Loading…
Loading…
Tender Value
₹78 L
EMD Value
₹5.9 L
Closing Date
6 Oct 2026, 12:00 pm
Praveen Kumar
Suprintendig Engineer Varanasi Cercle Varanasi
Alinagar Naibasti SH 120 se Pachafedawa NH 19 Tak Mukhya Marg Ki Patari Ka Chhuta Bhag Sampark Marg Ka Nirman Karya
2026_CEUVZ_1184757_5
4143/183Com-VNSCircle/2026-27 Dated-25.08.2026
Open Tender
Civil Works
Fixed-rate
180 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹5.9 L
Yes
6 Oct 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,000 | Cum | 73 | ₹3,65,000 |
| 2 | Construction of granular Sub-base by providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as perTechincal Specification clause 401 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 465.75 | Cum | 2,080 | ₹9,68,760 |
| 3 | Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 323.44 | Cum | 2,650 | ₹8,57,109.38 |
| 4 | Construction of un reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M30(Grade) coarse and fine aggregates confoming to IS:383 maximum size of coarse aggreagate not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) spreading the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints and near aapproaches and construction joints admixtures as approved curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. As direction by the E/I, (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 646.88 | Cum | 7,750 | ₹50,13,281.25 |
| 5 | Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, transporting to site, spresding grading to reqiire slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,364.19 | Cum | 61 | ₹83,215.44 |
| 17 | PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 36890C/RMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. | 1 | Job | - | - |
| 17.1 | 1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. | 1 | Job | - | - |
| 17.2 | 2nd year - maintainance cost 0.25% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. | 1 | Job | - | - |
| 17.3 | 3rd year - maintainance cost 0.50% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. | 1 | Job | - | - |
| 17.4 | 4th year - maintainance cost 0.75% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
BOQ_2229033.xls
BOQ • 0.29 MB
4143crdm.pdf
PDF • 0.24 MB
Crdm.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .