Tender Value
₹6.3 Cr
EMD Value
₹6.3 L
Closing Date
6 Aug 2025, 11:00 amClosed
Operation and Maintenance of Civil Installations, Electrical Installations, Fire Fighting System, DG Set, Lifts, AC System, STP, ETP, WTP, Water Pumps and Solar Power Generation System, Stack Parking and Building Management System at Aayakar Bhavan, Kochi
NSL/CEO/AB/NIT/2025/762
NSL/CEO/AB/NIT/2025/762
Open Tender-Domestic
Miscellaneous
Ernakulam, Kerala
₹11,800
₹6.3 L
7 Oct 2025
22 Jul 2025
6 Aug 2025
6 Aug 2025
28 Aug 2025
Name of Work: Operation and Maintenance works of Aayakar Bhavan, Kacheripady, Kochi, Kerala-682018
BILL OF QUANTITIES
S.No. DSR/NDSR Description of item/work Unit Qty. Rate in Rs. Amount in Rs.
1 Civil Maintenance work
Maintenance Service charges of works as per the below mentioned procedures as per the directions of Engineer In charge.
Periodical Maintenance of drainage network manually or using Pressure jetting machines twice in a year or more, if required, i/c desiliting of, gratings, chocked
sewer line, water closet including all the vertical stacks of Sanitary twice in a year or more, if required, to the entire satisfaction of Engineer - in -Charge.
b) Maintenance and cleaning of balcony and washroom and waterproofing works in the building etc.
Maintenance and operation of water supply grid and valves to keep the water supply system efficient and operational at all times to the entire satisfaction and as
per direction of the Engineer - in - Charge.
Maintenance and repairing of Stone cladding including joint filling, crack repairing and replacement of stone, Sculptures,damaged doors, windows, ventilators of
steel, aluminium, wood , PVC, Gypsuma and wooden False ceiling, trap doors i/c repair/ replacement of necessary fittings & fixtures of approved make (or orginal
make as per instruction of EIC) and quality, wherever required to keep them in proper functional conditions to the entire satisfaction of the Engineer - in - charge
Maintenance and repair of plumbing system in all toilets and kitchen including stopping leakages or over flow of water ,cisterns and replacement of damaged fittings
i/c CP Brass fitting, ball cocks and G.I., PVC fittings sensor device, hand drier, soap dispenser, Mirror etc. to keep the entire water supply system efficient and
functional to the entire satisfaction of Engineer - in - charge . contractor shall replace all fittings which have lost its esthetic view, colour, polish as per orginal
installment with approved or original make as per instruction of EIC.
Maintenance and repair of internal & external plaster, repair and repaint of all area paints ( ,external paint, textured paint, structural steel paint,) flooring,
pavements, pavor block masonry & RCC works, pointing on roof tiles , patch plaster and full plaster,CC gola i/c fixing of W.C. seat, gully trap, W.C trap, floor traps
and sealing of leakages from gully trap, W.C trap, floor trap, drainage and vertical stacks, expansion joints etc. and restoration of existing finishing in the affected
areas to match with adjacent finishes and to the entire satisfaction of Engineer -in - charge.
Welding by electric plant/Machine including transportation of electric welding plant at site to weld broken grills, hinges, doors, windows, gates, railing and any other
steel work etc.complete as per direction of Engineer -in - charge .
Investigating causes of seepage / dampness/ leakage from wall, floors, pipes expansion joints of all kinds etc., dismantling existing affected portion, arranging
h) required materials, labours, T&P, lift/ ladder or jhulla(if required) /stagging including taking all necessary measures, rectification complete in all respect in time
bound manner to the entire satisfaction of Engineer-in-charge.
i) Closing holes in walls, ceilings, floors or any wherelse including repairing with cement mortar to prevent entry of rats & others animals.
Recording & maintenance of the complaints register received at service centres in person or through telephone or email or any other mode or online complaint
monitoring system and assigning the complaint to the workers of respective trade.
Preparing the abstract of attended / unattended complaints on daily, weekly and monthly basis and submitting the same with reasons of unattended complaints and
action plan for redressal of pending complaint to the Engineer - in - charge of NSL or his authorized representative.
Weekly preventive maintenance shall be essentially carried out by deploying full team on Saturday and Sundays to check each & every civil , electrical, fire fighting,
fire alarm , items etc and maintained the record .
Any other works in connection with the smooth operation & maintenance work not mentioned above ,but required to be carried out within the cost and/or also
as per direction of the Engineer -in - charge .
n) All kinds of blinds (manual or motorised ) shall be repaired, maintained as per director of EIC
o) Wall painting with plastic emulsion paint or existing paint of approved brand and manufacture to give an even shade:One or more coats on old work.
p) Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: One or more coats on old work.
Repairs to plaster of any thickness under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls
complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
r) One person will act as supervisor for carrying out O & M activities for above works & must have the knowledge of computer.
Total Amount for Civil Works (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 1,32,078.00 9,24,546.00
Total Amount for Civil Works (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 1,32,078.00 9,24,546.00
Total Amount for Civil Works (In Rs.) From 15-March-26 to 14-March-27 per month 12.00 1,41,323.00 16,95,876.00
Total Amount for Civil Works (In Rs.) From 15-March-26 to 14-March-27 per month 12.00 1,41,323.00 16,95,876.00
Total Amount for Civil Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 1,51,216.00 18,14,592.00
Total Amount for Civil Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 1,51,216.00 18,14,592.00
Total Amount for Civil Maintenance work (In Rs.) 44,35,014.00
Total Amount for Civil Maintenance work (In Rs.) 44,35,014.00
2 Electrical and Mechanical Maintenance work
NDSR-2 Maintenance & repair of works as per the below mentioned procedures as per the directions of Engineer In charge.
Digitally signed by AMIT
BILL OF QUANTITIES
S.No. DSR/NDSR Description of item/work Unit Qty. Rate in Rs. Amount in Rs.
All inclusive comprehensive maintenance , upkeep of all electrical internal installations, Lights, Fans, Geysers etc. as per details below for all days in a Smonth i/c
a) holidays complete with materials , consumables, bulb, tubes, LED lights (Except specialized lights/other special itemss) etc as per terms and conditions attached and
as per direction of Engineer -in-Charge.
• Light points/ Fan pts/ Ex-fan pts./ Call bell pts. • 5 amp plug points • 15 amp power plug points • Telephone outlet, TV Outlet • Telephone wire, TV Wire • Ceiling
b) fans • Ex-fans • Call bells • SP, SPN, TP & TPN MCB DB’s with MCB’s • Bus Bars, Bus duct • Cable trays of different size • 63 / 100 amps TP & N Switch units • 125
Amp. TP MCCB’s • And others as desired by Engineer-in-charge.
One person will act as supervisor for carrying out O & M activities for above works & must have the knowledge of working with electricity.
Total Amount for (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 68,039.00 4,76,273.00
Total Amount for (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 68,039.00 4,76,273.00
Total Amount for Electrical Works (In Rs.) From From 15-March-26 to 14-March-27 per month 12.00 72,802.00 8,73,624.00
Total Amount for Electrical Works (In Rs.) From From 15-March-26 to 14-March-27 per month 12.00 72,802.00 8,73,624.00
Total Amount for Electrical Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 77,898.00 9,34,776.00
Total Amount for Electrical Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 77,898.00 9,34,776.00
Total Amount for Electrical Maintenance work (In Rs.) 22,84,673.00
Total Amount for Electrical Maintenance work (In Rs.) 22,84,673.00
3 Housekeeping Works
NDSR-3 Maintenance & repair of works as per the below mentioned procedures as per the directions of Engineer In charge.
AMC of housekeeping, general up keep and cleaning of common areas (in all days including Saturday, sundays and holidays Unskilled) including toilets, Offices,
Cabins, Halls washrooms, cafeteria, Corridor, Balcony, Staircases, Roofs, Basement at the premises to be carried out during normal working hours including providing
a) all cleaning materials required like soap, detergents, phenyle, chemical, dusters, dhoties, jharus, wipers, toilet cleaners, glass cleaning chemicals, R-2, R-6, cockroach
killing sprays, room fresheners etc and other cleaning materials, machinery & equipments required for housekeeping, Pest and rodent control services, fogging and
Sanitization services as per the direction of Engineer-Incharge of all area as per specifications and scope of work in the tender document.
Total Amount for (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 4,36,905.00 30,58,335.00
Total Amount for (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 4,36,905.00 30,58,335.00
Total Amount for Housekeeping Works (In Rs.) From From 15-March-26 to 14-March-27 per month 12.00 4,67,488.00 56,09,856.00
Total Amount for Housekeeping Works (In Rs.) From From 15-March-26 to 14-March-27 per month 12.00 4,67,488.00 56,09,856.00
Total Amount for Housekeeping Works (In Rs.) From 15-March-27 to 14-March-28
Total Amount for Housekeeping Works (In Rs.) From 15-March-27 to 14-March-28
Total Amount for House keeping Maintenance work (In Rs.) 1,46,70,735.00
Total Amount for House keeping Maintenance work (In Rs.) 1,46,70,735.00
4 Horticulture Works
NDSR-4 Maintenance & repair of works as per the below mentioned procedures as per the directions of Engineer In charge.
Complete maintenance of the entire garden features of the garden area, indoor plants, potted plants, planted beds in general shift i/c lawn, tress, shrubs, hedge,
potted plants, flower beds, creepers etc. and other garden features including watering, hoeing, making of plants basin, manuring, trimming and cleaning of hedges/
plants beds, spraying of insecticides,DAP, fungicides, weeding, mowing and top dressing of lawn with good earth and Sludge Manure/Cow dung Manure For
a) premises/office accomodation (cum.) and hedge clipping and removal of the garden waste as per direction and satisfaction of the officer-in-charge (including the
cost of manure and good earth) to maintain the plants, hedge and lawns in good and healthy conditions at all the time during the maintenance period as mentioned
in general terms & conditions.The wastes to be dumped at authorised dumping ground outside the campus including transportation of garbage to the nearest
municipal dumping dhalao/yard/ treatment plant complete to keep the entire premises neat and clean.
Total Amount for (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 32,967.00 2,30,769.00
Total Amount for (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 32,967.00 2,30,769.00
Total Amount for Horticulture Works (In Rs.) From From 15-March-26 to 14-March-27 per month 12.00 35,275.00 4,23,300.00
Total Amount for Horticulture Works (In Rs.) From From 15-March-26 to 14-March-27 per month 12.00 35,275.00 4,23,300.00
Total Amount for Horticulture Works (In Rs.) From 15-March-27 to 14-March-28
Total Amount for Horticulture Works (In Rs.) From 15-March-27 to 14-March-28
Total Amount for Horticulture Maintenance work (In Rs.) 11,06,997.00
Total Amount for Horticulture Maintenance work (In Rs.) 11,06,997.00
5 Operation of Specialised E&M Equipments
a) NDSR-5 Fire Fighting System
Running, operation and preventive Maintenance of water supply pumps, drainage pumps, fire fighting Pumps & other associtaed system as per specifications,
scope, terms & conditions defined in the tender documents including all the consumables required for day to day maintenance.
Total Amount for (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 2,09,994.00 14,69,958.00
Total Amount for (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 2,09,994.00 14,69,958.00
Total Amount for Firefighting Works (In Rs.) From 15-March-26 to 14-March-27 per month 12.00 2,24,694.00 26,96,328.00
Total Amount for Firefighting Works (In Rs.) From 15-March-26 to 14-March-27 per month 12.00 2,24,694.00 26,96,328.00
Total Amount for Firefighting Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 2,40,423.00 28,85,076.00
Total Amount for Firefighting Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 2,40,423.00 28,85,076.00
b) NDSR-6 Specialized Electrical Installation
Round the clock Running operations and maintenance (Routine & Preventive) of DG Sets complete with auto start panels and Substation i/c day to day cleaning &
keeping records etc. as per specifications, scope, terms & conditions defined in the tender documents including all the consumables required for day to day
Total Amount for Specialized Electrical Installation Works (In Rs.) 01-SEP-25 to 14-March-
Total Amount for Specialized Electrical Installation Works (In Rs.) 01-SEP-25 to 14-March-
Total Amount for Specialized Electrical Installation Works (In Rs.) From 15-March-26 to
Total Amount for Specialized Electrical Installation Works (In Rs.) From 15-March-26 to
Total Amount for Specialized Electrical Installation Works (In Rs.) From 15-March-27 to
Total Amount for Specialized Electrical Installation Works (In Rs.) From 15-March-27 to
Digitally signed by AMIT
BILL OF QUANTITIES
S.No. DSR/NDSR Description of item/work Unit Qty. Rate in Rs. Amount in Rs.
c) NDSR-7 Lift Operations
Providing services for running operations i/c cleaning and safety, security, watch & ward of all the lifts on all days of the year as per terms and conditions including
Polishing of lfts, replacement of Fan, LEDs and Batteries
Total Amount for Lift Operations Works (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 66,644.00 4,66,508.00
Total Amount for Lift Operations Works (In Rs.)15-Aug-25 to 14-March-26 per month 7.00 66,644.00 4,66,508.00
Total Amount for Lift Operations Works (In Rs.)From 15-March-26 to 14-March-27
Total Amount for Lift Operations Works (In Rs.)From 15-March-26 to 14-March-27
Total Amount for Lift Operations Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 76,301.00 9,15,612.00
Total Amount for Lift Operations Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 76,301.00 9,15,612.00
d) NDSR-8 HVAC Staff for Daily Maintenance of Ducting Grills Piping
Operation and maintenance services of HVAC system, Grills, Ducts, Diffusers etc on all the day including cleaning and safety of the system including all the
consumables required for day to day maintenance
Total Amount for HVAC Works (In Rs.) From 15-Aug-25 to 14-March-26 per month 7.00 33,972.00 2,37,804.00
Total Amount for HVAC Works (In Rs.) From 15-Aug-25 to 14-March-26 per month 7.00 33,972.00 2,37,804.00
Total Amount for HVAC Works (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 36,350.00 4,36,200.00
Total Amount for HVAC Works (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 36,350.00 4,36,200.00
Total Amount for HVAC Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 38,895.00 4,66,740.00
Total Amount for HVAC Works (In Rs.) From 15-March-27 to 14-March-28 per month 12.00 38,895.00 4,66,740.00
e) NDSR-9 Effluent Treatment Plant, Water Treatment Plant and Sewage Treatment Plant
Running, operation and preventive Maintenance services of Effluent Treatment Plant, water treatment plant and Sewage Treatment Plant as per specifications,
scope, terms & conditions defined in the tender documents including consumables.
Total Amount for ETP,STP,WTP Works (In Rs.) 15-Aug-25 to 14-March-26 per month 7.00 1,31,483.00 9,20,381.00
Total Amount for ETP,STP,WTP Works (In Rs.) 15-Aug-25 to 14-March-26 per month 7.00 1,31,483.00 9,20,381.00
Total Amount for ETP,STP,WTP Works (In Rs.) From 15-March-26 to 14-March-27 per month 12.00 1,40,687.00 16,88,244.00
Total Amount for ETP,STP,WTP Works (In Rs.) From 15-March-26 to 14-March-27 per month 12.00 1,40,687.00 16,88,244.00
Total Amount for ETP,STP,WTP Works (In Rs.) From 15-March-27 to 14-March-28
Total Amount for ETP,STP,WTP Works (In Rs.) From 15-March-27 to 14-March-28
f) NDSR-10 BMS Operation
Running, operation, preventive Maintenance services and troubleshooting the issues in BMS effectively and efficiently. Informing the suprvisor as soon as the issue
is indicated in the system with all details. Preparing daily and weekly reports of the system. Operating system as per specifications, scope, terms & conditions
defined in the tender documents.
