Loading…
Loading…
Tender Value
₹31.2 Cr
EMD Value
₹5 L
Closing Date
28 May 2026, 5:30 pmClosed
MS Isha Wagh(DFLT)
PHED RAIPUR
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia 22m height approach bridge 45m length, approach road, Electric Sub station 250 KVA/11/.415 KV with all required Work,Raw water V.T. pumps and motors 03 no each of 15HP which can discharge 88076 LPH against Totalhead of29 m at near village Katkona, 3.0 MLD conventional Type Water Treatment Plant, 02-Nos of Clear water centrifugal pumps and motors each of 12.5 H.P. which can discharge ,25963 LPH against head of 65m head and 3 nos of centrifugal pump of 95 H.P. which can discharge 71572 LPH against 223m head ,along with the construction of 3 no of MBR,MBR-1 at village near Salka 110 KL capacity 30 M staging MBR-2, 60 KL capacity 30 M staging at village Katkona, MBR-3 215 KL capacity 30 M staging at village Koda, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 250 m And Clear water pumping main 150 mm Dia DI K-9 Length 2810 m,200mm dia length 19109m,250 mm dia 4905m total 26824 m&Clear Water Gravity Mains pipe O-PVC PN-25 250mm dia – 6343m, ,250mm diaO-PVC PN-16 -2063 mtr,160 mm diaO-PVCPN-16– 31051m,110 mm diaO-PVC PN -16-47136 m . Total Length- 86593 m with all required valves & specials as per attached key plan map, Providing and fixing Bulk flow meters, ,nala crossing and work include taking permission to department. LikePWD, WRD etc. Allied All civil works including Boundary wall around WTP campus. work completion is 12monthsincluding rainy season Integrationof all component,testing& trial run comprises of 03 month testing & 09 Month trial run (with defect liability period of one year),Balance Work under BARDAR- Multi-Village Water Supply Scheme of Block KHADGAWAN, District M.C.B (C.G.) (On Risk and cost Basis).
190647
338/Tendercell/EE/MD/Raipur Date 11-05-2026
RESTRICTED TENDER
WORKS
12 days
PHED RAIPUR
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
15 documents required · 15 mandatory
Public Health Engineering Department (PHED)
WORKS
MS Isha Wagh(DFLT)
RESTRICTED TENDER
PERCENTAGE
A
PHED RAIPUR
O/O CHIEF ENGINEER ZONE RAIPUR (TENDER CELL)
O/O CHIEF ENGINEER ZONE RAIPUR
120
12
No
0
190647
28 May, 2026 5:30:00 PM IST
5 Jun, 2026 10:00:00 AM IST
12 May, 2026 10:00:00 AM IST
338/Tendercell/EE/MD/Raipur Date 11-05-2026
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia 22m height approach bridge 45m length, approach road, Electric Sub station 250 KVA/11/.415 KV with all required Work,Raw water V.T. pumps and motors 03 no each of 15HP which can discharge 88076 LPH against Totalhead of29 m at near village Katkona, 3.0 MLD conventional Type Water Treatment Plant, 02-Nos of Clear water centrifugal pumps and motors each of 12.5 H.P. which can discharge ,25963 LPH against head of 65m head and 3 nos of centrifugal pump of 95 H.P. which can discharge 71572 LPH against 223m head ,along with the construction of 3 no of MBR,MBR-1 at village near Salka 110 KL capacity 30 M staging MBR-2, 60 KL capacity 30 M staging at village Katkona, MBR-3 215 KL capacity 30 M staging at village Koda, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 250 m And Clear water pumping main 150 mm Dia DI K-9 Length 2810 m,200mm dia length 19109m,250 mm dia 4905m total 26824 m&Clear Water Gravity Mains pipe O-PVC PN-25 250mm dia – 6343m, ,250mm diaO-PVC PN-16 -2063 mtr,160 mm diaO-PVCPN-16– 31051m,110 mm diaO-PVC PN -16-47136 m . Total Length- 86593 m with all required valves & specials as per attached key plan map, Providing and fixing Bulk flow meters, ,nala crossing and work include taking permission to department. LikePWD, WRD etc. Allied All civil works including Boundary wall around WTP campus. work completion is 12monthsincluding rainy season Integrationof all component,testing& trial run comprises of 03 month testing & 09 Month trial run (with defect liability period of one year),Balance Work under BARDAR- Multi-Village Water Supply Scheme of Block KHADGAWAN, District M.C.B (C.G.) (On Risk and cost Basis).
500000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
312493000.00
2
4 Jun, 2026 5:30:00 PM IST
312493000
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
16d 16h 31m
15 documents required · 14 mandatory · 1 optional
₹0
₹5 L
12 May 2026
12 May 2026
5 Jun 2026
12 May 2026
28 May 2026
12 May 2026
4 Jun 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.08 MB
2079211872575202702_190647_Bardar.pdf
NIT • 17.89 MB
Download all tender documents and submit your bid