixer, for reinforced cement concrete
work including pumping from transit mixer to site of laying; cost of
admixtures in recommended proportions as per IS: 9103 to
accelerate, retard the setting of concrete, improve workability
without impairing strength and durability; finishing, compacting,
vibrating, curing, dewatering (if required), etc, including the cost of
form work and removal of formwork, dewatering (if required), etc.
complete for all level, all height/ depth and for all lead and lift and as
directed by the Engineer.
Providing and laying in position Exposed Finish controlled cement
concrete/ Ready Mix concrete/ batch mixed concrete for reinforced
cement concrete work as per design mix of specified grade using
graded black trap stone aggregates of maximum 20mm nominal
(down graded) size including fine aggregates conforming to latest IS
383 with minimum cement content (without fly ash) for durability
(followed as per IS-456 and technical specification) shall be
followed as per approved design mix for all elements of any shape
and size, at all places and heights/ depths including transporting by
transit mixer for any lead having continuous agitated mixer, laying of
concrete to site by any means i.e like pumping, tower crane or boom
placer, or any other etc., vibrating, finishing and curing etc. and
including admixtures in recommended proportions as per IS 9103 to
accelerate, retard setting of concrete, to improve workability without
impairing strength and durability as per direction of Engineer-in-
charge. Rate shall be inclusive of providing grooves, drip moulds,
ghisis, pockets, cutouts etc. and labour for insert sleeves if any
wherever required while casting.
Rate shall be inclusive of shuttering and centering/ formwork for
exposed finish concrete with pattern, lift charges, scaffolding,
staging, propping, etc and tie rod assembly of PVC cone and coil on
both sides of the concrete walls, filling the same with non-shrink
grout or polymer mortar and excluding cost of steel reinforcement.
Full height shuttering with a single pour system shall be followed.
Contractor to prepare the shuttering drawing as per the shuttering
pattern given by the architect. All concrete work shall be exposed
finish (without any honeycomb). Contractor shall use the mould
release agent of approved make before use of the shuttering
material every time.
A sample of each element shall be prepared with and without a
shuttering pattern at the location as per the instructions of the
Architect and SRFDCL Engineer in charge for review and approval
before mass execution.
if instructed for the exposed finish shuttering, the contractor is to
follow the detailed technical specification for exposed finish
shuttering and concrete given in the tender package.
3 Concrete of M 30 grade Cum 108 7,447.00
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
4 Providing and fixing Thermo-Mechanically Treated bars (Fe 550 Kg. 24314 94.00
D) Reinforcement for R.C.C. work including transporting to the work
site, straightening, cutting, bending, cranking, fabricating to required
shape, placing/ lowering in position by suitable method, and tying /
binding the system (with GI wire) all complete for all leads and lifts,
all levels, all floors, all heights/ depth, etc complete and as directed
by the Engineer in charge.
Measurement will be made on the length basis and converted into
weight by using standard co-efficient (rolling margin's and wastage
shall not be paid). No separate payment shall be made for laps,
chairs, pins, lifting hooks, spacers, and binding wire.
Providing and fixing 110 mm dia PVC pipe having capacity of
Kg/cm2 with ISI mark of required length as shown in the structure
drawing wherever pipes pass through walls as weep hole before
concreting for all level/ all depth/ height. All pipes shall be accurately
cut to the required sizes, laid as per drawing, kept in the position
while laying reinforcement and shuttering, sleeves shall not get
displaced while concreting, and burrs removed before laying. Open
ends of the pipe shall be closed as the pipe is installed to avoid
clogging while concreting. At one side of pipe, SS 304 mesh shall
be placed to protect filled soil. Rate shall be inclusive of pipe and
SS 304 mesh. Item shall not be used for diaphragm wall
construction. Actual installed length of pipe shall be measured for
5 PVC sleeve - Up to 110 mm Diameter Rmt 9 389.00
Total Carried Over to Summary
3 WATERPROOFING WORK
1) The Contractor shall repair the concrete elements by injection
grouting of suitable non-shrink grout and other suitable methods in
case of defective concreting of retaining walls, water tanks, slabs,
beams, etc., for which no extra costs shall be payable.
2) Rate shall be inclusive of surface preparation, repairing, injection
grouting, saw cutting of construction joints and filling with patch
repair mortar, making polymer mortar/Polymer CC fillets at
horizontal as well as vertical corners, etc complete. The rate shall
be inclusive of testing of elements and the system before and after
waterproofing application.
3) The latest technical system/product shall be adopted at the time
of execution.
6 Planter waterproofing (screed + Drain board) cum 26 6,368.00
Supplying and laying M25 grade vibrated concrete screed (admixed
with water proofing compound conforming to IS: 2645 and approved
by the Engineer-in-charge) in proper slope and gradient including
saw cutting (if required), making angle fillet of 50mm x 50mm at the
corners/Junction using M25 grade concrete and filling the
grooves/joints/junctions (internal& external) with PU sealant
(minimum 20 mm depth over PE backer rod). If Screed concrete
shall be laid over on existing concrete surface/existing laid stone
surface, a bonding agent shall be applied before laying of concrete.
After the laying of the required thickness screed, polypropylene
HDPE dimpled drain board (with inbuilt geo textile drainage
membrane of 100 gsm at top) shall be laid, with a minimum overlap
of 100 mm, based on soil characteristics and height of soil
overburden. Cost includes all material, labour, T&P, and wastage
involved as mentioned in the item. Actual volume of laid concrete
shall be measured for payment without considering wastage
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
7 12 to 15 mm thick water proof Plaster Sqm 322 184.00
Providing and laying 12 to 15 mm thick water proof single coat
smooth / wired finish cement plaster on sides of masonry work /
block work / RCC work, in any shape, in CM 1:3 (1 cement : 3 fine
sand) and water proofing compound of approved make in
proportions recommended by the manufacturer, finishing the
surface wired finish/ smooth finish with a floating coat of neat
cement slurry for all floors, all height including hacking to RCC
surface, scaffolding, curing etc. complete as directed by engineer-in-
Total Carried Over to Summary
4 PAINTING/POLISHING WORKS
1) All adhesives, sealants & paint shall be water based, with low
VOC with acceptable VOC content as per Green Building Norms
requirements and lead free.
2) Paint shall be applied after thoroughly brushing the surfaces, free
from mortar dropping and other foreign matter, preparing the
surface even and sand papered smooth etc, after applying every
coat of putty and primer complete.
3) Contractor shall furnish warranty paper, wherever applicable.
4) If necessary more coats shall be applied till the surface presents
a uniform appearance without any extra cost.
5) Paint shall be applied with any means (i.e. brush, roller, spray
6) Contractor shall prepare sample of minimum three shades as
suggested by engineer in charge for approval.
7) The rate shall be applicable for all floor, all level, all height by any
means of scaffolding.
8 Acrylic emulsion paint with primer - Exterior grade Sqm 2 112.00
Providing and applying 100% Acrylic Smooth exterior paint with
exterior primer of Two or more coats of paint including required
number of priming coat of exterior primer as per manufacturer's
specification of approved make and shade, having VOC (Volatile
Organic Compound) content less than 50 grams/ litre of required
shade over any surface etc complete for all floors all heights all
levels. Exterior paint and primer shall have minimum 7 years
9 Stain-repellent transparent coating - For exposed concrete Sqm 315 171.00
Providing and applying (solvent/ water based), low VOC,
breathable and biodegradable, water, oil, and stain-repellent
transparent fluorocarbon-based coating with anti-graffiti properties
(suitable product according to natural stone, exposed concrete
work) of approved make having fluoro carbon-based
nanotechnology at all heights & leads and wherever instructed by
Engineer-In-Charge. The treatment shall be in two coats wet-on-wet
or as recommended by the approved manufacturer including
preparation of surfaces by cleaning, curing, protecting, scaffolding,
etc complete. The rate includes the cost of all materials, their
application by specialized applicators by spray coating with an
airless sprayer, cleaning the substrate of all laitance, construction
dust, contaminants, scaffolding, labour, etc., all complete and at all
levels, leads and heights as per particular specification & directions
of Engineer-in-Charge. Guarantee Bond in the prescribed proforma
shall be executed by the contractor for the satisfactory performance
of the application for 5 years. The look and feel of the natural stone
surface, and exposed concrete shall not be affected by coating.
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
Total Carried Over to Summary
5 METAL WORK
1. Contractor shall prepare shop drawing base on concept design/
drawing for any type of fabrication work and get approved.
Contractor shall prepare mock-up/ prototype (as suggested) as per
approved shop drawing for approval. Work shall be carried out as
per approved shop drawing, approved mock-up/ prototype and as
suggested by Engineer in charge.
2. Rate shall be for all floor, all level all height.
3. The rate shall include cost of all types of fasteners (ETA
approved) to be used for fixing.
4. Structural stability shall be responsibility of contractor for all kind
of metal work.
5. All elements shall be factory fabricated and finished, only final
finishing to be made on site with all precautions.
6. Contractor shall coordinate all services work (cut-outs and
provisions) in metal work. All cut-out and services provisions shall
be finished at factory/ work shop.
7. contractor shall provide PVC/ nylon seprator, where two different
metals connect to avoid galvanic reactions.
10 Structural steel work - Fabrication works - with paint Kg. 394 158.00
Providing, fabricating, assembling, hoisting, erecting and fixing in
position structural steel work at all heights/ all levels/ all shapes &
sizes with all leads & lifts using any type of MS section like rolled
steel sections, hollow sections, plates, chequered plates, bar, sheet,
rod, threaded bolt, railing etc. all confirming to latest relevant IS
codes for the metal elements i.e. cycling channeling, window grill,
transom bar, bright bar in wooden door - window frame, railings,
gates, grills, bracings, foundation plate & bolt, support at truss
system, truss, purlin, rafter ,cleat, platforms, brackets, fencing pole,
platform, trench cover, flag fixing sleeve pole, garbage box, signage
pole, service elements, Jali, clamp, logo, metal dustbin as per
design intent etc. including straightening, cutting, bending, profile
cutting, embosing, bolting and welding, eatching (if required) the
members all as per structural drawings and as per detailed
specifications (for materials & workmanship) including profile
cutting, smooth grinding, machining of edges/ faces, necessary
welding (electric arc welding) for required weld lengths and sizes,
machine drilling of holes for joining/ anchoring/bolting, necessary
arrangements of templates to keep the foundation bolts in position
dry sanding, degreasing (wet cleaning) & preparation of rust-free
surface manually or mechanically, metal putty to make the surface
even and smooth, necessary scaffolding/ staging, anchor
fasteners,extra for bending elements for fixing etc complete. Incase
of Metal dustbin, openable MS Shutter shall be with invisible self-
closing hinge of required capacity and locking arrangement inside
the shutter as per design intent. Contractor shall prepare mock-up
of any element wherever required as directed by the Engineer-in-
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
Contractor shop/ fabrication prepare shop drawing and get
approved. The fabrication work shall start only after approval of the
fabrication drawings. Fabrication shall be in a perfect Architectural
workmanship manner and as provided in Section V & VI of IS 800 &
IS 7215. Contractor shall responsible against stability, safety etc all
The rate shall include for applying (on all surfaces of MS member)
two or more coats PU paint (DFT min 40 micron per coat) of
approved make and shade over two coat (DFT min 50 micron per
coat) of anti corrosive epoxy base primer for PU paint, as per
manufacturer's specification, anchor fastener etc all complete.
11 Extra charges for providing hot dip galvanizing work conforming to Kg. 394 58.00
IS 4759/2629/2633 with a zinc coating of 610 GSM thickness on any
type of MS sections for various elements like Dustbins, Railing,
Handrail, gate, grill, platform, trench cover, flag fixing sleeve pole,
garbage box, signage pole, Street furniture and similar works etc.
made for all locations, heights, and levels as per the drawings and
as instructed by the Engineer-in-Charge. The rate includes surface
preparation by shot blasting or acid washing prior to hot dip
galvanizing, as well as all necessary labour, tools, and machinery
(sample to be approved). The weight of the steel sections before
galvanization shall be measured for payment without considering
any wastage. A sample and mock-up shall be prepared for approval
by the Engineer-in-Charge before mass execution.
Total Carried Over to Summary
6 EXTERNAL DEVELOPMENT WORK
1) Stones shall be free from cracks, lines, stains, white spots of
efflorescence and even in shade for all kind of stone work.
and thickness and approved by Engineer in charge prior to
procurement.
3) Stone shall be from same lot and/ or source (stone quarry) for
same kind of work and as approved by Engineer in charge.
4) Contractor shall apply Stone Impregnation primer/ sealer coat on
back side and all edges (after cutting and finishing of the stone as
per size) of stones of approved make. Stone Impregnation primer/
sealer coat shall be of water based with pH value 7 to 10 in
minimum two coat as per manufacturer's specification and as
directed by Engineer in charge. No extra shall be paid for the same.
5) Contractor shall prepare and submit shop drawing for all kind of
stone work with sub base/ framing work/ fixing arrangement/ joinery
with all required fasteners and get approval from Engineer in
6) Mock up/ sample shall be prepared as per approved shop
drawing and get approved by Engineer in charge before execution
7) All adhesives and sealants shall be with low VOC and lead free
with acceptable VOC content as per Green Building requirements.
8) Stone work shall be carried out for all floor, all level, all height, all
places including loading, unloading, stacking, transporting, hoisting,
erecting by any means (mechanical or manual).
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
9) All type of stones shall be cut to size with help of with water jet
cutting/ laser cut/ CNC machine according to the design and shape
for best workmanship as per shop drawing.
10) Granite shall be mirror polished/ flame finished/ sand blasted/
river wash finish or other as per specified.
11) All type of stone/ stone elements shall be factory cut and factory
finished. Finish on any stone shall be as per satisfaction of
Engineer in charge. If required, final finish/ touch-up shall be
executed at site as per direction of Engineer in charge.
12) Structural stability of solid stone work shall be responsibility of
contractor.
13) Contractor shall make necessary provision for any services cut-
out/ other required provision, co-ordinate with all services work and
making good etc complete.
14) All visible surfaces of stone shall be same finished.
12 Kota Stone - For treads/copping/seating - fixing with Cement Sqm 63 1,600.00
Providing and laying machine-cut Kota stone 40 mm thick any type
of Polished/ Textured (i.e. river wash finish, leather finish, linen
finish, canvas finish etc) finish Kota stone in a single piece of any
shade (uniform), any size, and any shape in treads of steps, coping
and seating, etc as per the drawings. Kota stone slab having pencil
corner and same polished at the exposed edge in even and uniform
thickness and laid overupto 20 mm thick base of cement mortar 1:
(1 cement: 6 coarse sand)/ suitable adhesive as per manufacturer
specification, and jointed (paper joint) with grey/ white cement slurry
mixed with pigment to match the shade of the slabs, including
finishing, rubbing, curing, polishing, cleaning, protection, scaffolding,
wastage, etc. all complete for all levels, all floor, all height, and as
directed by the Engineer-in-Charge. The joint between the tread
and riser shall be finished as per the drawing.
The rate shall be inclusive of Kota stone (as per the approved
sample), fixed with cement mortar bedding/ adhesive, cement slurry,
matching pigment, all labour, etc complete. The contractor shall
arrange loose Samples for approval from the Engineer-in-Charge
before mass execution.
The actual laid area of the Kota stone shall be measured for
payment without considering any wastage.
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
13 Kota Stone - For risers of steps, dado etc. or similar - fixing Sqm 32 1,286.00
with cement mortar
Providing and laying machine-cut Kota stone 25 mm thick any type
of Polished/ Textured (i.e. river wash finish, leather finish, linen
finish, canvas finish etc) finish Kota stone in a single piece of any
shade (uniform), any size, and any shape in the risers of steps,
dado or similar etc. as per the drawings. Kota stone slab having
pencil corner and same polished at the exposed edge in even and
uniform thickness and laid in any pattern fixed on any type of
leveled surface with approximate 12 mm thick (average) cement
mortar 1:3 (1 cement : 3 coarse sand)/suitable adhesive as per
manufacturer specification, and jointed (paper joint) with grey/ white
cement slurry mixed with pigment to match the shade of the slabs,
including finishing, rubbing, curing, polishing, cleaning, protection,
scaffolding, wastage, etc. all complete for all levels, all floor, all
height, and as directed by the Engineer-in-Charge. The joint
between the tread and riser shall be finished as per the drawing.
The rate shall be inclusive of Kota stone (as per the approved
sample), cement mortar for fixing/ adhesive, cement slurry,
matching pigment, all labour, etc complete. The contractor shall
arrange loose Samples for approval from the Engineer-in-Charge
before mass execution.
The actual laid area of the Kota stone shall be measured for
payment without considering any wastage.
14 Kota Stone - For risers of steps, dado etc. or similar - fixing Sqm 5 1,834.00
with cement mortar
Providing and laying machine-cut Kota stone 55 to 65 mm thick any
type of Polished/ Textured (i.e. river wash finish, leather finish, linen
finish, canvas finish etc) finish Kota stone in a single piece of any
shade (uniform), any size, and any shape in the risers of steps,
dado, planter sides, or similar etc. as per the drawings. Kota stone
slab having pencil corner and same polished at the exposed edge in
even and uniform thickness and laid in any pattern fixed on any type
of leveled surface with approximate 12 mm thick (average) cement
mortar 1:3 (1 cement : 3 coarse sand)/suitable adhesive as per
manufacturer specification, and jointed (paper joint) with grey/ white
cement slurry mixed with pigment to match the shade of the slabs,
including finishing, rubbing, curing, polishing, cleaning, protection,
scaffolding, wastage, etc. all complete for all levels, all floor, all
height, and as directed by the Engineer-in-Charge. The joint
between the tread and riser shall be finished as per the drawing.
The rate shall be inclusive of Kota stone (as per the approved
sample), cement mortar for fixing/adhesive, cement slurry, matching
pigment, all labour, etc complete. The contractor shall arrange loose
Samples for approval from the Engineer-in-Charge before mass
execution.
The actual laid area of the Kota stone shall be measured for
payment without considering any wastage.
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
15 18 mm thick WPC Plank/board - coping/seating on bench etc. Sqm 132 1,792.00
Providing & laying 18 mm thick machine-cut External category WPC
Pank/board of any finish, any texture, any color, any shade, any
size and any shape, wpc board /plank having density 550 kg/cum
for coping, seating on bench in required design and patterns as per
the drawings, fixed with suitable adhesive of minimum 6 mm
thicknes fixing adhesive as per IS-15477 of an approved make,
including making groove as per drawing, exposed edge treatment
and champharing/ making pencil corner if required, rounded corner
treatment in even thickness and finished same as plank/board finish
as per drawing and as approved and directed by Engineer in
charge, WPC board/plank shall be used in single possible length/as
per drawing for coping / seating on bench. Necessary anchoring
shall be done if required as per design intent.
The actual laid area of the WPC Board/Plank shall be measured for
payment without considering any wastage.
16 Precast RCC Bench - modular type linear/ curvature in Plan and cum 66 36,208.00
elevation, Tube type
Providing, hoisting, stacking and arranging in position, precast
exposed fair finished modular type linear/ curvature in Plan and
elevation, bench as per design intent, made of minimum M-30 grade
RCC, with/ without a back rest of approximate size and shape as
per the design intent, as directed by the Engineer-in-charge. The
Contractor shall submit a methodology for the erection of the
precast bench and get approval from the Engineer-in-Charge.
Installed precast bench shall not be damaged in any way. The
sample shall be approved by the Engineer-in-charge before mass
production. The rate shall include for erecting and fixing the precast
bench in position as per the drawing, finishing, necessary TMT
reinforcement bars etc., complete, as directed by the Engineer-in-
Charge. The location and type of each lifting hook for erecting the
bench shall be as per the design intent and as approved by the
Engineer-in-Charge. The Architect and the Engineer-in-Charge
reserve the right to reject part or all work found to be sub standard
or not as per the approved sample and the mock-up. The sample
and the mockup shall not be payble if rejected or cast in another
location (not in scope of work area). if required bench shall be in
coloured/ pigmented concrete however additional cost of for
pigment shall be paid relevant tender item.The actual laid volume
shall be measured for payment without any wastage.
17 ACP sheet signage on Existing Pole/ New Pole for Vehicular Sqm 8 8,305.00
Direction Signages:
Providing, making and fixing 4 mm thick ACP sign of any shape and
size and of approved make to be cut on CNC router cutting and
smoothen all corners and edges. Matter shall be cut in 3M High
intensity prismatic Reflective vinyl ASTM Type 4 and paste on it as
per design and detail and as per manufacturer's specifications. UV
stabilized lamination (exterior grade) shall be done on it. The ACP
sheet shall be fixed with clamp and angle on new or any type of
Pole as per drawing. Content of sign shall be letters (in any
18 Vinyl Stickers: Sqm 8 4,239.00
Providing, Cutting & pasting of vinyl stickers of approved make
and shade with digitally printed graphic/ letter as per design and
as directed by engineer in charge. Pasting of vinyl must be accurate
as per the design on the approved size ACP without any kind of
bubbles. The rate shall also include cost of scaffolding, drilling,
fabrication, finishing, adhesive material etc at all height and all lead.
Only out to out area elevation vinyl stickers shall be measured and
paid in sqmt. The contractor should submit the drawings based on
concept design and do the sampling and get it approval before
execution.
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
19 SS Plate Signs : Sqm 8 45,746.00
Providing Making and fixing SS plate signs on 2mm thick ISI
Brushed S.S. Grade 304 plate with acid etching and duco painting.
All plates will be made in CNC Water Jet Cutting, with all edges
smoothen and all corner to be cute round. Acid etching should be
done 0.3mm deep and Use ICI duco paint for colour infill of
approved colour. The letters of made of Vinyl stickers. The font
colour shall be of as per drawing and specified by Architect. The
plate will be fixed on wall with the stud/ fastener/ adhesive tape of
3M, jointing sealant as per design as per specification and approved
by Architect or Engineer in charge. The rate shall be inclusive of
scaffolding, drilling, fasteners/ adhesive material etc. at all heights
as directed by engineer in charge. Only elevation area shall be
measured and paid. The rate shall also include cost of scaffolding,
drilling, fabrication, finishing, adhesive material etc at all height and
all lead. The contractor should submit the drawings based on
concept design and do the sampling and get it approval before
execution.
Total Carried Over to Summary
7 PREPARATORY WORKS - RESIDUAL ELEMENTS
1) The method of demolition work shall be approved by the
Engineer-in-charge before execution of work.
2) Demolition work shall be carried out by any means and as per
approved method without damaging adjoining elements/ building
and any building/ campus property.
3) The rate includes all necessary machinery, labour, tools, and
tackles for the dismantling of specified elements in any condition,
by any means, etc. complete as directed by the Engineer-in-charge
including disposing of serviceable material within the campus and
unserviceable material outside the campus for all lead and lift at the
non-objectional place as directed by Engineer-in-charge.
20 Cutting in stone, concrete, or bituminous surface Sqm 425 290.00
Labour charge for cutting in stone, concrete, or bituminous surface
to facilitate further execution work using heavy duty cutting machine
consist of diamond blade or any other required means. cutting depth
& width shall be as per actual requirement. Cutting shall be perfectly
in line. dismentle material shall be carefully removed so that the
cutting edge shall not be disturbed. all debris shall be disposed for
all lead and lift at non objectional place and as per the direction of
the engineer in charge. Surroundings shall be cleaned up to the
satisfaction of engineer in charge.
21 Dismantling of existing reinforced cement concrete (RCC) work Cum 72 1,526.00
of any grade and any type, using mechanical or manual methods as
advised by the Engineer-in-Charge. This includes cutting
reinforcement, and providing necessary tools, plant, and scaffolding.
The work also involves sorting the dismantled material, disposing of
unserviceable material at an approved location, and stacking the
serviceable material with all necessary all lifts and all leads, as
directed by the Engineer-in-Charge.
The volume of the existing RCC work shall be measured for
payment before the dismantling begins. The method for calculating
the volume for payment shall be approved by the Engineer-in-
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.1 - CIVIL WORKS
Total Quantity
estimated but Unit Rate Total amount
estimated but Unit Rate Total amount
Sr. No. Description Unit
may be more (In Rs.) (In Rs.)
22 Chemical Anchor:
Supplying, Drilling/ Cleaning hole and injecting grouting chemical
with the help of dispenser, into a hole of dia & depth as per
manufacturer/ structural consultant's specification and fixing rebar of
the required diameter subsequently. Fixing methodology shall be
followed as per manufacturer’s guidelines. Steel will be paid under
relevant item. Manufacturer to submit Rebar Depth Calculation
based on design loads & other parameters as provided by
consultant and in accordance with EOTA-TR-023/029 “guidelines
for post installed rebar connections” for approval. Rate shall be
inclusive of all material, labour, necessary scaffolding etc complete
for all height as directed by engineer in charge.
23 Rebaring :
Providing material and labour for Drilling/ Cleaning hole and
injecting grouting chemical with the help of dispenser, into a hole as
per manufacturer/ structural consultant's specification and fixing
rebar of the required diameter subsequently. Fixing methodology
shall be followed as per manufacturer’s guidelines. Steel will be paid
under relevant item. Manufacture to submit Rebar Depth
Calculation based on design loads & other parameters as provided
by consultant and in accordance with EOTA-TR-023/029 “guidelines
for post installed rebar connections” for approval. Rate shall be
inclusive of all material, labour, necessary scaffolding etc complete
for all floors, all height as directed by engineer in charge.
23.1 a) hole of dia 8mm and depth min 120mm No 610 197.00
23.2 b) hole of dia 10mm and depth min 150mm No 1230 273.00
23.3 c) hole of dia 12mm and depth min 180mm No 610 360.00
23.4 d) hole of dia 16mm and depth min 240mm No 410 557.00
Total Carried Over to Summary
TOTAL OF SUB SECTION 6.1 - CIVIL WORKS
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.2 - WALL CLIMBING WORKS
estimated Unit Rate Total amount
estimated Unit Rate Total amount
Sr. No. Description Unit Refrence Images.
but may be (In Rs.) (In Rs.)
8 PLAY EQUIPMENT
24 Wall Trainers Lot 1.0 9,49,621.00
Supply and Fixing of Wall Trainer as per the approved make and as per design intent. The
product to match the colours, design, size, contours and aesthetics exactly as per the image
attached/ design intent for all level, all height, all lift by any means."As per NIUA Guidelines, all
products must be tested and certified to meet EN 1176 safety standards. The EN
certificates must be issued by a reputed notified International Certifying Body such as IPEMA,
TUV, CPSC, or SGS only. All components shall meet the EN-16630 safety standards.
The Contractor shall submit a methodology statement with all relevant details in illustrative sketch
and technical data sheet form before execution as per manufacturers' specifications. The
Contractor shall be fully responsible for the structural stability & performance of the whole system.
All execution work shall be executed through an approved specialised agency of an approved
manufacturer or shall be executed by the manufacturer itself. also the technical specification
mentioned is as follows. Manufacturers shall provide warranty of minimum 1 year from the date of
the handover for that the System (s) shall be free from defects in materials and workmanship (the
Materials and Workmanship Warranty), and shall work properly in accordance with the
requireemnt and all parts i.e. Structural/Non structural Metallic Parts, all Non metalic parts,
PLASTIC parts and all other parts which is included in this system. Rate shall be inclusive of
maintenance and Defect Liability for a period of 5 years from the date of substantial handover
without any extra cost, including replacing same approved any type of parts/systems within a
minimum of 1 week of the complain. preventive maintenance is also included.
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.2 - WALL CLIMBING WORKS
estimated Unit Rate Total amount
estimated Unit Rate Total amount
Sr. No. Description Unit Refrence Images.
but may be (In Rs.) (In Rs.)
In this item, with the mode of measurement of LOT, 2 Sets of Double ring system, 1 set of Pull up
bar system & 2 sets of Pull up rack system, safety signage as per design requirement shall be
provided as per design intent and as mentioned below. approximate Overall dimension of the
whole wall trainer system shall be 8.5 X 3.25 m. All type of incidental work, Civil work or other
work to complete this system up to the satisfaction of the engineer in charge and as per
manufacturers prescription is included in this item.
Double Ring: Approximate dimension: 1.5 m x 1 m x 1.75 m
2 sets per lot of double ring shall be provided, which shall be made of approximately 40 X 80 mm
square pipe. Main Framework on both sides, Minimum 2 mm thick Galvanized Steel Plate to
cover the Main Framework as per design intent. the required length SS 304 chain with a lifting
ring shall be provided as per design intent. Minimum weight of the 1 set of the double ring shall
Pull-up bar: Approximate dimensions: 1.6 m x 1.15 m x 1.04 m
Main pole made of approximately 60 x 3 mm Hot-galvanised Steel Pipe, Handrail made of
approximately 32 x 3 mm Hot-galvanised Steel Pipe as per design intent. Minimum weight of the
1 set of pull-up bar shall be 30 Kg.
PULL UP RACK: 1.25 m x 1.0 m x 0.75 m
2 sets per lot of main framework shall be provided, which shall be made of approximately 40 X
mm square pipe, with a minimum 2 mm thick Galvanized Steel Plate to cover the Main
Framework as per design intent. the required length SS 304 chain with a lifting ring shall be
provided as per design intent.
For all systems, all joints shall be robotic weleded and color pallet of the system shall be
approved before execution. All systems shall be fixed to an existing wall of any material with the
required capacity of the anchor bolt/chemical anchor/mechanical anchor/washer, Lock nut with
cap cover, threaded rod, LED screw, Wall connecting plate/base plate with required thickness
and size, etc as per manufacturers specification. and it shall be as per the requirement of weight
lifting capacity of the system. Necessary pull-out test shall be made as per manufacturers
specifictaions, and Certification of pull-out testing is to be produced by the anchoring
manufacturer. all metal surfaces shall be of any colour, any shade powder-coated as per design
intent if nowhere else specified.
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.2 - WALL CLIMBING WORKS
estimated Unit Rate Total amount
estimated Unit Rate Total amount
Sr. No. Description Unit Refrence Images.
but may be (In Rs.) (In Rs.)
25 Wall Climbing play system Lot 1.0 44,80,452.00
Supply and Fixing of the wall climbing play system as per the approved make and as per design
intent. The product to match the colours, design, size, contours and aesthetics exactly as per the
image attached/ design intent for all level, all height, all lift by any means."As per NIUA
Guidelines, all products must be tested and certified to meet EN 1176 safety standards. The EN
1176 certificates must be issued by a reputed notified International Certifying Body such as
IPEMA, TUV, CPSC, or SGS only. All components shall meet to EN-16630 safety standards.
The Contractor shall submit a methodology statement with all relevant details in illustrative sketch
and technical data sheet form before execution as per manufacturers' specifications. The
Contractor shall be fully responsible for the structural stability & performance of the whole system.
All execution work shall be executed through an approved specialised agency of an approved
manufacturer or shall be executed by the manufacturer itself. also the technical specification
mentioned is as follows. Manufacturers shall provide warranty of minimum 1 year from the date of
the handover for that the System (s) shall be free from defects in materials and workmanship (the
Materials and Workmanship Warranty), and shall work properly in accordance with the
requireemnt and all parts i.e. Structural/Non structural Metallic Parts, all Non metalic parts,
PLASTIC parts and all other parts which is included in this system. Rate shall be inclusive of
maintenance and Defect Liability for a period of 5 years from the date of substantial handover
without any extra cost, including replacing the same approved any type of parts/systems within a
minimum of 1 week of the complain. preventive maintenance is also included.
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.2 - WALL CLIMBING WORKS
estimated Unit Rate Total amount
estimated Unit Rate Total amount
Sr. No. Description Unit Refrence Images.
but may be (In Rs.) (In Rs.)
In this item, with the mode of measurement of LOT, the whole system consisting HDPE Panels,
Elements like clouds, Ring, Car, pegs etc, Monkey trail, Ladder & climbing rope, safety signage
as per design requirement etc shall be provided as per design intent and as mentioned below.
approximate Overall dimension of wall climbing play system shall be 8.5 X 3.25 m. All type of
incidental work, Civil work or other work to complete this system up to the satisfaction of the
engineer in charge and as per manufacturers prescription is included in this item.
Minimum 30 mm thick HDPE panels in any shape, any size, any color and any shade, any finish
shall be fixed on the existing wall by suitable means as per manufacturers specifications. HDPE
panel shall have reserved holes for fixing arrangement through anchor bolt, hexagonal socket
head cap screw, washer, nylon rods, furniture nut etc. and it shall be properly fixed with the
existing wall as per capacity required. also, elements like clouds, rings, wooden blocks, climbing
pegs and other shapes etc shall be fixed on HDPE panel as per design intent and as per
manufacturers specification and it shall be fixed up to the RCC wall through necessary
accessories/fixing arrangement. Also, required size Monkey trail made of SS 304 48 mm dia
metal frame & SS 304 32 mm dia hanrail shall be fixed to wall as per design intent with required
capcity and type anchor fastners. minimum 3 sets of SS lader & and 6 no of polypropylene ropes
with covered braided multifilament shall be fixed to monkey ladder for climbing purpose with
required fixing arrangement.
For all systems, all joints shall be robotic weleded and color pallet of the system shall be
approved before execution. All systems shall be fixed to an existing wall of any material with the
required capacity of the anchor bolt/chemical anchor/mechanical anchor/washer etc as per
manufacturers specification. and it shall be as per the requirement of weight lifting capacity of the
system. Necessary pull-out test shall be made as per manufacturers specifictaions, and
Certification of pull-out testing is to be produced by the anchoring manufacturer. all metal
surfaces shall be of any colour, any shade powder-coated as per design intent if nowhere else
specified.
26 Play Area flooring Sqm 100.0 3,905.00
Providing & Fixing of minimum 30 mm thick Rubber flooring interlocking tile Carpet with any size,
any shape, any color, any finish and any shade as per design intent for all floor, all height, all
level including fixing adhesive as per manufacturer's specifications and self levelling compound (if
required) of required thickness of approved make and series as per design intent. Rubber flooring
shall be with 15% EPDM & 85% SBR, Density (kg/m3):1000/1200, Hardness (Shore a):68,
Stretch (MPA):2.2, Abrasion resistance: 0.0075g (ASTM-D4060-01), Rebound resistance: 55%,
Shape deformation: 42%, Warranty - 3 years. The sample shall be approved by engineer in
charge before procurement. The rate shall be inclusive of fixing adhesive, self levelling
compound, wastage, materials, installation, transportation charges, taxes, labour for all floors/all
heights and all levels etc. The actual laid area shall be measured for payment without considering
any wastage.
Total Carried Over to Summary
Signature of Bidder Page No.
BILL OF QUANTITIES
SUB SECTION
6.2 - WALL CLIMBING WORKS
estimated Unit Rate Total amount
estimated Unit Rate Total amount
Sr. No. Description Unit Refrence Images.
but may be (In Rs.) (In Rs.)
9 PREPARATORY WORKS - WALL CLIMBING
1) The method of demolition work shall be approved by the Engineer-in-charge before execution
2) Demolition work shall be carried out by any means and as per approved method without
damaging adjoining elements/ building and any building/ campus property.
3) The rate includes all necessary machinery, labour, tools, and tackles for the dismantling of
specified elements in any condition, by any means, etc. complete as directed by the Engineer-in-
charge including disposing of serviceable material within the campus and unserviceable material
outside the campus for all lead and lift at the non-objectional place as directed by Engineer-in-
27 Cutting in stone, concrete, or bituminous surface Rmt 30.0 155.00
Labour charge for cutting in stone, concrete, or bituminous surface to facilitate further execution
work using heavy duty cutting machine consist of diamond blade or any other required means.
cutting depth shall be up to 200 mm or as per actual requirement. Cutting shall be perfectly in
line. dismentle material shall be carefully removed so that the cutting edge shall not be disturbed.
all debris shall be disposed for all lead and lift at non objectional place and as per the direction of
the engineer in charge. Surroundings shall be cleaned up to the satisfaction of engineer in
28 Dismantling of existing concrete, reinforced cement concrete (RCC) work of any grade and Cum 25.0 1,526.00
any type, using mechanical or manual methods as advised by the Engineer-in-Charge. This
includes cutting reinforcement and providing necessary tools, plant, and scaffolding. The work
also involves sorting the dismantled material, disposing of unserviceable material at an approved
location, and stacking the serviceable material with all necessary all lifts and all leads, as directed
by the Engineer-in-Charge.
The volume of the existing RCC work shall be measured for payment before the dismantling
begins. The method for calculating the volume for payment shall be approved by the Engineer-in-
Total Carried Over to Summary
TOTAL OF SUB SECTION 6.2 - WALL CLIMBING WORKS
Signature of Bidder Page No.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Vol. 1 - GCC and SCC.pdf
Vol. 2 - Technical Specifications.pdf
Vol. 3 - BOQ.pdf
Vol. 4 -Tender Drawing Set_compressed.pdf
Download all tender documents and submit your bid