Total Amount for (In Rs.)From15-Aug-25 to 14-March-26 per month 7.00 1,08,116.00 7,56,812.00
Total Amount for (In Rs.)From15-Aug-25 to 14-March-26 per month 7.00 1,08,116.00 7,56,812.00
Total Amount for BMS Operation Works (In Rs.)From 15-March-26 to 14-March-27
Total Amount for BMS Operation Works (In Rs.)From 15-March-26 to 14-March-27
Total Amount for BMS Operation Works (In Rs.) From 15-March-27 to 14-March-28
Total Amount for BMS Operation Works (In Rs.) From 15-March-27 to 14-March-28
g) NDSR-12 Solar Power System and Bio gas plant Operation
Running, operation and preventive maintenance services of Solar Power System installed in the premises as per the direction of client/Engineer-in-Charge
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 66,644.00 4,66,508.00
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 66,644.00 4,66,508.00
Total Amount for Solar & Bio Gas plant Works (In Rs.) From 15-March-26 to 14-March-27
Total Amount for Solar & Bio Gas plant Works (In Rs.) From 15-March-26 to 14-March-27
Total Amount for Solar & Bio Gas plant Works (In Rs.) From 15-March-27 to 14-March-28
Total Amount for Solar & Bio Gas plant Works (In Rs.) From 15-March-27 to 14-March-28
h) NDSR-13 Stack Parking Operation
Running, operation and preventive Maintenance services of stack parking at Ground Floor and in basement as per specifications, scope, terms & conditions defined
in the tender documents including consumables and providing manpower for parking of vehicles.
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 62,934.00 4,40,538.00
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 62,934.00 4,40,538.00
Total Amount for Stack Parking Operation Works (In Rs.) From 15-March-26 to 14-March-
Total Amount for Stack Parking Operation Works (In Rs.) From 15-March-26 to 14-March-
Total Amount for Stack Parking Operation Works (In Rs.) From 15-March-27 to 14-March-
Total Amount for Stack Parking Operation Works (In Rs.) From 15-March-27 to 14-March-
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 55,48,606.00
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 55,48,606.00
Total Amount for Operations (In Rs.)From 15-March-26 to 14-March-27 1,01,77,728.00
Total Amount for Operations (In Rs.)From 15-March-26 to 14-March-27 1,01,77,728.00
Total Amount for Operations (In Rs.) From 15-March-27 to 14-March-28 1,08,90,192.00
Total Amount for Operations (In Rs.) From 15-March-27 to 14-March-28 1,08,90,192.00
6 CAMC & AMC of Equipments
a) NDSR-14 AMC of HVAC System
Annual maintenance i/c providing services for operation as per terms and conditions & scope of work attached i/c VRF, VRF, AHU, Indoor Units, Outdoor Unit etc.
as per direction of Engineer-in -charge. (Maintenance shall be carried out through OEM)
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 77,550.30 5,42,852.10
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 77,550.30 5,42,852.10
Total Amount for AMC of HVAC System (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 82,979.00 9,95,748.00
Total Amount for AMC of HVAC System (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 82,979.00 9,95,748.00
Total Amount for AMC of HVAC System (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 88,788.00 10,65,456.00
Total Amount for AMC of HVAC System (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 88,788.00 10,65,456.00
b) NDSR-15 AMC of Lifts
Annual Maintenance service of 4 Nos. of Johnson lifts installed in the premises. AMC to be done thorugh OEM only and should be of top teir offered by them
Digitally signed by AMIT
BILL OF QUANTITIES
S.No. DSR/NDSR Description of item/work Unit Qty. Rate in Rs. Amount in Rs.
Total Amount for (In Rs.)From 01-SEP-25 to 14-March-26 per month 7.00 51,501.00 3,60,507.00
Total Amount for (In Rs.)From 01-SEP-25 to 14-March-26 per month 7.00 51,501.00 3,60,507.00
Total Amount for AMC of Lifts (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 55,106.00 6,61,272.00
Total Amount for AMC of Lifts (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 55,106.00 6,61,272.00
Total Amount for AMC of Lifts (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 58,963.00 7,07,556.00
Total Amount for AMC of Lifts (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 58,963.00 7,07,556.00
c) NDSR-16 AMC DG Sets
Providing AMC services as per terms and conditions, scope of work as per the standard procedure of OEM or as per direction of Engineer-in -charge. Including B
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 25,665.60 1,79,659.20
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 25,665.60 1,79,659.20
Total Amount for AMC of DG Set (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 27,462.00 3,29,544.00
Total Amount for AMC of DG Set (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 27,462.00 3,29,544.00
Total Amount for AMC of DG Set (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 29,384.00 3,52,608.00
Total Amount for AMC of DG Set (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 29,384.00 3,52,608.00
d) NDSR-17 CAMC of Water Treatment Plant (WTP)
Providing CAMC services as per terms and conditions, scope of work as per the standard procedure of OEM or as per direction of Engineer-in -charge.
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 13,351.20 93,458.40
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 13,351.20 93,458.40
Total Amount for CAMC of Water Treatment Plant (WTP) (In Rs.)From 15-March-26 to
Total Amount for CAMC of Water Treatment Plant (WTP) (In Rs.)From 15-March-26 to
Total Amount for CAMC of Water Treatment Plant (WTP) (In Rs.)From 15-March-27 to
Total Amount for CAMC of Water Treatment Plant (WTP) (In Rs.)From 15-March-27 to
e) NDSR-18 CAMC of Effluent Treatment Plant (ETP)
Providing CAMC services as per terms and conditions, scope of work as per the standard procedure of OEM or as per direction of Engineer-in -charge.
Total Amount for (In Rs.)From15-Aug-25 to 14-March-26 per month 7.00 14,976.00 1,04,832.00
Total Amount for (In Rs.)From15-Aug-25 to 14-March-26 per month 7.00 14,976.00 1,04,832.00
Total Amount for CAMC of Effluent Treatment Plant (ETP) (In Rs.)From 15-March-26 to
Total Amount for CAMC of Effluent Treatment Plant (ETP) (In Rs.)From 15-March-26 to
Total Amount for CAMC of Effluent Treatment Plant (ETP) (In Rs.)From 15-March-27 to
Total Amount for CAMC of Effluent Treatment Plant (ETP) (In Rs.)From 15-March-27 to
f) NDSR-19 CAMC of Sewage Treatment Plant (STP)
Providing CAMC services as per terms and conditions, scope of work as per the standard procedure of OEM or as per direction of Engineer-in -charge.
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 13,115.20 91,806.40
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 13,115.20 91,806.40
CAMC of Sewage Treatment Plant (STP (In Rs.)From From 15-March-26 to 14-March-27 per month 12.00 14,033.00 1,68,396.00
CAMC of Sewage Treatment Plant (STP) (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 15,015.00 1,80,180.00
g) NDSR-20 CAMC of Stack Parking system
Providing CAMC services thorugh OEM as per terms and conditions, scope of work and as per standard operating procedure of OEM or as per direction of Engineer-
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 20,789.49 1,45,526.45
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 20,789.49 1,45,526.45
Total Amount for CAMC of Stack Parking system (In Rs.)From 15-March-26 to 14-March-
Total Amount for CAMC of Stack Parking system (In Rs.)From 15-March-26 to 14-March-
Total Amount for CAMC of Stack Parking system (In Rs.)From From 15-March-27 to 14-
Total Amount for CAMC of Stack Parking system (In Rs.)From From 15-March-27 to 14-
h) NDSR-21 AMC of UPS system
Providing AMC service through OEM as per terms and condition scope of work and as per standard operating procedure of OEM
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 11,287.50 79,012.50
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 per month 7.00 11,287.50 79,012.50
Total Amount for UPS system (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 12,078.00 1,44,936.00
Total Amount for UPS system (In Rs.)From 15-March-26 to 14-March-27 per month 12.00 12,078.00 1,44,936.00
Total Amount for AMC UPS system (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 12,923.00 1,55,076.00
Total Amount for AMC UPS system (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 12,923.00 1,55,076.00
h) NDSR-22 AMC of solar system
Providing AMC service through OEM as per terms and condition scope of work and as per standard operating procedure of OEM
Total Amount for (In Rs.)From15-Aug-25 to 14-March-26 per month 7.00 9,027.49 63,192.44
Total Amount for (In Rs.)From15-Aug-25 to 14-March-26 per month 7.00 9,027.49 63,192.44
Total Amount forAMC of solar system(In Rs.)From 15-March-26 to 14-March-27 per month 12.00 9,659.00 1,15,908.00
Total Amount forAMC of solar system(In Rs.)From 15-March-26 to 14-March-27 per month 12.00 9,659.00 1,15,908.00
Total Amount for AMC of solar system (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 10,335.00 1,24,020.00
Total Amount for AMC of solar system (In Rs.)From 15-March-27 to 14-March-28 per month 12.00 10,335.00 1,24,020.00
7 Miscallaneous works
a) NDSR Façade Cleaning
Digitally signed by AMIT
BILL OF QUANTITIES
S.No. DSR/NDSR Description of item/work Unit Qty. Rate in Rs. Amount in Rs.
Mechanized Cleaning of the Outer Façade Glasses, ACP sheets of every building by applying chemicals and other materials etc. at any height including
scaffolding/Jhula and silicon filling wherever necessary as per direction of Engineer-in-charge. Nothing extra shall be paid for any kind of arrangements or what so
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 Sqft 53,958.33 2.30 1,24,104.17
Total Amount for (In Rs.)From 15-Aug-25 to 14-March-26 Sqft 53,958.33 2.30 1,24,104.17
Total Amount for Façade Cleaning (1 times a year) In Rs.)From 15-March-26 to 14-
Total Amount for Façade Cleaning (1 times a year) In Rs.)From 15-March-26 to 14-
Total Amount for Façade Cleaning (1 times a year) (In Rs.)From 15-March-27 to 14-
Total Amount for Façade Cleaning (1 times a year) (In Rs.)From 15-March-27 to 14-
b) 14.75A Cleaning of water tanks
Cleaning of terrace/loft/ under Ground water storage tank (inside surface area) at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank
and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of
tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should
be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if
during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account)
water tank cleaning in (2 times a year) From 15-Aug-25 to 14-
water tank cleaning in (2 times a year) (In Rs.)From 15-March-26 to 14-March-27 Litre 2,44,400.00 0.54 1,30,754.00
water tank cleaning in (2 times a year)(In Rs.)From 15-March-27 to 14-March-28 Litre 2,44,400.00 0.57 1,39,906.78
a) NDSR Prime Cost
Prime cost has been taken for reimbursement of expediture like Refilling Fire Extingushires, battery, seasonal plant etc. including providing of High Speed diesel
including transportation from neaarest fuel station as pr requirement of site/or instructions given by client/ or as per direction of Engineer-in-charge. The contractor
has to pruchase the itms with prior approval of Enginner Incharge on most competative rates from market. Prime cost will be paid on actaual basis.
Grand Total (In Rs.) for 1st YEAR (2025-2026) 1,52,21,362.00
Grand Total (In Rs.) for 1st YEAR (2025-2026) 1,52,21,362.00
Grand Total (In Rs.) for 2nd YEAR (2026-2027) 2,30,04,579.00
Grand Total (In Rs.) for 2nd YEAR (2026-2027) 2,30,04,579.00
Grand Total (In Rs.) for 3rd YEAR (2027-2028) 2,46,14,900.00
Grand Total (In Rs.) for 3rd YEAR (2027-2028) 2,46,14,900.00
Grand Total 6,28,40,841.00
Grand Total 6,28,40,841.00
Digitally signed by AMIT
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT ITD Kochi.pdf
Tender Document
BoQ ITD Kochi.pdf
Tender Document
SCC ITD Kochi.pdf
Tender Document
scope of work ITD Kochi.pdf
Tender Document
GCC PMC 2022 Upto Amendment 13.pdf
Tender Document
Instruction to Bidder for online Bid Submission.pdf
Tender Document
Forms.pdf
Tender Document
Integrity pact ITD Kochi.pdf
Tender Document
corrigendum-4120-corrigendum.pdf
pdf • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .