Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹11.0 L
EMD Value
₹27,500
Closing Date
18 Dec 2025, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PMU Sreekandapuram
Office of The Executive Engineer ,KSEBL, PMU Sreekandapuram
CONVERSION 4.4 KM 11KV OH TO ABC AT KO RAMBAKALL-POTHAMKANDAM-NEELIRINGA, KOTRADI-VALLIPILAV.
2025_KSEB_821448_1
TENDER/2025-26/6159/61 dt. 02-12-2025
Open Tender
Electrical Works
Percentage
90 days
Padiyottuchal
Refer tender document
6 documents required · 6 mandatory
₹5,900
₹27,500
4 Dec 2025
4 Dec 2025
20 Dec 2025
4 Dec 2025
18 Dec 2025
4 Dec 2025
4 Dec 2025 - 17 Dec 2025
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
Renewal of existing damaged/old 11kV Strut with new PSC strut in place incl. excavation & backfilling pit and conveyance (except pole).
Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal of PSC pole (used for fly stay) and refitting of all items and conveyance (except conveyance of pole).
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Erecting 9M PSC Pole as Support pole for ABC Stringing work
Erecting A Type Pole as Support pole for ABC Stringing work
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
Fitting and providing one Strut using A type pole incl. digging & back filling pit.
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.
Fitting and providing one HT Fly stay for 11kV pole using A type pole incl. digging & back filling pits.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
Additional rate for excavation of Pit for A type pole in Hard Laterite.
Additional rate for excavation of Pit for A type pole in Soft Rock.
Additional rate for excavation of Pit for A type pole in Rock.
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
Additional rate for excavation of one Pit for Coil Earthing in Hard Laterite.
Additional rate for excavation of one Pit for Coil Earthing in Soft Rock.
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.
Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable
Doing straight joint on cables of sizes upto and incl. 3x185 sqmm using the cable jointing kit supplied departmentally as per specification.
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm
Erection of suspension clamp for 11KV ABC of any size
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BidDocument.pdf
Tender Documents • 1.64 MB
BOQ_1377056.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .