Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.5 LAccepted-AOC XIV 718 CLINT ROAD VADAVUCODE PUTHENCRUZ AMBALAMEDU PO AMBALAMEDU ERNAKULAM KERALA 682303 | ERNAKULAM | KERALA | 682303 | 1 | Accepted-AOC 1 | |
| 2 | 2₹12.3 L+₹1.8 L (17.2%)Rejected-AOC KAYYUR ROAD JUNCTION CHERUVATHUR PO KASARAGOD DIST | CHERUVATHUR | KASARAGOD | KERALA | 671313 | 2 | Rejected-AOC 2 | |
| 3 | 3₹12.7 L+₹2.2 L (20.8%)Rejected-AOC | 3 | Rejected-AOC 3 | |
| 4 | 4₹13.6 L+₹3.2 L (30.1%)Rejected-AOC | 4 | Rejected-AOC 4 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
3 Mar 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Varghese P O
Senior Manager (Projects and Planning), FACT (Cochin Division), Ambalamedu Ernakulam
Cement Guniting of damaged structures at various locations of FACT (Cochin Division) at Ambalamedu,Kochi.
2022_FACT_673893_1
04031/2021-2022/E24908 dtd 12.02.2022
Limited
Civil Works
Item Rate
90 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDC107A)
3 documents required · 3 mandatory
₹0
₹12,000
Yes
18 Mar 2022
16 Feb 2022
4 Mar 2022
16 Feb 2022
3 Mar 2022
16 Feb 2022
180 days
Cement Guniting of damaged Plant structures at various locations of FACT (Cochin Division), Ambalamedu
Chipping and removing portions of existing RCC work carefully without damaging the remaining structure and removing the debris at places pointed out within a distance of 150M and reclaiming the steel reinforcement and stacking the same at places as per instructions
Cleaning the exposed surfaces of reinforcement bars embedded in the concrete at different heights with wire brush and applying two coats of epoxy zinc rich primer equivalent to Nito Zinc primer as per instruction ( Payment will be made only for the treated surface area of reinforcement bars.)
Guniting the RCC/masonry structures after chipping the existing surfaces, removing the scales in the rusted rods , cleaning the surface with air and water under pressure, providing one layer 50 x 50 x 3 mm (or nearest) weld mesh fabric as reinforcement and guniting with cement mortar 1:3 (one part of cement and 3 parts of aggregate - aggregate can be 50:50 M sand conforming to IS 383 and 6mm downgrade hard granite broken stone) including providing scaffolding with all necessary materials, levelling the surfaces ,finishing, curing and all other incidental charges etc. complete. The waste materials should be collected and disposed at places pointed out daily. The cost is inclusive of all materials like aggregates, weld mesh, hire for compressor gun, fuel/diesel, labour, scaffolding, curing etc. but excluding cost of cement (cement alone will be issued free of cost by the company at our stores.) Utmost care should be taken for controlling the consumption of cement. Recovery at double the issue rate will be effected on the cement consumed excess of the approved requirement - For an approximate thickness of 25 mm
Guniting the RCC/masonry structures after chipping the existing surfaces, removing the scales in the rusted rods , cleaning the surface with air and water under pressure, providing one layer 50 x 50 x 3 mm (or nearest) weld mesh fabric as reinforcement and guniting with cement mortar 1:3 (one part of cement and 3 parts of aggregate - aggregate can be 50:50 M sand conforming to IS 383 and 6 mm downgrade hard granite broken stone) including providing scaffolding with all necessary materials, levelling the surfaces ,finishing, curing and all other incidental charges etc. complete. The waste materials should be collected and disposed at places pointed out daily. The cost is inclusive of all materials like aggregates, weld mesh, hire for compressor gun, fuel/diesel, labour, scaffolding, curing etc. but excluding cost of cement (cement alone will be issued free of cost by the company at our stores.) Utmost care should be taken for controlling the consumption of cement. Recovery at double the issue rate will be effected on the cement consumed excess of the approved requirement - For an approximate thickness of 50 mm
Guniting the existing concrete/masonry surfaces after chipping, removing the scales in the rusted rods , cleaning the surface by air and water under pressure with cement mortar 1:3 (one part of cement and 3 parts of M sand of plastering quality conforming to IS 383 ) including levelling the top surfaces finishing, curing and all other incidental charges etc. complete including providing scaffolding with all necessary materials, . The waste materials should be collected and disposed at places pointed out daily. The cost is inclusive of all materials like sand, hire for compressor gun, fuel/diesel, labour, scaffolding, curing etc. but excluding cost of cement (cement alone will be issued free of cost by the company at our stores. allmost care should be taken for controlling the consumption of cement. Recovery at double the issue rate will be effected on the cement consumed excess of the approved requirement - For an approximate thickness of 15 mm
Providing anti corrossive coating to the gunited surfaces at all heights consisting of two coat of high build epoxy paint of approved quality and colour after cleaning the surface thoroughly by removing-all loose particles ,dust etc including cost of all materials, labour charges scaffolding charges ,removal of waste materials etc. Each coat should have distinctive colour shades to ensure that the entair surface is covered under each coat .Allow sufficient drying period in between coats as recommended by the manufacterer.
Supplying, fabricating, and fixing reinforcement to RCC works at all levels with High strength deformed bars Fe 500 grade conforming to IS 1786 including all charges for uncoiling and straightening rods, cutting rods, bending cold, placing in position and tying with black annealed steel wire of 16 SWG , etc. complete.INCLUDING COST OF STEEL (The reinforcement steel shall be of M/s. RINL/SAIL/TISCO)
MINI ENTERPRISES
K A JOHN
M S AJAYAKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_709164.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .