Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC PLOT NO 3A IDA SEETARAMPATNAM PALONCHA 507 115 BHADRADRI KOTHAGUDEM DISTRICT TELANGANA | PALONCHA | KOTHAGUDEM | TELANGANA | 507115 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.4 L+₹60,000 (5.56%)Rejected-AOC 613 GIDC ESTATE RANOLI 391350 VADODARA GUJARAT | VADODARA | VADODARA | GUJARAT | 391350 | L2 | Rejected-AOC L2 | |
| 3 | l3₹12.1 L+₹1.3 L (12.0%)Rejected-AOC 150 VILLARASAMPATTI NAAL ROAD NASIYANPUR ROAD VILLARASAMPATTI POST ERODE TAMAIL NADU 638107 | ERODE | ERODE | TAMIL NADU | 638107 | l3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical 430 3RD FLOOR A WING ORCHARD MALL ROYAL PALMS ESTATE AAREY MILK COLONY GOREGAON EAST MUMBAI 400065 | MUMBAI | MUMBAI | MAHARASHTRA | 400065 | - | Rejected-Technical Not qualified the technical conditions |
Tender Value
₹13.8 L
EMD Value
₹34,500
Closing Date
14 May 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Jayan.K
Deputy Chief Engineer, Generation Circle, Moolamattom
IHEP- Re-Insulation of two numbers rotor pole and assembling the pole shoe with the spare coil of 130MW 1st stage generator at Idukki Underground power House Moolamattom
2024_KSEB_671999_1
Re-E-Tender No.02/DYCE/24-25/GTR/ dated 22.04.2024
Open Tender
Repair and Maintenance Works
Service
45 days
Moolamattom
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,900
Yes
₹34,500
Yes
24 Sept 2024
24 Apr 2024
18 May 2024
24 Apr 2024
14 May 2024
25 Apr 2024
Electrical Items :
Charges towards re-insulation of rotor pole by removing the old insulation from the coils, checking the inter- turn joints for any cracks and rectifying the same, providing new turn insulation out of class ‘H’ (180 °C) epoxy coated NOMEX paper, pressing and curing the coil at 150C under pressure, providing new pole body insulation out of F class EPOXY glass laminates, placing the coils on the rotor pole body, providing new sole plate to keep the coil locked under pressure, conducting all the tests prescribed in IS, painting the pole body, coil assembly with moisture repellent varnish, rectification of slippage of inter – turn insulation by providing mild steel collar at the back of the field coil and welding it to the pole body by keeping under pressure and conducting the following test at our works. 1.Measurement of insulation resistance 2.Measurement of winding resistance 3.AC High Voltage Test 4.Surge Comparison Test 5.Measurement of AC impedance and power Factor
Assembling the available Pole shoe with the spare Pole coilincluding complete assembling,consolidating, pressing the coils with pole shoe, lockingincluding final testing as per IS standards for the salient Pole ofIdukki HEP, 130 MW Generator including cost of all materials except the pole coil and pole shoe including cost of loading ,unloading ,transportation ,insurance etc
Indian Engineering Company
Coral Rewinding India Private Limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .