| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC First lowest | |
| 2 | L2₹3.3 L+₹24,115.22 (7.84%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
₹3.8 L
EMD Value
₹9,465
Closing Date
7 Jan 2023, 6:00 pmClosed
Sreekumar.K
Assistant Executive Engineer Office of the AEE,MI Subdivision,Shoranur
GENERAL-Annual Maintenance 2022-23- Narippottakunnu LIS in Parudur Panchayath- General Civil Work
2022_Irrig_544842_1
IRR/IA/TR/5/2022_5_3_2/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Parudur Panchayath
Please refer tender documents
7 documents required · 7 mandatory
₹835
₹9,465
4 Feb 2023
30 Dec 2022
13 Jan 2023
30 Dec 2022
7 Jan 2023
30 Dec 2022
30 Dec 2022 - 5 Jan 2023
Amount
canal work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD117/2022-2023:Dismantling existing pump for the purpose of changing bush and bearings including all labour charges etc, as per the direction of the department officer at site
OD118/2022-2023:Refitting of pump including refitting of pipe lines and connections and alignment testing and trial run
OD25471/2022-2023:Providing and fixing of pump bearing and bushes of suitable size as per the guidance of the departmental officer at site
OD3347/2022-2023:providing and fixing Name board of size 75x60cm using 1 mm thick MS sheet and 25x25x5 mm angle section and fixing in 240 cm (210 cm above GL and 30 cm below GL) over all height (25x25x5 mm angle section) post including fixing in 20x20x30 cm concrete below ground level.
VT MOHAMMED
Bidder Name
VT MOHAMMED
MUNEER P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_796206.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .