Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹106.5 CrAccepted-AOC 1 ENGINEERS INDIA BHAVAN EIB BHIKAJI CAMA PLACE RK PURAM NEW DELHI SOUTH WEST DELHI DELHI 110066 | NEW DELHI | DELHI | 110066 | ₹106.5 Cr Quoted ₹710 Cr | 1 | Accepted-AOC Lone acceptable bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY NOT ACCEPTED AS NOT MEETING PQC OF TENDER. |
Tender Value
Refer Docs
EMD Value
₹1.9 Cr
Closing Date
30 Aug 2024, 3:00 pmClosed
DGM (CONTRACTS)
AS PER NIT
PROJECT MANAGEMENT MANAGING PROJECT MANAGEMENT CONSULTANCY -MPMC SERVICES FOR THE OVERALL PROJECT AND PROJECT MANAGEMENT CONSULTANCY PMC 2 SERVICES FOR PP, IPA, EDC VCM UNITS AND OFFSITES AND UTILITIES UNDER THE PDPC PROJECT AT PARADIP, ODISHA
2024_REFHQ_176582_1
RHQCC24001
Global Tenders
Consultancy Service
2010 days
PARADIP
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.9 Cr
Yes
IOCL RHQ NEW DELHI, LODHI ROAD
12 Feb 2025
10 Apr 2024
2 Sept 2024
10 Apr 2024
30 Aug 2024
5 Aug 2024
17 Apr 2024
Amount
TOTAL LUMPSUM PRICE FOR ALL CONSULTANCY SERVICES
Total Lumpsum charges for CONSULTANCY SERVICES FOR PHASE- I (Should not be more than 15% of total quoted value of the BoQ as per tender terms and conditions.)
Total Lumpsum charges for CONSULTANCY SERVICES FOR PHASE- II
MAN-MONTH RATES FOR CONSTRUCTION MANAGEMENT AND SUPERVISION in PHASE-II: PMC-2 Units
RCM (Resident Construction Manager)
Dy. RCM/ Lead engineers/ Area Managers (90% of the rate quoted for RCM - Item No. 2.11)
Engineers for various disciplines and other Officers for HSE, Labour Welfare, Stores Management, Documentation Controller etc. (83% of the rate quoted for RCM - Item No. 2.11)
MAN-MONTH RATES FOR MPMC SITE SERVICES IN PHASE-II
RCM (Resident Construction Manager) (Should be same as per price quoted for item no. 2.11)
Dy. RCM/ Lead engineers/ Area Managers (90% of the rate quoted for RCM - Item No. 2.11)
Engineers for various disciplines and other Officers for HSE, Labour Welfare, Stores Management, Documentation Controller etc. (83% of the rate quoted for RCM - - Item No. 2.11)
MAN-MONTH RATES FOR ASSISTANCE IN START-UP, COMMISSIONING & PERFORMANCE TEST RUN ETC
Commissioning Specialist (90% of the rate quoted for RCM - Item No. 2.11)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid