Loading…
Loading…
52 results • Latest
Sinking 3 nos of Borewell providing casing pipe submersible pumpset at Kommaghatta NPKL Phase-1, 2 and 3 Housing Project in Sy no 115/1, 115/2 of Kommaghatta Village, Kengeri Hobli Bangalore South Taluk, Bangalore
Management of Commercial Facility in Malleshwaram Market Complex at Sampige Road, Malleshwaram, Bengaluru on Concession Terms under PPP (DBFOT) Model (Quarterly Concession Payment method)
Providing and Fixing Open Gym Equipment including childrens play Equipment for 2BHK Housing Project Phase -02 in Kommaghatta Village Sy.No 115/2, Kengeri Hobali, Bangalore South Taluk , Bangalore
Comprehensive Development Works For Construction of Drains And Culverts In Anjanapura VII & XI Block of BDA Layout.
Comprehensive Development Works For Construction Of Drains And Culverts In Anjanapura 1st Block, 2nd Block & 3rd Block of BDA Layout.
Establishing 2 Nos 2x31.5MVA, 66/11KV Sub-stations at Kannahalli Village & Seegehalli village along with supply & laying of 66Kv Voltage Class 1000Sqmm EHV UG cable for Regular source & Alternative Source including Erection, Testing & Commissioning of all materials/equipments at Nadaprabhu Kempegowda Layout BDA, Bengaluru.
For Supply, Installation, Testing, Commissioning and Comprehensive Maintenance of Video and Audio Conference Meeting Hall System at BDA
Selection of Manpower Agency for Providing Senior DevOps Engineer, Executives, Data Entry Operators & Group-D Personnel to BANGALORE DEVELOPMENT AUTHORITY on Outsourced basis
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 3-LANE BI-DIRECTIONAL ROAD UNDERPASS ON BELLARY ROAD BETWEEN HEBBAL JUNCTION AND UNIVERSITY OF AGRICULTURE SCIENCES UAS STAFF QUARTERS VIA KARNATAKA VETERINARY ANIMAL AND FISHERIES SCIENCES UNIVERSITY KVAFSU CAMPUS BENGALURU ON EPC
Construction of 3 BHK and 2 BHK Housing Project at Sy. No. 73,76 and 2 of Kenchnapura Village in NPKL Layout on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Comprehensive Development Works For Construction Of Drains And Culverts In Balance Portion Of Banashankari 6th Stage 7th Block from link Road to CA-1 (Area proposed land for Bescom) Upto park-1 Surrounding Area Of BDA Layout.
Construction of Balance RCC Drains & Road Works in Banashankari 6th Stage 3rd Block, 4th Block, 5th Block, 11th Block & Further Extension of Banashankari 6th Stage 4th H-B-T Blocks of BDA Layout in Bengaluru South Taluk
Supply and Installation of Desktop Computers and Printers to Bangalore Development Authority
Construction of 4 BHK and 3 BHK Housing Project at Sy No 25, 26,27 and 28 of Challaghatta Village, Bangalore South on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Construction of 4 BHK, 3 BHK and 2 BHK Housing Project at Sy. No. 13, 14, 17/1, 17/2, 17/3, 17/4, 17/5, 17/7, 18/1, 18/2, 19/1, 19/2, 19/3, 19/4, 19/5, 19/8, 19/9 of Ganigarahalli Village-Chikkabanavara Lake View in DSKL Layout, Bangalore North Taluk on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Establishing 1 Nos 2x31.5MVA, 66/11KV Sub-stations at Sulikere village along with supply & laying of 66Kv Voltage Class 1000Sqmm EHV UG cable for Regular source & Alternative Source including Erection, Testing & Commissioning of all materials/ equipments at Nadaprabhu Kempegowda Layout BDA, Bengaluru.
Preparation of Award Sketch of individual survey number as per final notification 2007 for BBC (PRR-1) From Tumkur Road to Hosur Road, Bangalore
Comprehensive Development Works For Construction of Drains And Culverts In Anjanapura IX Block of BDA Layout.
FOUR LANE ELEVATED CORRIDOR ON BELLARY ROAD FROM UAS STAFF QUARTERS TO MEHKRI CIRCLE ALONG WITH UP AND DOWN RAMP IN EAST WEST ELEVATED CORRIDOR, BANGALORE THROUGH ENGINEERING PROCUREMENT CONSTRUCTION (EPC) MODE
Construction of 3 Lane Twin Tunnel (cut & cover) and Cast in situ RCC box in selected reaches from Hebbala flyover area to KVAFSU campus,Bengaluru on EPC Mode
Upgradation of the Existing BDA Web GIS Application, Development of a Public Web GIS Portal and Allied Geospatial Services
Development of 5000 yard gaj site at Phase 4 AND 5 Bathinda Composite work.
Providing Power Supply Connections to Borewells for Watering Plantations at Various Locations in Nadaprabhu Kempegowda Layout, Dr. K. Shivarama Karanth Layout (DSKL), and Banashankari Layout, BDA, Bengaluru.
Preparation of Environmental Impact Assessment Study and Seeking Environmental clearance from the MOEF (GOI) for Development of New Urban Estate at Bathinda Malout Road (Thermal Site) (91.31acre ), Bathinda
ANNUAL MAINTENANCE OF WATER SUPPLY AND SEWERAGE LINES, WATCH AND WARD OF WATER WORKS SITE AND SWEEPING OF ROADS AT OUVGL SPINFED POCKET ABOHAR DIST. FAZILKA FOR THE PERIOD FROM 01.09.2024 to 31.03.2025
Annual MTC of Housekeeping and PH service in PUDA BDA office Complex at Urban Estate, PH-2, Par-1 Bathinda From 01.04.2026 to 31.03.2027
RUNNING, MAINTENANCE, OPERATION AND MANAGEMENT OF SWIMMING POOL AT COMMUNITY CENTRE URBAN ESTATE PHASE-1,BATHINDA. (02 YEAR) (FROM 01.04.2026 TO 31.03.2028).
Paint and repair of PUDA/BDA office at urban estate phase-2 part-1 Bathinda.
Supply of 8x12 sized 7.5 lakhs Uncommon Rare, Endangered and Threatened Native Species including Loading, Transportation and Unloading to multiple planting sites for June 27th 2026 1.5 Million Planting Initiative by BDA for the year 2026-27
Supply and Installation of IT Equipment Tablets, Laptops, All-in-One Desktops, Printers and Scanner to Bangalore Development Authority
Supplying, installation, Testing and Commissioning of 1X250KVA, 415V DG Set at Bengaluru Development Authority Head office, Bengaluru
Tender For Procurement & Transportation of 14x20 Seedlings, Bamboo Tree Guards and Stakes for MAR Roadside Plantation at Nadaprabhu Kempegowda Layout 2026-27
Selection of IT Consultancy Service for design and development of a digital platform (Web & Mobile Applications) to support the 1.5 Million Native Plants Plantation Initiative led by the Bangalore Development Authority on June 27th 2026(BDA)
Supply of 8x12 sized 5 lakhs Common Native Tree Species including Loading, Transportation and Unloading to multiple planting sites for June 27th 2026 1.5 Million Planting Initiative by BDA for the year 2026-27
Supply of 8x12 sized 3.0 lakhs Shrubs, RET Shrubs and Medicinal Native Plants including Loading, Transportation and Unloading to multiple planting sites for June 27th 2026 1.5 Million Planting Initiative by BDA for the year 2026-27
Providing and Fixing Open Gym Equipment including childrens play Equipment for 3BHK Housing Project Phase -01 in Kommaghatta Village Sy.No 115/1 & 115/2, Kengeri Hobali, Bangalore South Taluk , Bangalore
Providing and Fixing Open Gym Equipment including childrens play Equipment for 2BHK Housing Project Phase -03 in Kommaghatta Village Sy.No 115/2, Kengeri Hobali, Bangalore South Taluk , Bangalore
PROVIDING PROJECT MANAGEMENT CONSULTANCY (PMC) Services for the work of maintenance and upgradation of main and approach road pavements in Banashankari 6th stage block 01 to block 11 of BDA Layout areas under BDA Limits.
Improvements and Providing Mobile Compactors for storage to shop No 20 to 25 at Ground Floor of BDA Residential Complex situated at Kengeri Gnanabharathi BDA Complex Bangalore
Annual Maintenance of watch and Ward of Water Works site and Sweeping of Road at 122.12 acre Sugar Mill Site,Budhlada for 01.04.2026 to 31.03.2027
Operation and Maintenance of STP plant at Farid Enclave Ph-1, Faridkot on monthly basis from 01.04.2026 to 31.03.2027
Annual Maintenance Of Water Supply and Sewer Lines, Watch and Ward Of Water Works Site And Sweeping Of Roads At Ouvgl Udekaran Site Sri Muktsar Sahib For The Period From 01-04-2026 To 31-03-2027.
Annual Maintenance of Water Supply, Sewerage Lines and Water Works at Baba Farid University OUVGL Site Faridkot for the period 01-04-2026 to 31-03-2027.
Annual Maintenance of water supply and sewerage lines, watch and ward of water works site and sweeping of roads at OUVGL Spinfed Pocket Abohar Dist. Fazilka for the period 01-04-2026 to 31-03-2027
Construction of RCC Drain, Formation of roads, Development of parks.
Annual Maintenance of PUDA/BDA Office Electrical works, bathinda from 01.04.2026 to 31.03.2027
Design, Development, and Implementation of End-to-End E-Auction Management System with Real-Time Bidding Engine, Fraud Detection, Integrated Payment & Refund Management, and Tamper-Proof Audit Framework for Bangalore Development Authority (BDA)
COMPREHENSIVE DEVELOPMENTS OF ROADS, DRAINS AND PROVIDING BASIC AMENITIES AT JP NAGAR 8TH PHASE 1ST BLOCK KOTHNUR VILLAGE SURVEY NO 3/1, 3/2B AND 4
IMPROVEMENTS TO ROAD AND DRAIN IN J.P.NAGAR 9TH PHASE, 3RD & 4TH BLOCK & FE OF ANJANAPURA 9TH BLOCK, BANGALORE.
Maintenance of Horticulture work at Approach Road to Phase 4 and 5, Ring Road Ph-II, Park adjacent to old PUDA office and supply of material for BDA Office complex at Bathinda for the period of 01.04.2026 to 31.03.2027