| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 Cr+₹15.0 L (5.68%)Admitted-Finance | ₹2.8 Cr+₹15.0 L (5.68%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 Cr+₹51.6 L (19.5%)Admitted-Finance | ₹3.2 Cr+₹51.6 L (19.5%) | L3 | Admitted-Finance |
| 4 | L4₹3.7 Cr+₹1.1 Cr (40.0%)Admitted-Finance G 15 SHAHEEN BAGH KALINDI KUNJ ROAD NEW FRIENDS COLONY SOUTH DELHI DELHI 110025 INDIA | SOUTH EAST DELHI | DELHI | 110025 | ₹3.7 Cr+₹1.1 Cr (40.0%) | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
2 Mar 2020, 4:00 pmClosed
DGM CnM
Barh Thermal Power Plant P.O. BARH BARH 803213
OVERHAULING OF 1x210 MW AND 1x500 MW BOILER AT NTPC KAHALGAON
2020_NTPC_31266_1
NTPC/SSC - ER-I(Barh)/9900195564
Limited
Serv - Others
Service
548 days
NTPC KAHALGAON
3 documents required · 3 mandatory
₹0
₹5 L
Yes
4 Mar 2020
20 Feb 2020
3 Mar 2020
20 Feb 2020
2 Mar 2020
20 Feb 2020
20 Feb 2020 - 27 Feb 2020
Amount
OH OF 1*210 MW
Blr PP Weld JTS (<>) OH
BOILER (FINS) WELDING
BOILER (SEGMNT SHIELD) Instal/Remove
TANK (<>) OH
Penthouse/DeadChamber(<>)-Cleaning
Reheater (CONTRL STAGE) LIFTING
Reheater (CONTRL STAGE) INSPECTION
Reheater (CONTRL STAGE) Repl
Eco (COILS) Instal/Remove
Eco (BAFFLE TRAY) Repl
PF Burner (<>) Instal/Remove
SCAFFOLDING (<=250MW) Erection
Reheater (>210MW#)-OH
Tubular APH(<>)-OH
SCAPH (<>) Repl
Tubular APH (<>) Repair
Tubular APH (<>) Repl
Duct (<>) Attend Defect
Sup.Heater (COIL) ALIGNING
Eco (COILS) INSPECTION
Economiser (<=210MW#) Decpl/Cpl/Algn
DEPTT <> MAN.DEP-HSW
SCAFFOLDING (<>) Instal/Remove
PF Burner (BURNERBLOCK PLATE) Instal/Rem
BOILER (BUCKSTAY) OH
BOILER (TUBE BENDS) Fabrication
Expansion Joints (<>) OH
BOILER (PEEP/MANHOLE) Serv
BOILER (PASS-1) HPW Jet Cleaning
Tubular APH (<>) Cleaning
Eco (COILS) Remove & Apply
HANGER (<>) Checking
SCAFFOLDING (<>) Remove & Apply
Misc Works (<>) OH
DEPTT <> MAN.DEP-SUP
MATL (SCRAP) Hndlg&Stacking
OH OF 1*500 MW
BOILER (<>) HPW Jet Cleaning
SCAFFOLDING (>=500MW) Erection
SCAFFOLDING (<>) Instal/Remove
Blr PP Weld JTS (<>) OH
Blr PP Weld JTS (OD:51-90MM) WELDING
BOILER (FINS) WELDING
BOILER (TUBE BENDS) Fabrication
BOILER (SEGMNT SHIELD) Instal/Remove
BA Hopper (SEAL TROUGH) OH
BOTT RING HDR (ORIFICES) Instal/Remove
Penthouse/DeadChamber(<>)-Cleaning
Boiler Drum (<>)-Insp
Sup.Heater (COIL) ALIGNING
BOILER (<>) WELDING
BOILER (PASS-2) WATER WASHING
TANK (<>) Serv
PF Burner (INLET ELBOW) Repl
Burner Tilt (<>) Attend Defect
PF Burner (<>) Instal/Remove
PF Burner (<>) Repl
SADC Dampers (<>) INSPECTION
SADC Dampers(<>)-Serv
PF Burner (<>) Repair
DEPTT <> MAN.DEP-HSW
LTSH (COIL) LIFTING
BOILER (BUCKSTAY) OH
SCAPH (<>) Cleaning
Eco (COILS) INSPECTION
LTSH (<=210MW#) INSPECTION
HANGER (<>) Checking
Misc Works (<>) WELDING
SCAFFOLDING (<>) Remove & Apply
Misc Works (<>) OH
DEPTT <> MAN.DEP-SUP
MATL (SCRAP) Hndlg&Stacking
Tiranga Construction
M/S MAGADH ENGINEERING WORKS
UNITED HITECH PVT.LTD.
Tiranga Construction
M/S MAGADH ENGINEERING WORKS
UNITED HITECH PVT.LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .