Loading…
Loading…
73 results • Latest
Construction of 4 BHK and 3 BHK Housing Project at Sy. No. 104 of Doddathogutu Village in Electronic City, Bangalore South on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
PROVIDING PROJECT MANAGEMENT CONSULTANCY (PMC) Services for the work of maintenance and upgradation of main and approach road pavements in Banashankari 6th stage block 01 to block 11 of BDA Layout areas under BDA Limits.
Maintenance and Upgradation of Main and Approach Roads pavements in Banashankari 6th stage of block 01 to block 11 of BDA Layout Areas under BDA Limits.
Comprehensive Development Works For Improvements to Roads and Drains of Banashankari 6th Stage 10th Block Area in Between CA-1 to CA-3 Covering Site No- 971,921,853 & 1699 and Surrounding Area Of BDA Layout.
COMPREHENSIVE DEVELOPMENTS OF ROADS, DRAINS AND PROVIDING BASIC AMENITIES AT JP NAGAR 8TH PHASE 1ST BLOCK KOTHNUR VILLAGE SURVEY NO 3/1, 3/2B AND 4
Construction of 3 BHK and 2 BHK Housing Project at Sy. No. 39 and 46/2 of Sulikere Village, NPKL Layout,Bengaluru on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Arranging Power Supply Connections to Borewells for Watering Plantations at Various Locations in Dr. K. Shivarama Karanth Layout (DSKL),Nadaprabhu Kempegowda Layout, BDA, Bengaluru (Phase-2)
Comprehensive Development Works For Construction Of Drains And Culverts In Banashankari 6th Stage 7th Block Park main road to Wisdom Road and Surrounding Area Of BDA Layout.
Tender For Procurement & Transportation of 14x20 Seedlings, Bamboo Tree Guards and Stakes for MAR Roadside Plantation at Nadaprabhu Kempegowda Layout 2026-27
Providing Consultancy Services for Project Management and Quality assurance for The Work of Construction of commercial building at sy. No. Part of 19 & part of 20, Konadasapura, Bidarahalli Hobli, Bangalore.
Providing energy efficient LED Street Lights for Banashankari 6th stage, Sir M Visveshwaraiah Layout, Anjanapura Layout and JP Nagar 9th phase further extensions, BDA, Bangalore.
APPOINTMENT OF TRANSACTION ADVISOR FOR DEVELOPMENT OF SKY DECK PROJECT UNDER PUBLIC-PRIVATE PARTNERSHIP (PPP) MODE
Collection of parking fee for vehicles parked in the vehicle parking area at Banashankari 2nd Stage, BDA shopping complex, Bangalore. for the period 2026/27 and 2027/28 For One year
Design, Development, and Implementation of End-to-End E-Auction Management System with Real-Time Bidding Engine, Fraud Detection, Integrated Payment & Refund Management, and Tamper-Proof Audit Framework for Bangalore Development Authority (BDA)
Providing LED Street Lights with Centralized Control and Monitoring System (CCMS) for sector 1 to 9 at Dr K Shivarama Karanata Layout, BDA, Bengaluru.
Providing Power Supply Connections to Borewells for Watering Plantations at Various Locations in Nadaprabhu Kempegowda Layout, Dr. K. Shivarama Karanth Layout (DSKL), and Banashankari Layout, BDA, Bengaluru.
PROVIDING PROJECT MANAGEMENT CONSULTANCY (PMC) Services FOR the work of Construction of Balance RCC Drains & Road Works in Banashankari 6th Stage 3rd Block, 4th Block, 5th Block, 11th Block & Further Extension of Banashankari 6th Stage 4th H-B-T Blocks of BDA Layout in Bengaluru South Taluk
Construction of RCC Drain, Formation of roads, Development of parks.
Selection of Survey Consultant for DGPS/Total Station Survey, Geo-referencing and GIS Mapping for identification, verification and demarcation of Civic Amenity Sites, Parks, Playgrounds, Open Spaces, Roads and other relinquished areas boundary fixing, identification of encroachments and preparation of digital survey drawings for BCCHS Layout covering Sy. Nos. of Raghuvanahalli and Vajarahalli Villages, Uttarahalli Hobli, Bengaluru South Taluk, over an area of approximately 180 acres, as per the sanctioned layout plan and Relinquishment Deed dated 13.03.2001, in compliance with the directions of the Hon.ble High Court.
Comprehensive Development Works For Construction of Drains And Culverts In Anjanapura VIII Block of BDA Layout.
Comprehensive Development Works For Construction of Drains And Culverts In Anjanapura IV Block and V Block of BDA Layout.
Establishing 1 Nos 2x31.5MVA, 66/11KV Gas Insulated Sub-stations at Volagerahalli Housing Complex, BDA along with supply & laying of 66Kv Voltage Class 1000Sqmm EHV UG cable for Regular source & Alternative Source and forming the 66kV TBs including Erection, Testing & Commissioning of all materials/ equipments
Total Road length of the project 21.00 Km Right of Way 100m Access controlled eight lane main carriage way separated with central median of 4m Service road separated from main road by precast post and panel wall on city side - 11m and 7m Service road separated from main road by precast post and panel wall on outskirt side, Covered surface drain after paved shoulder and gantry space, which is rerouted across the service lanes to the outer drain and let out at suitable low-lying areas and water bodies. A green belt or metro corridor throughout the length of the PRR (excluding interchanges and RoB) Bicycle lane 2m wide. Grade separator and interchanges proposed at major radial road crossings (National Highways and State Highways).ROB at 2 Railway crossings. Numerous VUP and VOP, minor and major bridges across Forest area, water bodies and utility gas pipelines. Toll plazas proposed at entry & exit of all interchanges to regulate the entry & exit to the main carriageway. Cross drainage structures, longitudinal drains, median drains, and additional culverts across PRR for water supply lines, utility ducts and chambers. Road furniture like road signs, lane markings, crash barriers, road delineators, raised pavement markers, landscaping and arboriculture.
Comprehensive Development Works For Construction of Drains And Culverts In Anjanapura Block II of BDA Layout.
Improvement of Existing Road Connecting From BDA Hunnigere Villa Project to Tumakur Road
Sinking 3 nos of Borewell providing casing pipe submersible pumpset at Kommaghatta NPKL Phase-1, 2 and 3 Housing Project in Sy no 115/1, 115/2 of Kommaghatta Village, Kengeri Hobli Bangalore South Taluk, Bangalore
Management of Commercial Facility in Malleshwaram Market Complex at Sampige Road, Malleshwaram, Bengaluru on Concession Terms under PPP (DBFOT) Model (Quarterly Concession Payment method)
Providing and Fixing Open Gym Equipment including childrens play Equipment for 2BHK Housing Project Phase -02 in Kommaghatta Village Sy.No 115/2, Kengeri Hobali, Bangalore South Taluk , Bangalore
Comprehensive Development Works For Construction of Drains And Culverts In Anjanapura VII & XI Block of BDA Layout.
Comprehensive Development Works For Construction Of Drains And Culverts In Anjanapura 1st Block, 2nd Block & 3rd Block of BDA Layout.
Establishing 2 Nos 2x31.5MVA, 66/11KV Sub-stations at Kannahalli Village & Seegehalli village along with supply & laying of 66Kv Voltage Class 1000Sqmm EHV UG cable for Regular source & Alternative Source including Erection, Testing & Commissioning of all materials/equipments at Nadaprabhu Kempegowda Layout BDA, Bengaluru.
Construction of 3 BHK and 4 BHK Housing Project at Sy. No. 2, 3, 4 and 19 of Byalakere Village, DSKL Layout,Bengaluru on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
For Supply, Installation, Testing, Commissioning and Comprehensive Maintenance of Video and Audio Conference Meeting Hall System at BDA
Selection of Manpower Agency for Providing Senior DevOps Engineer, Executives, Data Entry Operators & Group-D Personnel to BANGALORE DEVELOPMENT AUTHORITY on Outsourced basis
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 3-LANE BI-DIRECTIONAL ROAD UNDERPASS ON BELLARY ROAD BETWEEN HEBBAL JUNCTION AND UNIVERSITY OF AGRICULTURE SCIENCES UAS STAFF QUARTERS VIA KARNATAKA VETERINARY ANIMAL AND FISHERIES SCIENCES UNIVERSITY KVAFSU CAMPUS BENGALURU ON EPC
Construction of 3 BHK and 2 BHK Housing Project at Sy. No. 73,76 and 2 of Kenchnapura Village in NPKL Layout on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Comprehensive Development Works For Construction Of Drains And Culverts In Balance Portion Of Banashankari 6th Stage 7th Block from link Road to CA-1 (Area proposed land for Bescom) Upto park-1 Surrounding Area Of BDA Layout.
Construction of Balance RCC Drains & Road Works in Banashankari 6th Stage 3rd Block, 4th Block, 5th Block, 11th Block & Further Extension of Banashankari 6th Stage 4th H-B-T Blocks of BDA Layout in Bengaluru South Taluk
Supply and Installation of Desktop Computers and Printers to Bangalore Development Authority
Construction of 4 BHK and 3 BHK Housing Project at Sy No 25, 26,27 and 28 of Challaghatta Village, Bangalore South on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Construction of 4 BHK, 3 BHK and 2 BHK Housing Project at Sy. No. 13, 14, 17/1, 17/2, 17/3, 17/4, 17/5, 17/7, 18/1, 18/2, 19/1, 19/2, 19/3, 19/4, 19/5, 19/8, 19/9 of Ganigarahalli Village-Chikkabanavara Lake View in DSKL Layout, Bangalore North Taluk on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Establishing 1 Nos 2x31.5MVA, 66/11KV Sub-stations at Sulikere village along with supply & laying of 66Kv Voltage Class 1000Sqmm EHV UG cable for Regular source & Alternative Source including Erection, Testing & Commissioning of all materials/ equipments at Nadaprabhu Kempegowda Layout BDA, Bengaluru.
Preparation of Award Sketch of individual survey number as per final notification 2007 for BBC (PRR-1) From Tumkur Road to Hosur Road, Bangalore
Comprehensive Development Works For Construction of Drains And Culverts In Anjanapura IX Block of BDA Layout.
FOUR LANE ELEVATED CORRIDOR ON BELLARY ROAD FROM UAS STAFF QUARTERS TO MEHKRI CIRCLE ALONG WITH UP AND DOWN RAMP IN EAST WEST ELEVATED CORRIDOR, BANGALORE THROUGH ENGINEERING PROCUREMENT CONSTRUCTION (EPC) MODE
Construction of 3 Lane Twin Tunnel (cut & cover) and Cast in situ RCC box in selected reaches from Hebbala flyover area to KVAFSU campus,Bengaluru on EPC Mode
Upgradation of the Existing BDA Web GIS Application, Development of a Public Web GIS Portal and Allied Geospatial Services
Drilling of Borewells, Installation of Submersible Pump-Motor Sets, and Execution of Rising Main Works Near Plantation Sites at Dr. K. Shivaramakaranth Layout, Nadaprabhu Kempegowda Layout, and Banashankari 6th Stage
Providing Consultancy Services for Project Management and Quality assurance for the Construction of 4 BHK and 3 BHK Housing Project at Sy No 104 of Doddathoguru Village in Electronic City Bangalore South on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
BALANCE WORK FOR REJUVENATION AND DEVELOPMENT OF BELLANDUR LAKE, BENGALURU EAST TALUK, BENGALURU