Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹5.3 L+₹31,598.77 (6.30%)Accepted-AOC | L2 | Accepted-AOC Second bidder |
| Sl No | Description | Qty | Unit | C J JOY L2 | SHAMSUDHEEN .T.U L1 |
|---|---|---|---|---|---|
| 1.00jungle clearing and desiltation | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 18,420 | sqm | 7 ₹1,28,940 | 6.86 ₹1,26,361.2 Lowest |
| 1.00 | OD8042/2025-2026:Earth work in excavation by mechanical means using Hydraulic excavator over areas including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 48 | hour | 1,000 ₹48,000 Lowest | 1,086.36 ₹52,145.28 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 256.2 | cum | 190 ₹48,678 Lowest | 190.36 ₹48,770.23 |
| 1.00 | OD9978/2025-2026:Supplying mobile oil for lubrication of mechanical arrangements in the canal system during water distribution period | 2.5 | Litre | 500 ₹1,250 | 394.81 ₹987.03 Lowest |
| 1.00 | OD8041/2025-2026:Engaging man mazdoor for carrying out various works | 212 | no | 900 ₹1,90,800 | 800.81 ₹1,69,771.72 Lowest |
| 1.01 | OD14152/2025-2026:Supplying and laying earth filled cement bags to lines and levels including cost of cement bags charges for filling tying lying in position all leads and lifts and incidental charges etc. complete as per the direction of departmental officers at site | 50 | each | 45 ₹2,250 | 39.48 ₹1,974 Lowest |
| 2.00Encasing work | |||||
| 2.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 1.62 | cum | 1,200 ₹1,944 | 1,150.27 ₹1,863.44 Lowest |
| 2.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.18 | cum | 7,900 ₹72,529.9 | 6,834.62 ₹62,748.65 Lowest |
Tender Value
₹6.8 L
EMD Value
₹16,939
Closing Date
12 Aug 2025, 11:00 amClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, KPIP Sub Division II Kalladikode
KPIP AM 2025 26 Distributary Canal cleaning works for Valikode Ummanazhy and Pulapatta distributaries Water distribution works for ensuring smooth water distribution through all the distributaries off taking form LBMC between Ch 10 940 km and 23 000
2025_Irrig_782596_1
IRR/PI/TR/3342/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
365 days
Kalladikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,495
Yes
₹16,939
Yes
13 Oct 2025
5 Aug 2025
14 Aug 2025
5 Aug 2025
12 Aug 2025
5 Aug 2025
Amount
jungle clearing and desiltation
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
OD8042/2025-2026:Earth work in excavation by mechanical means using Hydraulic excavator over areas including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD9978/2025-2026:Supplying mobile oil for lubrication of mechanical arrangements in the canal system during water distribution period
OD8041/2025-2026:Engaging man mazdoor for carrying out various works
OD14152/2025-2026:Supplying and laying earth filled cement bags to lines and levels including cost of cement bags charges for filling tying lying in position all leads and lifts and incidental charges etc. complete as per the direction of departmental officers at site
Encasing work
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
C J JOY (BID ID -2281091)
Bidder Name
C J JOY
SHAMSUDHEEN .T.U
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1284150.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .