| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1839 Craccepted-aoc | ₹1839 Cr | accepted-aoc |
Tender Value
Refer Docs
EMD Value
₹16.7 Cr
Closing Date
15 Jul 2026, 4:00 pmClosed
Bengaluru Development Authority
Niranjan KM
Construction of 4 BHK, 3 BHK and 2 BHK Housing Project at Sy. No. 13, 14, 17/1, 17/2, 17/3, 17/4, 17/5, 17/7, 18/1, 18/2, 19/1, 19/2, 19/3, 19/4, 19/5, 19/8, 19/9 of Ganigarahalli Village-Chikkabanavara Lake View in DSKL Layout, Bangalore North Taluk on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
BDA/2026-27/BD/WORK_INDENT255
BDA/2026-27/BD/WORK_INDENT255
Open
Buildings
Two Tender Document System(Two Cover)
BDA Housing Project Division No One
10 documents required · 10 mandatory
Mandating satisfactory completion as a prime contractor at least One similar project for any government, semi government, Boards and corporations only Value not less than Rs. 834.84/- Crores
The Tenderer shall have executed following minimum Quantities of Works in one single Financial Year out of the five Financial Years Earthwork 75,000Cum RCC 49,000 Cum Steel Reinforcement 7,000 MT Shuttering 2,10,000 Sqm
Availability by owning the following key and critical equipment for this work : (i) availability by owning at least 50% of the required / specified key and critical equipment for this work and (ii) the remaining 50% can be deployed on lease / hire basis for all works provided Concrete Batching Plant and allied Equipment 2No. of 20/30 cum hr Loaders 6 Nos Tipper Nos Transit Mixers 8 Nos Tower Crane 2 Nos Excavator 6 Nos Generator with capacity 100 KVA 4 Nos. Boomer placer 3 No Concrete pump 3 No Service passenger lift 2 Nos
Liquid assets and or availability of credit facilities of not less than Rs 120 Crores (Credit lines / Letter of Credit / Certificates) from the Nationalized/ Scheduled Banks for meeting the funds requirements etc. (usually the equivalent of the estimated flow for three months in the peak construction period).
Details of on going works, commitments of works and litigation history of works The tenderer should provide an Affidavit swearing to the effect that the stated works are the only works and it is true to the best of his / her / their knowledge
Achieved in at least two financial years a minimum financial Turnover (in all classes of Civil Engineering construction works only) of Rs.954.10 Crores. Note: Financial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the FY 2026-27
₹7,500
₹16.7 Cr
9 Sept 2026
20 Jun 2026
16 Jul 2026
23 Jun 2026
24 Jun 2026
Construction of 4 BHK, 3 BHK and 2 BHK Housing Project at Sy. No. 13, 14, 17/1, 17/2, 17/3, 17/4, 17/5, 17/7, 18/1, 18/2, 19/1, 19/2, 19/3, 19/4, 19/5, 19/8, 19/9 of Ganigarahalli Village-Chikkabanavara Lake View in DSKL Layout, Bangalore North Taluk on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Construction of 4 BHK, 3 BHK and 2 BHK Housing Project at Sy. No. 13, 14, 17/1, 17/2, 17/3, 17/4, 17/5, 17/7, 18/1, 18/2, 19/1, 19/2, 19/3, 19/4, 19/5, 19/8, 19/9 of Ganigarahalli Village-Chikkabanava...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bid Document_ Ganigarahalli_Chikkabanavara Lake View_DSKL.doc
Tender Document • 0.79 MB
Drawings.pdf
pdf • 1.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .