| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC THOTTIYA MPARA AKKARA PARUTHIK UNNAN ROAD CONCRET E GENERAL CIVIL WORK RETENDER | TIRUNELVELI | TAMIL NADU | 627001 | L1 | Accepted-AOC Accepted Vide Resolution No.3(1),dtd 30/08/2025 of Parappur GP | |
| 2 | L2₹2.2 L+₹2,770.70 (1.29%)Rejected-Finance | L2 | Rejected-Finance Higher rate and hence not admitted | |
| 3 | L3₹2.2 L+₹7,844.21 (3.65%)Rejected-Finance | L3 | Rejected-Finance Higher rate and hence not admitted | |
| 4 | L4₹2.3 L+₹15,019.87 (6.98%)Rejected-Finance | L4 | Rejected-Finance Higher rate and hence not admitted | |
| 5 | L5₹2.4 L+₹22,918.36 (10.7%)Rejected-Finance | L5 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | MOHAMED K L6 | BHURHANUL HAQUE K A L2 | THEKKIL MOHAMED KUTTY L4 | MOHAMED SABEER P K L5 | AHAMMED M L3 | MOIDEEN C. L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Side protection | |||||||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 13.47 | cum | 399.09 ₹5,374.15 | 347.61 ₹4,680.92 | 390 ₹5,251.74 | 379 ₹5,103.61 | 405.52 ₹5,460.73 | 343.19 ₹4,621.4 Lowest |
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 39.5 | cum | 56.98 ₹2,250.77 | 56.39 ₹2,227.46 | 60 ₹2,370.06 | 60.8 ₹2,401.66 | 65.78 ₹2,598.38 | 55.67 ₹2,199.02 Lowest |
| 1.00 | OD202093/2025-2026:[ OD From DAR 60.7.1] DRY RUBBLE MASONRY with hard stone, including in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 54.76 | cum | 3,821 ₹2,09,249.42 | 3,275.57 ₹1,79,380.04 | 3,400 ₹1,86,194.2 | 3,579 ₹1,95,996.78 | 3,500 ₹1,91,670.5 | 3,233.92 ₹1,77,099.16 Lowest |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 2.99 | cum | 8,890 ₹26,607.77 | 7,784.6 ₹23,299.31 | 8,900 ₹26,637.7 | 8,507 ₹25,461.45 | 7,500 ₹22,447.5 Lowest | 7,685.61 ₹23,003.03 |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.1 | tonne | 92,098 ₹9,670.29 | 79,079.73 ₹8,303.37 | 92,253 ₹9,686.57 | 86,431 ₹9,075.26 | 7,500 ₹787.5 Lowest | 78,074.16 ₹8,197.79 |
Tender Value
₹2.5 L
EMD Value
₹6,355
Closing Date
25 Aug 2025, 11:00 amClosed
Naseef Ahamed V
Office of the Assistant Engineer , LID EW section , Parappur GP
Annual Plan-2025 - 26 Parappur GP Pro 69/25-26-Stadium road Side Protection and Concreting in ward 19 -General Civil Work
2025_LSGD_786852_37
LSGD/CELSGD/MPM/PRP/1
Open Tender
Civil Works - Roads
Item Rate
240 days
PARAPPUR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,355
Yes
19 Nov 2025
16 Aug 2025
27 Aug 2025
16 Aug 2025
25 Aug 2025
16 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1293931.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .