Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance HDM O O EXECUTIVE ENGINEER HSVP DIVISION SONIPAT | ₹1.9 L | L1 | Accepted-Finance Due to 1st lowest |
| 2 | L2₹1.9 L+₹1,949.91 (1.01%)Accepted-Finance | ₹1.9 L+₹1,949.91 (1.01%) | L2 | Accepted-Finance Due to 2nd lowest |
Tender Value
Refer Docs
EMD Value
₹3,900
Closing Date
5 Aug 2026, 5:00 pmClosed
Sh Ajit Singh
DIV RGEC Sonepat
Annual maintenance of Public health services in RGEC, Sonipat
2026_HBC_537790_1
20260D3C165F A9B6 424D 9C04 C065514043D7242HSV
Open Tender
Civil Works
Works
90 days
Sonepat
2 documents required · 2 mandatory
₹250
₹3,900
Yes
7 Aug 2026
30 Jul 2026
6 Aug 2026
31 Jul 2026
5 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) | 97.06 | Sqm. | 147 | ₹14,268.11 |
| 2 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening | 55 | Each | 1,155 | ₹63,525 |
| 3 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 4.15 | cum | 4,374 | ₹18,160.85 |
| 4 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 373.68 | Kg. | 66 | ₹24,662.88 |
| 5 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 18.02 | cum | 4,128 | ₹74,374.18 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_616949.xls
BOQ • 0.31 MB
OT0168730.pdf
Other Document • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .