Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | L1 | Accepted-AOC Awarded due to L1 | |
| 2 | L2₹5.2 L+₹67,335 (14.9%)Rejected-Finance | L2 | Rejected-Finance REJECTED DUE TO L2 | |
| 3 | L3₹5.5 L+₹97,485 (21.5%)Rejected-Finance NOT SPECIFIED IN THE DOCUMENT | L3 | Rejected-Finance REJECTED DUE TO L3 | |
| 4 | L4₹5.5 L+₹99,495 (22.0%)Rejected-Finance | L4 | Rejected-Finance REJECTED DUE TO L4 |
Tender Value
Refer Docs
EMD Value
₹17,700
Closing Date
15 Jul 2021, 6:00 pmClosed
GE SHIKARGARH JODHPUR
Military Engineer Services, Garrison Engineer, Shikargarh, Near ASC Supply Depot, Ratanada Jodhpur-342011
RESOURCE MANAGEMENT FOR PUMP HOUSE AT MH JODHPUR IN ARMY AREA JODHPUR
2021_MES_451910_1
8697/E8 17
Open Tender
Miscellaneous Works
Item Rate
335 days
GE SHIKARGARH JODHPUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE SHIKARGARH
₹17,700
Yes
30 Jul 2021
16 Jun 2021
17 Jul 2021
16 Jun 2021
15 Jul 2021
23 Jun 2021
Amount
Outsourcing services for operation/maintenance of water supply installation at MH, Pump House and Fire fighting Pumps with one operator of appropriate category to operate submersible Pump set / Turbine Pump set / Centrifugal Pump / Diesel Engine Pump / Jockey Pump set / water supply distribution sluice valves as per direction given time to time by Engr-in-Charge. Installations will be manned by deploying qualified one operator per shift on round the clock ( 03 shifts of 08 Hrs each / day) including Sunday / Holiday also to work as per daily orders given and as directed by the Engr-in-Charge. Note :- (i) DHPP and Engine Oil will be issued to contractor free to run the DG Sets under Sch-B. (ii) Proper record of issue and consumption shall be maintained and produced alongwith RAR.
Notes for item 1 :- (i) Minimum qualification / experience for Operator shall be ITI in appropriate field or 03 years experience in same field. Contractor shall submit necessary documents for the same before commencement of work for each man power employed by him to Engr-in-Charge. (ii) Contractor shall be fully responsible to obtain security passes and police verification for man power employed by him. (iii Contractor shall provide all tools and safety equipments and minor parts such as nuts, bolts, wires, fuse wires etc as required for day to day working without any extra cost. (iv) Weekly off will be given to all manpower employed by the Contractor as per existing rules. Provision of reliver for each manpower employed by the Contractor shall be deemed to include in item rate quoted. (v) Responsibilities of Cleaning of installation and sorrounding area will be manpower employed by the Contractor and rate quoted for item rate shall be deemed to include in item rate quoted. (vi) Necessary log book / log sheet will be maintained by manpower employed by the Contractor as directed by Engr-in-Charge. (vii) In case Contractor fails to deploy appropriate Electrician for any shift, penalty @ Rs. 2000/- per shift shall be recovered from the Contractor (viii) Contractor shall provide Accidental insurance of minimum 5 Lac to all the employed manpower & copy of Accidental insurance shall be deposited with department within one month of acceptance. (ix) Operator will always remain on duty whenever the proper handing taking over will not be signed. (x) All pumps, motors and installations should be kept Neat and Clean in presentable look, otherwise a recovery at the double rate of quoted will be charged if the Power House are not kept clean at any time. (xi) Operator will take all preventive measures and will always use protective clothing of any unhazards incidents. (xii) Operator will wear face mask, hand gloves & apply sanitizers in hands regularly as the precautionary measures against COVID-19. (xiii) Contractor shall provide all necessary T&P to Technicians (xiv) Operator shall ensure the normal maintenance of Transformers / DG sets like checking of output supply from Transformers / panels, checking of battery termination and charging the battery daily. (xv) Contractor shall provide uniform to all staff employed under this CA and if any staff found non wearing uniform, penalty of Rs. 200/- will be recovered for each staff.
vinayandsons
B K Construction Co.
M/s R K Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .