Loading…
Loading…
Tender ID
Tender Value
₹9.7 L
EMD Value
₹19,411
Closing Date
16 Apr 2026, 3:00 pmClosed
Executive Engineer, Capital Complex Division, PWD
O/o the Executive Engineer, Capital Complex Division, PWD(Buildings), Agartala
Routine maintenance of High Court building during the year 2026-27 under PWD Capital Complex Sub-Division-I, Kunjaban Extension, Agartala(Group-I).
2026_CEPWD_71965_1
05/DNIT/EE/CCD/PWD/2026-27
Open Tender
Civil Works - Building
Percentage
180 days
Capital Complex, Agartala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹19,411
18 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | -All kinds of soil | - | cum | - | - |
| 2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | |||||
| 2.01 | -All kinds of soil | - | cum | - | - |
| 3Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: i) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 5First class brick work in foundation and plinth including cost of all materials as required complete:- | |||||
| 5.01 | In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | cum | - | - |
| 6Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position : | |||||
| 6.01 | Local Teak Wood | - | Cum | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.23 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_73240.xls
BOQ • 0.39 MB
fdnit.pdf
Tender Documents • 3.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .