Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC NO DETAILS FOUND | L1 | Accepted-AOC L1 | |
| 2 | L1₹2.6 LRejected-Finance KAMIL K T PUTHANPURAKKAL VEEDU P P ROAD VANDOOR P O 679328 | MALAPPURAM | KERALA | 679328 | L1 | Rejected-Finance L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical L5 | |
| 4 | Rejected-Technical F O ASSOCIATES LAND MARK CENTRE NEAR BUS STAND KASARAGOD | KASARAGOD | KASARAGOD | KERALA | - | Rejected-Technical L3 | |
| 5 | Rejected-Technical | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | SAKKIR HUSSAIN L2 | UNNIMAMMUTTY K T L4 | Mohammed Faisal K L3 | ABDUL BASHEER K L1 | KHALID.P L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Drinking Water Project | ||||||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 2.25 | cum | 1,848 ₹4,158 | 1,918.83 ₹4,317.37 | 1,891.09 ₹4,254.95 | 1,777.34 ₹3,999.02 Lowest | 2,011.3 ₹4,525.43 |
| 1.00 | 50.18.9.6.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 50 mm dia 10Kgf/cm2 | 465 | metre | 236 ₹1,09,740 | 251.95 ₹1,17,156.75 | 248.3 ₹1,15,459.5 | 233.37 ₹1,08,517.05 Lowest | 264.09 ₹1,22,801.85 |
| 1.00 | 50.18.9.4.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.32 mm dia 10.Kgf/cm2 | 200 | metre | 200.46 ₹40,092 | 213.62 ₹42,724 | 210.53 ₹42,106 | 197.87 ₹39,574 Lowest | 223.91 ₹44,782 |
| 1.00 | 50.18.9.3.2:Providing and fixing PVC pipes includes jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 25 mm dia 10KGF/cm2 | 200 | metre | 182.98 ₹36,596 | 194.65 ₹38,930 | 191.96 ₹38,392 | 180.41 ₹36,082 Lowest | 204.16 ₹40,832 |
| 1.00 | 50.18.8.2.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 20 mm pipe 10 Kgf/ cm2 | 60 | metre | 328.8 ₹19,728 | 349.65 ₹20,979 | 344.59 ₹20,675.4 | 323.86 ₹19,431.6 Lowest | 366.5 ₹21,990 |
| 1.01 | 50.18.9.19.1:Providing and fixing PVC pipes including fixing the pipe with clamps/ clips/ at 1.00 m spacing . This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 mm dia 6 Kgf/cm2 - External work- Exposed on wall | 52 | metre | 313 ₹16,276 | 325.99 ₹16,951.48 | 321.28 ₹16,706.56 | 301.95 ₹15,701.4 Lowest | 341.7 ₹17,768.4 |
| 1.01 | 18.49.1:Providing and fixing C.P brass bib cock of approved quality conforming to IS: 8931.15 mm nominal bore | 40 | each | 390 ₹15,600 | 415.12 ₹16,604.8 | 409.11 ₹16,364.4 | 384.51 ₹15,380.4 Lowest | 435.12 ₹17,404.8 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.32 | cum | 264 ₹84.48 | 274.24 ₹87.76 | 270.28 ₹86.49 | 254.02 ₹81.29 Lowest | 287.46 ₹91.99 |
| 1.01 | OD345861/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 1.5 | cum | 706 ₹1,059 | 752.35 ₹1,128.53 | 741.47 ₹1,112.21 | 696.87 ₹1,045.31 Lowest | 788.6 ₹1,182.9 |
Tender Value
₹3.4 L
EMD Value
₹8,463
Closing Date
23 Oct 2025, 6:00 pmClosed
Assistant Engineer
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER, LID-EW LSGD SUB DIVISION, WANDOOR BLOCK PANCHAYAT WANDOOR (PO), MALAPPURAM, PIN-679328
Annual Plan-XIV-th Plan 2025-26 of Wandoor BP, 135, Completion of Kizhakkethala Life Drinking Water Supply Scheme -Division 15-Mampad GP-Project No-135-2025- 26-General Civil Work
2025_LSGD_810394_5
05/2025-26/AE/LID-EW/WDR
Open Tender
Civil Works - Water Works
Item Rate
Wandoor BP
Please refer Tender documents.
10 documents required · 10 mandatory
₹750
Yes
₹8,463
Yes
19 Nov 2025
15 Oct 2025
24 Oct 2025
15 Oct 2025
23 Oct 2025
15 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_1352591.xls
BOQ • 0.30 MB
135.rar
Tender Documents • 1.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .