| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹15.2 L+₹26,827.75 (1.80%)Admitted-Fee/PreQual/Technical/Finance | ₹15.2 L+₹26,827.75 (1.80%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Muhayuddeen koya M L2 | MOHAMMED K L1 |
|---|---|---|---|---|---|
| 1.00water tank | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 20.65 | cum | 3,372 ₹69,635.17 Lowest | 3,372 ₹69,635.17 Lowest |
| 1.00 | OD423261/2025-2026:Demolishing laterite masonrywork manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 7.45 | cum | 1,956 ₹14,576.11 Lowest | 1,956 ₹14,576.11 Lowest |
| 1.00 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | 1 | each | 136 ₹136 Lowest | 136 ₹136 Lowest |
| 1.00 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 20.65 | cum | 250 ₹5,162.75 Lowest | 252 ₹5,204.05 |
| 1.00 | OD423005/2025-2026:Engaging labours coolie | 25 | each | 994 ₹24,850 Lowest | 994 ₹24,850 Lowest |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 28.95 | cum | 330 ₹9,553.5 Lowest | 330 ₹9,553.5 Lowest |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.26 | cum | 7,286 ₹16,473.65 Lowest | 7,286 ₹16,473.65 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 12.24 | sqm | 354 ₹4,332.96 Lowest | 354 ₹4,332.96 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 13.2 | sqm | 700 ₹9,240 Lowest | 700 ₹9,240 Lowest |
Tender Value
₹15.2 L
EMD Value
₹38,080
Closing Date
10 Sept 2026, 6:00 pmClosed
Assistant Engineer
LID EW ,SECTION FEROKE
DEMOLITION AND CONSTRUCTION OF KOLATHOTTUTHAZHAM WATER TANK
2026_LSGD_867093_1
AE/LID EW/FRK/2026-27/04RT
Open Tender
Civil Works - Others
Item Rate
Feroke Municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹38,080
Yes
12 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1water tank | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 20.65 | cum | - | - |
| 1.002 | OD423261/2025-2026:Demolishing laterite masonrywork manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 7.45 | cum | - | - |
| 1.003 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | 1 | each | - | - |
| 1.004 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 20.65 | cum | - | - |
| 1.005 | OD423005/2025-2026:Engaging labours coolie | 25 | each | - | - |
| 1.006 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 28.95 | cum | - | - |
| 1.007 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.26 | cum | - | - |
| 1.008 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 12.24 | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 13.2 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1468149.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.05 MB
PA.pdf
Tender Documents • 0.25 MB
AFFI.pdf
Tender Documents • 0.23 MB
BOQ_1468149.xls
BOQ • 0.32 MB
EPAY.pdf
Tender Documents • 0.23 MB
FEE.pdf
Tender Documents • 0.33 MB
FOT.pdf
Tender Documents • 0.25 MB
IP.pdf
Tender Documents • 0.23 MB
SBD.pdf
Tender Documents • 2.28 MB
NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .