Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹28.6 L
Closing Date
21 Dec 2026, 3:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
NAGDA-KOTA Section - TSR(P) - 59.325 Kms by PQRS with contractor's portal 56.398 kms & manual - 2.927 kms including subsidiary work with BCM.
218-2026~WCR
218-2026
Open
Works - General
18 Months
Kota, Rajasthan
₹0
₹28.6 L
26 Nov 2026
26 Nov 2026
7 Dec 2026
90 days
107 items across 5 schedules · ₹14,72,49,456.36 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Through Sleeper Renewal (TSR) with PSC sleepers involving removal existing sleepers of any type along with fittings from track, insertion of PSC sleepers lying along the cess / formation / slope / toe within 5 metres height with all fittings to specified spacing, gauge and squareness, one round of through packing to make track fit for 20 kmph speed, dressing of ballast to standard profile, all in accordance with the latest provisions of IRPWM and stacking of all released material neatly at specified places within an average lead of 100 m as directed by Engineer in-charge. | — | — | — | — | |
| 1 | For PSC wider base sleepers - For location of work not involving deep screening | Each | 3755.00 | 375.18 | 14,08,800.9 |
| 2 | For PSC wider base sleepers - For location of work involving deep screening. (deep screening to be paid separately) | Each | 1104.00 | 209.14 | 2,30,890.56 |
| Re-spacing of existing PSC sleepers for Increasing Sleeper Density (ISD) work in track after marking of sleeper spacing as per required sleeper density, including fixing all fastenings and initial packing and all associated work required to complete the work, as directed. Note: Insertion of new sleeper will be paid extra under relevant item. | — | — | — | — | |
| 3 | For location of work not involving deep screening | TRM | 2262.00 | 173.9 | 3,93,361.8 |
| 4 | Through Fitting Renewal (TFR) on PSC track, comprising of renewal of Grooved Rubber Pads, Liners and ERCs without damaging PSC sleepers. Scope includes removal of all fittings, cleaning of rail seat, rail flange at liner seats, and eye of Inserts with wire brushes and applying Grease Graphite Grade "O" (IS:408) to eye of insert and central leg of ERC with contractor's grease of Railway's specification, fixing all fittings in correct position and sealing liner edges with grease all complete including collection and stacking of released materials at nominated locations within SSE Jurisdiction as directed by Engineer-in-Charge. Note: All the fittings will be supplied at SSE/Stores/Depot. | Sleeper | 8300.00 | 36.22 | 3,00,626 |
| 5 | Lubrication of Elastic Rail Clips on PSC sleepers with contractor's grease, conforming to Railway's specifications, labour etc. complete as per procedure prescribed in latest edition of IRPWM. | ERC | 19436.00 | 4.6 | 89,405.6 |
| 6 | Lubrication of gauge face of rail on curves, cross overs, points & crossings, turn-in curves and at locations as required with contractor's grease graphite grade "O" IS 408 and as directed. | RM | 5050.00 | 6.13 | 30,956.5 |
| Drilling of hole of different diameter and chamfering, in rail of any section and any UTS manually only in emergencies with contractor's labours, tools & plants, consumables etc. | — | — | — | — | |
| 7 | Hole of dia. 26.5mm and above | Each | 30.00 | 279.14 | 8,374.2 |
| Manual deep screening of Plain track/ turnouts as per procedure prescribed in IRPWM, June 2020 or latest, on PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts. | — | — | — | — | |
| 8 | Depth of 300 mm below bottom of sleeper - For Plain Track : | TRM | 5750.00 | 609.95 | 35,07,212.5 |
| 9 | Lifting and packing for regrading the existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge. | TRM | 5000.00 | 187.56 | 9,37,800 |
| 10 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 12000.00 | 27.59 | 3,31,080 |
| Unloading of ballast from Railway's Hopper Wagons, quantity distribution as per pre- defined site requirement, clearing infringements/jammed ballast, distributing the unloaded ballast uniformly over the track, profiling and boxing following all prescribed safety norms. | — | — | — | — | |
| 11 | Under Traffic Block Conditions: | cum | 77897.00 | 55.06 | 42,89,008.82 |
| 12 | In-situ reconditioning of MCI insert of points & crossings sleeper by reclaiming the worn-out portion to the desired height, grinding of the finished profile for regaining the toe load lost. The reconditioning to be done by using TERRA C I-94 - Electrodes of make L & T, Advani Oerlicon, Diffusion, SHARP - 650, or equivalent approved by RDSO for reconditioning of Cast iron alloys. removing and refixing the required fittings for reconditioning in traffic condition. The cost includes all labour, lead lift, transportation of men and material, cost of consumables, hiring of machinery required etc, complete and as directed by the Engineer- in -charge. | Each | 700.00 | 367.63 | 2,57,341 |
| Picking up of slacks in track of all sleeper density, duly opening up ballast, gauging, alignment, correcting longitudinal & cross levels, packing, boxing of ballast and dressing the same under traffic conditions as per procedure prescribed in latest edition of IRPWM and as directed by Engineer in-charge. Note: In-charge section Engineer should identify locations requiring packing and obtain prior approval of DEN/XEN before execution of the work when there is no Zonal Track Maintenance agency deployed in the section. | — | — | — | — | |
| 13 | For PSC Sleeper | TRM | 6000.00 | 93.84 | 5,63,040 |
| First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. | — | — | — | — | |
| 14 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 7300.00 | 144.51 | 10,54,923 |
| De-stressing of LWR/CWR track of any density under traffic line block with contractor's labours, tools, equipments and consumables inclusive of all lead & lift. Activities include cutting of LWR/CWR into convenient panels of specified length, removal of ERCs, liners, greasing of ERCs and liner contact area, lifting rails and keeping them on rollers provided at every 15 sleepers, working out elongation of rail ends depending on prevailing site conditions, pulling rails with the help of Hydraulic Tensor to achieve the desired elongation, cutting rails, as required, removing rollers and placing rail in position, re-fixing ERCs & liners and adjustment of gap at SEJs : Note: (1) Welding of rail joints will be paid separately. (2) Rail cutting and Hole drilling shall be paid separately. (3) Opening and closing of LC if required will be paid separately. (4) As per procedure prescribed in latest edition of IRPWM & CE's Circulars for destressing of LWR/CWR, if any. | — | — | — | — | |
| 15 | Without Rail tensor | TRM | 35437.00 | 50.9 | 18,03,743.3 |
| Fixing of Wooden Distance Block of size 1.0m x 0.3m x 0.15m between track and platform wall. | — | — | — | — | |
| 16 | With Contractor's hard wood block. | Each | 495.00 | 2,940.04 | 14,55,319.8 |
| 17 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM | 53000.00 | 15.62 | 8,27,860 |
| Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re-adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile. | — | — | — | — | |
| 18 | For day time block working | TRM | 35437.00 | 19.88 | 7,04,487.56 |
| 19 | Carrying out ancillary works required for UTV working under line block i.e., turning of rails/ Sleepers and keeping in position for fixing of UTV clamps to rail, keeping rails/PSC Sleepers in position while loading into BFR, removal of clamps on BFR for releasing loaded rail/Sleepers, adjusting of rails/Sleepers on BFR etc. by providing minimum of three men in a shift of 8 hours, with all contractor's tools, all lead, lift, crossing of tracks etc., complete and as directed by the engineer - in - charge. Note: In case, contractor provides less no. of Labour, payment will be deducted for each such person @ 2/3 rd of the accepted item rate. | Shift | 500.00 | 2,398.92 | 11,99,460 |
| Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) | — | — | — | — | |
| 20 | 60 Kg - 110/90 UTS - Outside Track | Each | 115.00 | 261.75 | 30,101.25 |
| 21 | 60 Kg - 110/90 UTS - On Running Line | Each | 350.00 | 331.17 | 1,15,909.5 |
| Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. | — | — | — | — | |
| 22 | Outside Track | Each | 200.00 | 53.95 | 10,790 |
| 23 | On Running Line | Each | 500.00 | 71.32 | 35,660 |
| Loading of rails of any section and length up to 1 3 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres. | — | — | — | — | |
| 24 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck/trailer. | MT | 275.00 | 136.44 | 37,521 |
| Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period. | — | — | — | — | |
| 25 | For lead up to 500 metre. | MT | 200.00 | 403.67 | 80,734 |
| 26 | For lead beyond 500 metre and up to 1 Km. | MT | 100.00 | 520.17 | 52,017 |
| Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner. | — | — | — | — | |
| 27 | From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer. | MT | 275.00 | 100.82 | 27,725.5 |
| Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 28 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck / trailer | MT | 1500.00 | 106.6 | 1,59,900 |
| Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres. | — | — | — | — | |
| 29 | For lead up to 500 metres | MT | 3150.00 | 314.3 | 9,90,045 |
| Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. | — | — | — | — | |
| 30 | Lead up to 5 Km | MT | 10.00 | 175.92 | 1,759.2 |
| 31 | Lead beyond 5 Km and up to 10 km | MT | 10.00 | 218.17 | 2,181.7 |
| 32 | Lead beyond 10 Km and up to 20 km | MT | 10.00 | 275.73 | 2,757.3 |
| 33 | Lead beyond 20 Km and up to 30 km | MT | 20.00 | 345.9 | 6,918 |
| 34 | Lead beyond 30 Km and up to 50 km | MT | 28.00 | 443.4 | 12,415.2 |
| 35 | Lead beyond 50 Km and up to 100 Km | MT | 66.00 | 655.86 | 43,286.76 |
| 36 | Lead beyond 100 Km and up to 150 Km | MT | 160.00 | 973.94 | 1,55,830.4 |
| 37 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 66281.00 | 3.25 | 2,15,413.25 |
| Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. | — | — | — | — | |
| 38 | Lead up to 5 Km | MT | 150.00 | 53.94 | 8,091 |
| 39 | Lead beyond 5 Km and up to 10 km | MT | 200.00 | 96.2 | 19,240 |
| 40 | Lead beyond 10 Km and up to 20 km | MT | 350.00 | 153.76 | 53,816 |
| 41 | Lead beyond 20 Km and up to 30 km | MT | 550.00 | 223.92 | 1,23,156 |
| 42 | Lead beyond 30 Km and up to 50 km | MT | 700.00 | 321.42 | 2,24,994 |
| 43 | Lead beyond 50 Km and up to 100 Km | MT | 900.00 | 533.89 | 4,80,501 |
| 44 | Lead beyond 100 Km and up to 150 Km | MT | 8000.00 | 851.96 | 68,15,680 |
| 45 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 2833780.00 | 3.25 | 92,09,785 |
| Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 46 | From DMT - During period of traffic block | MT | 5918.00 | 174.86 | 10,34,821.48 |
| 47 | From DMT - Not involving traffic block or on lines, not opened to traffic | MT | 11118.00 | 124.21 | 13,80,966.78 |
| 48 | From Truck / Trailer | MT | 18909.00 | 98.23 | 18,57,431.07 |
| Fixing of wooden blocks of approximate size of 150mm x 300mm x 1200mm on end of check rails including sizing at level crossings with contractor's labour, tools & plants and as directed. | — | — | — | — | |
| 49 | With Contractor's hard wood block | Each | 60.00 | 3,588.15 | 2,15,289 |
| 50 | Clearing waterway of major & minor bridges by removing weeds / shrubs / bushes, removing silt deposit, filling scours, if any up to 10 metre from centre of bridge on either side including disposing waste and silt away from waterway. Note: Rate is for a single line and per metre of bridge span. | Metre | 4700.00 | 224.71 | 10,56,137 |
| Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In- charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. | — | — | — | — | |
| 51 | Caution Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 40.00 | 7,994.87 | 3,19,794.8 |
| 52 | Speed Indicator Board of equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 96.00 | 6,778.28 | 6,50,714.88 |
| 53 | Stop Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 26.00 | 7,994.87 | 2,07,866.62 |
| 54 | Termination Indicator Board of Circular shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long | Each | 60.00 | 10,062.35 | 6,03,741 |
| 55 | Providing and fixing Trolley Refuge of size 3.0m x3.0m on cess, placing with released unserviceable PSC sleepers and keeping them at all four sides of refuge and also placing as matting inside the refuge by keeping them in upside down position with a minimum of 14 sleepers including levelling with earth, excavation, all lead and lift, crossing of tracks, leading the sleepers with in a free lead and lift, handling etc., with all contractor's men material complete and as directed by the Engineer-in-charge. Note: Earth-work will to be paid separately under relevant item. | Each | 70.00 | 4,292.55 | 3,00,478.5 |
| Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | — | — | — | — | |
| 56 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 800.00 | 830.66 | 6,64,528 |
| 57 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 850.00 | 1,123.37 | 9,54,864.5 |
| 58 | Tractor with Trolley for local transportation or other misc. works. | Hour | 490.00 | 291.34 | 1,42,756.6 |
| 59 | Arranging labour as and when required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. | Day | 1500.00 | 735.87 | 11,03,805 |
| Schedule total | ₹4,88,03,114.83 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SpecialconditionforPQRSworkAnnexure-A.pdf
ATTACHMENT
TENDERDOCUMENTFROM164-2026iNCLUDEDbgFORMAT.pdf
ATTACHMENT
ANNEXURE-PCECIRCULAR2016-17-ilovepdf-compressed1-compressed.pdf
ATTACHMENT
Vigilanceguidelines-PublicProcurement.pdf
ATTACHMENT
Acceptanceofe-BankGuaranteee-BGinWorksContractsandPGMS_PMS_PSSAGC2026_06_16.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf
ATTACHMENT
TantativelocationofTSRP-59.325kmsPQRSNAD-KOTASection.pdf
ATTACHMENT
ANNEXURES-FORMATSTOBESUBMITTEDASPERAPPLICABILITY.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .