Detailed Topographical Survey using Total Station/ DGPS & Drone for Proposed Ring corridor of 36.169 Km Elevated Viaduct from APMC End to APMC End (Chainage 0.000 to 36169.007), including 26 Nos. of Elevated stations of Ahmedabad Metro Rail Project Phase -III (C)
310887
GMRC/TOPOGRAPHICAL SURVEY/PH-III (C)/2026
Open
Survey Works
Gandhinagar
9 documents required · 8 mandatory · 1 optional
₹5,000
₹89,800
3 Jun 2026
3 Jun 2026
3 Jun 2026
24 Jun 2026
3 Jun 2026
BILL OF QUANTITIES
1.0 The Bill of quantities shall be read in conjunction with the Instructions to Bidders, Conditions of
Contract, Scope of Work / Specifications.
2.0 The quantities given in the Bill of quantities are estimated quantities. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor and verified by the
Engineer / Employer and valued at the rates and prices tendered and accepted in the priced
Bill of Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3.0 The rates and prices tendered in the priced Bill of Quantities shall include all equipment, plant,
tools (i.e. computer hardware and software), manpower, labour, supervision, overheads,
consumables, materials, erection, maintenance, testing of input material delivered, profit, taxes
and duties together with all general risks, liabilities and obligations set out and implied in the Contract
and other incidentals to comply with the requirements of technical specifications and scope of work.
4.0 The rates and prices shall be quoted entirely in Indian Currency.
5.0 The payment will be made on actual basis as per the accepted rates, terms & conditions, based
on the activities carried out, as per the work order issued by the competent authority, as and
when required and after submission of necessary data & report. 10% of the contract value will be
released on submission of final data & report and handing over the points / pillars to the
respective civil contractors or completion of Defects Liability Period mentioned Sub clause 10.1 of
SCC, whichever is earlier.
6.0 The financial bid is to be submitted online on https://gmrc.nprocure.com. The other relevant
clause of submission of bid is clarified in ITT, Para / Clause D 1 to D
GMRC Financial Package Page 2 of
Tender No: GMRC/TOPOGRAPHICAL SURVEY/PH-III (C)/2026 BOQ
FINANCIAL BID FORM
To : The Managing Director,
Gujarat Metro Rail Corporation (GMRC) Limited
Address : Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan,
Sector 10/A, Gandhinagar: 382010, Gujarat, India
Name of Work: Detailed Topographical Survey using Total Station/ DGPS & Drone for Proposed Ring corridor of
36.169 Km Elevated Viaduct from APMC End to APMC End (Chainage 0.000 to 36169.007), including 26 Nos. of
Elevated stations of Ahmedabad Metro Rail Project Phase -III (C)”
1. Having examined the site of works and Bid Documents, comprising Instructions to Bidders, Scope of
works, Conditions of Contract, Technical Specifications / Scope of Work, Bill of Quantities I/we, the
undersigned offer to execute and complete such works and remedy any defects therein in conformity
with the said bid documents for the sum of Rs. (Rupees
) or such other sum as may be ascertained in accordance
with the said Bid documents.
2. We undertake, if our Bid is accepted, to commence the work from issuance of LOA / receipt of the order
to commence the work, and to complete and deliver the sections and whole of the works comprised in
the Contract within the period (i.e. 4 Months) stated in the bid hereto.
3. If our Bid is accepted, we will furnish Performance Security (ies) in the form of a Bank Guarantee to be jointly
and severally bound on us, in accordance with the Conditions of Contract.
4. We agree to abide by this Bid for the period of One Hundred &eighty (180) days from the last date fixed
for Bid Submission and it shall remain binding upon us and may be accepted at any time before the expiry of
5. We confirm our agreement to treat the Bid documents and other records connected with the works as secret
and confidential documents and shall not communicate information contained therein to any person
other than the person authorized by the Employer or use such information in any manner prejudicial
to the safety and integrity of the works.
6. Unless and until an agreement is prepared and executed, this Bid, together with your written acceptance
thereof, shall constitute a binding Contract between us, but without prejudice to your right to withdraw such
acceptance without assigning any reasons thereof.
7. We understand that you are not bound to accept the lowest or any bid you may receive.
We attach herewith proof of submission of income tax returns along with profit & loss statement attached with tax
Yours faithfully,
Authorized Signature :
Name & Title of Signatory :
Name of Bidder :
Address& Mobile No. :
Email Address :
GMRC Financial Package Page 3 of
Tender No: GMRC/TOPOGRAPHICAL SURVEY/PH-III (C)/2026 BOQ
Bill of Quantity (BOQ)
Name of Work : Detailed Topographical Survey using Total Station/ DGPS & Drone for Proposed
Ring corridor of 36.169 Km Elevated Viaduct from APMC End to APMC End (Chainage 0.000 to
36169.007), including 26 Nos. of Elevated stations of Ahmedabad Metro Rail Project Phase -III (C)”
Description of work Unit Quantity Rate (Rs.)
Providing and fixing concrete pillars for Traverse
Control Points @ 200m interval or DGPS/Reference
pillars of size 400x400x600mm (Proportion
cement : 2 sand : 4 coarse aggregate 20 mm down)
1 including required excavation, disposal of Nos. 185 942.30
excavated materials, curing, compaction, leveling of
top surface, etc. The rate includes providing and
fixing 20mm dia MS rod, 300mm long with cross
anchoring by 10mm dia MS rod.
Establishing DGPS stations at an interval not more
than 2-2.5 Km with one pair at the interval of not
more than 200-250 m. The DGPS station shall be
located on concrete pillars for base static
observation 1 hrs and 0.30 hrs rover observation
(Raw data to be provided).
Closed traverse with total station 1” instrument
between DGPS to DGPS with an accuracy of
1:50000 by observing 3 set of face left and 3 set of
face right (Raw data to be provided).
Detailed Topographical Hybrid Survey using Total
Station/ DGPS & Drone along proposed route
alignment, Stations and Depot Area. The work
includes integrating the Total Station/ DGPS data
with Drone image in the background using the
Ground Control points established. Images should
be taken using 18-20 Mega Pixel high resolution
camera suffice to get final resolution of 5cm. Image
overlapping should be minimum 75% forward &
55% sideways & constant flying height (upto 60m)
to be maintained in each flight. The images must
have XYZ coordinates & rotational information &
should not be taken in zig-zag manner, which leads
to gaps in the data. Drone data shall be provided
along with RAW & processed Imagery. (All the
above needs to be carried out with adjusted
traverse/DGPS coordinates. All surface features,
ground levels and over-ground utilities shall be
taken. All building location, its shape, height within
width of 50 m from centre line on either side along
viaduct and at station location 100 m from centre
line of viaduct on either side or upto builtup line
shall be taken. Drawing shall be submitted in soft
Description of work Unit Quantity Rate (Rs.)
GMRC Financial Package Page 4 of
Tender No: GMRC/TOPOGRAPHICAL SURVEY/PH-III (C)/2026 BOQ
Closed Leveling
(To be carried out from Survey of India Bench
Mark with accuracy 6(√Km.) mm Digital leveling
instrument shall be used to establish bench mark.)
Providing and fixing concrete pillar for Land
Boundary marking (Proportion 1 cement: 2 sand:
coarse aggregate 20 mm down) 100 mm x 100 mm
x 1200 mm depth @ 200m interval.
Pegging of alignment, pier/station location marking
and reference points.
(The pegging of the alignment should be done
along the centre-line of the alignment at an interval
7 of 25m c/c on straight profile and 15m c/c on Km 40 15751.71
curved area or as directed by the engineer-in-
charge, marking the tangent points, apexes, ST,
TC, CC, CT and TS points on the corridor or as
directed by the engineer- in-charge.)
Tree marking in station and wherever required in
Viaduct area.(painting background, number to be
written prominently by paint) including preparation
of data in excel format by noting down the girth,
species and plotting the same reference in the
Regular levelling and drawing of L-Section along
C/L of alignment
Contractor’s Quote in % above / below / at par (in figure)
Contractor’s Quote in % above / below / at par (in word)
Seal and Signature of the Bidder
i)The quantities mentioned above except for Sl. No. 8 may vary ±25% and the contractor will have to execute
them at the same rate, terms and conditions.
ii) The quantities mentioned for Sl. No. 8 may vary to any extant as per site condition and the contractor will
have to execute them at the same rate, terms and conditions.
The bifurcations of tax is required to furnish in Annexure – 2, Details of Taxes and Duties.
GMRC Financial Package Page 5 of
Tender No: GMRC/TOPOGRAPHICAL SURVEY/PH-III (C)/2026 BOQ
Annexure – 2, DETAILS OF TAXES AND DUTIES (Tax Bifurcation) INR: Indian Rupees
GST (Goods and Services Tax) Total
Customs Duty Amount
CGST SGST IGST Any other Tax
SN Amou Amou Amount Amount Duties in
nt on nt on Amount on on INR
which Rate which Rate Amount Rate on which which Rate Amount which Rate
unt nt nt (6) = sum
tax/ (%) tax/ (%) (INR) (%) tax/ duty tax/ (%) (INR) tax/ (%)
(INR) (INR) (INR) of (1) to
duty duty levied duty duty
levied levied levied levied
Note: 1 Contractor at any point of time shall be bound to share the details pertaining to the Input Tax Credit availed or to be availed along with
the supporting documents.
Note:2 In the Tax Schedule Contractor shall require to furnish component wise tax details.
Note:4 GST TDS will be deducted from the invoice considering the prevailing rates
Note 5: It shall be sole responsibility of Contractor to pass all the accrue or to be accrued Input tax credit to GMRC as per Section 171 of CGST Act.
GMRC Financial Package Page 7 of
Tender No: GMRC/TOPOGRAPHICAL SURVEY/PH-III (C)/2026 BOQ
PROFORMA FOR STATEMENT OF MINOR DEVIATIONS
(Refer C26 of ITT)
1The following are the particulars of minor deviations from the requirements of the Tender Document:
Sr. No Clause Deviations Price adjustment for each
1 The Tenderer shall indicate price adjustment against each deviation in Annexure 8A of BOQ. This price is the price
which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer.
2 Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No
Deviation(s). In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the
tenderer has not proposed any deviations from tender documents.
3 If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other
than in this Annexure, it will have no effect.
Signature of authorized signatory on behalf of tenderers
GMRC Financial Package Page 8 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20260603 NIT.pdf
2. ITT.pdf
3. FOT.pdf
4. GCC.pdf
5. SCC.pdf
6. SOW.pdf
7. BOQ.pdf
Download all tender documents and submit your bid