Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC MADEENA MANZIL SIVAPURAM KANNUR 670702 | KANNUR | KANNUR | KERALA | 670702 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹12.6 L+₹71,576 (6.00%)Rejected-Finance NANDANAM PO EACHUR VANIANCHAL KANNUR | KANNUR | KANNUR | KERALA | L2 | Rejected-Finance L2 bidder |
Tender Value
₹11.9 L
EMD Value
₹30,000
Closing Date
21 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Ground Development works at GHSS Malur, Mattannur LAC, Kannur-Retender
2023_SKF_632224_2
126/SKF/CE/2023-24
Open Tender
Civil Works - Others
Item Rate
120 days
KANNUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹30,000
24 Jul 2024
13 Feb 2024
23 Feb 2024
13 Feb 2024
21 Feb 2024
13 Feb 2024
Amount
Mud Football Court (CPWD)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od260091/2023_2024 : Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 30 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth including all lifts and leads, hire charges of machineries, labour charges etc complete as per the direction of engineer in charge. All kinds of soil. ((Based on CPWD-2.6.1, 16.1,30.2.8 & MoRTH-3.6 & 3.16)
od237467/2023_2024 : SKF_OD 6/2022-2023 Sieving excavated Earth through sieve of I.S. designation 4.75 mm and collecting good quality earth for measurement including stacking.
od237468/2023_2024 : SKF - OD 2/2022-2023 Supplying and stacking for measurement sieved jamuna sand at site including cost of sand and carriage upto 5 k.m. lead,all labour charges for stacking,loading and unloading etc complete.(Based on CPWD 30.2.2 & 30.2.4.3) details of cost for 1 cum
od237469/2023_2024 : SKF - OD 3/2022-2023 Mixing earth and jamuna sand in the required proportion specified or directed by the officer - in- charge including all cost of labour charges, hire charges of machineries etc. complete.(Based on CPWD 30.2.9) details of cost for 10 cum
od237470/2023_2024 : SKF - OD 4/2022-2023 Spreading of earth and jamuna sand in the required thickness as per direction of officer - in- charge including all cost of labour charges, hire charges of machineries etc. complete.(cost of earth and jamuna sand to be paid separately). (Based on CPWD 30.2.8) Details of cost for 1 cum
od237471/2023_2024 : SKF - OD 5/2022-2023 Consolidation of subgrade with power road roller of 8 to 12 tonne capacity with road roller including making good the undulations etc.including all cost of labour charges, hire charges of machineries,fuel,oil etc. complete.(Based on CPWD 16.1)<br>details of cost for 100sqm
od258655/2023_2024 : Supply and Installation of Fixed type 7's Football Goal Post (3.65m x 1.80m x 1.20m) made of pipe 10cm dia G.I. pipe with nylon net as per the direction of Engineer in Charge.
Drain, Step Gallery & Gate (CPWD)
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
50.6.7.1 : Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
50.6.7.2 : Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.7.2 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
od237542/2023_2024 : Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.19 : Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
SREEJESH R
Bidder Name
SREEJESH R
Muhammed Shameer
techsummary_1017611.pdf
PDF • 0.51 MB
finsummary_1017611.pdf
PDF • 0.51 MB
LOAMalur.pdf
PDF • 0.51 MB
finance_1017611.pdf
PDF • 0.57 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .