Tender Value
₹4.6 Cr
EMD Value
₹7.0 L
Closing Date
31 Mar 2026, 9:30 pmClosed
Bengaluru Development Authority
Varun AEE NPKL
Estimate for sub-surface drain in block 1 sector L and block 2 sector H at Nadaprabhu Kempegowda Layout, Bangalore
BDA/2025-26/OW/WORK_INDENT230
BDA/2025-26/OW/WORK_INDENT230
Open
Other Works
Two Tender Document System(Two Cover)
BDA Nada Prabhu Kempegowda Layout Division
₹5,000
₹7.0 L
31 Mar 2026
17 Mar 2026
1 Apr 2026
24 Mar 2026
26 Mar 2026
Estimate for sub-surface drain in block 1 sector L and block 2 sector H at Nadaprabhu Kempegowda Layout, Bangalore
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/ Kankar/Moorum. (Tipper 18 m3)
Cost of Haulage Excluding Loading and Unloading - Case-1 : Surfaced Road - Taking output 10 t load and lead 10 km = 100 t.km
Supplying , Filling, spreading & leveling for sand in trench, in required thickness over prepared base, for all leads &lifts, loading and unloading all complete as per direction of Engineer -in-charge...
Supplying and laying at site Factory made perforated hard HDPE subsoil drainage pipes pre-wrapped with 150 gsm Geotextile for subsoil drainage system including all necessary coupling/ fittings for joi...
Supplying and laying at site Factory made perforated hard HDPE subsoil drainage pipes pre-wrapped with 150 gsm Geotextile for subsoil drainage system including all necessary coupling/ fittings for joi...
Supplying , Filling, spreading & leveling for 20 mm down size aggregate in trench, in required thickness over prepared base, for all leads &lifts, loading and unloading all complete as per direction o...
Supplying , Filling, spreading & leveling for 40 mm down size aggregate in trench, in required thickness over prepared base, for all leads &lifts, loading and unloading all complete as per direction o...
Formation of Road by Stabilization Method of sub base/Base Course , by premixing Material with aggregates ,murrum and water at OMC in plant mix Machinery carriage of mixed Material by tipper to site, ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bid Doc - NPKL seapag.pdf
Tender Document • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .