| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 Cr+₹21.2 L (11.2%)Rejected-AOC KARITHALAKKAL PUTHEN VEEDU ELAVANKKARA VELIYAMCODE PO TRIVANDRUM | TRIVANDRUM | ₹2.1 Cr+₹21.2 L (11.2%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S SAJEER L1 | SURESH KUMAR P L2 |
|---|---|---|---|---|---|
| 1.00Detailed Estimate | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 563.5 | cum | 226.16 ₹1,27,441.16 Lowest | 249.66 ₹1,40,683.41 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 56.35 | cum | 6,964.16 ₹3,92,430.42 Lowest | 7,687.5 ₹4,33,190.63 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 301 | sqm | 339 ₹1,02,039 Lowest | 374.21 ₹1,12,637.21 |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 850 | sqm | 737.07 ₹6,26,509.5 Lowest | 813.63 ₹6,91,585.5 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 165 | sqm | 669.73 ₹1,10,505.45 Lowest | 739.29 ₹1,21,982.85 |
| 1.01 | OD332125/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: No additional cost payable for excess cement used beyond the specified cement content.
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 165.75 | cum | 9,559.78 ₹15,84,533.54 Lowest | 10,552.72 ₹17,49,113.34 |
| 1.01 | OD332126/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: No additional payment for excess cement used beyond the specified cement content
All work above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum | 274.05 | cum | 11,345.83 ₹31,09,267.98 Lowest | 12,524.27 ₹34,32,213.57 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 34,661.64 | kilogram | 98.69 ₹34,20,757.25 Lowest | 108.94 ₹37,76,039.06 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 50,490.75 | kg | 98.69 ₹49,82,932.12 Lowest | 108.94 ₹55,00,462.31 |
Tender Value
₹2.2 Cr
EMD Value
₹1 L
Closing Date
23 Mar 2026, 4:00 pmClosed
O/o The Superintending Engineer,PWD Judicial Blds
O/o The Superintending Engineer,PWD Judicial Blds
The estimate is prepared for compound wall after demolishing and to reconstruct with RCC retaining wall for a length of 85 m length and balance portion with RR masonry retaining wall
2026_PWD_846922_1
PWD/BLDG/TR/550/2022_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvanamthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹8,270
₹1 L
Yes
online google meet
27 Jun 2026
12 Mar 2026
25 Mar 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
12 Mar 2026 - 23 Mar 2026
16 Mar 2026
Detailed Estimate
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
OD332125/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: No additional cost payable for excess cement used beyond the specified cement content. All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum
OD332126/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: No additional payment for excess cement used beyond the specified cement content All work above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
OD293003/2025-2026:Random rubble masonry with departmental hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) Considering the top of the retaining wall as the Ground level
OD293004/2025-2026:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
OD335434/2025-2026:Providing weep holes using75 mm PVC pipes working pressure4kg/sq cm including cost of material,conveyance ,labor charges etc.complete ,BASED ON 60.6
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
viewsbd.pdf
Tender Documents • 1.80 MB
BOQ_1430969.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .