Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹4.4 Cr+₹1.3 Cr (41.0%)Accepted-AOC | ₹4.4 Cr+₹1.3 Cr (41.0%) | L2 | Accepted-AOC REJECTED |
| 3 | L3₹4.5 Cr+₹1.5 Cr (47.2%)Accepted-AOC | ₹4.5 Cr+₹1.5 Cr (47.2%) | L3 | Accepted-AOC REJECTED |
| 4 | Rejected-Technical | - | - | Rejected-Technical DOCUMENT INCOMPLETE |
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
27 Feb 2020, 3:00 pmClosed
SE FLOOD CIRCLE LAKHIMPUR
OFFICE OF THE SE FLOOD CIRCLE LAKHIMPUR
Flood protection work of Marginal bund situated on Right bank of River Sharda in district Pilibhit by strengthening launching apron of spur No. 9B 3 4 5 6 and proposed pitching work between spur No. 5 and 6 and filling work of existing Gap
2020_UPIDC_436222_9
01/SE/2019-20
Open Tender
Civil Works
Item Rate
150 days
PILIBHIT
AS PER NIT
2 documents required · 2 mandatory
₹2,354
EE FLOOD DIVISION PURANPUR
₹9.2 L
5 May 2020
19 Feb 2020
28 Feb 2020
19 Feb 2020
27 Feb 2020
19 Feb 2020
Amount
DESCRIPTION
Earth work in cutting/silt clearence including lift upto 1.50m and lead upto 30m, including cost of driver, POL, maintenance of pocklin machine (By pocklin/ equivalent capacity 60 cum/hour), contractor profit and for making bank in regular shape etc. required for proper completion of work (Excluding cost of GST).
Supplying, laying and placing of Nylone Crates size(1.0mx1.0mx1.0m) filled with local sand/earth in New E.C Bags including cost of E.C. bag, all materials, labours, T&P and carriage charges etc. required for proper completion of work (Excluding cost of GST).
Supplying ,Laying and packing of boulder 20-40 kg.wt. in G.I wire crate size (3.00x1.50x1.00)m including cost of all labour, material, royalty and T&P etc. required for proper completion of work (Excluding cost of GST).
Supplying, Laying and pitching of boulder 20-40 kg. wt. including all cost of labour, material, royalty and T&P etc. required for proper completion of work (Excluding cost of GST).
Supplying & Laying filter of RBM below boulder pitching on slope of bundh including all cost of labour, material, and T&P etc. required for proper completion of work (Excluding cost of GST).
Earth work in Bundh of Ist stage in embankment by power transported earth with a lead beyond 200m and upto 1.0 km. including excavation, loading, un-loading, manual compaction with all lift & proper dressing as directed by Engnieer-in-charge (Complete) etc. required for proper completion of work (Excluding cost of GST).
Earth work in IInd stage (Top Layer) on Afflux bund, guide bund and tatbund above 1.5m height including removal of 20 cm humas, from bund sheet and 15 cm.from borrow areas including 1.5 m lift and 30m lead making profiles & manual compaction but excluding mechanical compaction,including Carriage upto 2.00 km.with proper dressing to profile etc. required for proper completion of work. (Excluding cost of GST).
Earth work in excavation in Foundation of Culvert in ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling watering and ramining of excavated earth in to the trenches or into the space between the stucture and the sides the foundation trenches are into the plinth with removal and disposal directed by the engineer-in-charge up to a distance of 30m from the foundation trenches etc. required for proper completion of work. (Excluding cost of GST)
Laying C.C. 1:3:6 with cement, coarse sand and stone ballast 22-53 mm size including all cost of labour, material, Royalty, carriage and T&P etc. required for proper completion of work (Excluding cost of GST)
First class brick work in 1:4 cement and coarse sand mortar including all lead, lift, cost of all meterial, labour, Royalty, carriage and T&P etc. required for proper completion of work (Excluding cost of GST).
Laying PCC 1:2:4 with cement, coarse sand and stone ballast 12-20 mm size including all lead, lift, cost of all meterial, labour, Royalty, carriage and T&P etc. required for proper completion of work (Excluding cost of GST).
Supply of 1200 mm dia NP3 Hume pipe including all cost of labour, material and T&P, carriage etc. required for proper completion of work (Excluding cost of GST).
Laying and Fixing in position of 1200 mm dia NP3 Hume pipe including all cost of labour, material, T&P and carriage etc. required for proper completion of work (Excluding cost of GST).
Centering and shutering of C.C work including all cost of labour, material, T&P and carriage etc. required for proper completion of work (Excluding cost of GST).
Deep struck cement pointing in 1:2 cement and coarse sand mortar including all cost of labour, material, T&P and carriage etc. required for proper completion of work (Excluding cost of GST).
Earth work in excavation for drain diversion/Trench digging including lift upto 1.5m and lead upto 30m, including cost of driver, POL, maintenance of machine, C.P and proper dressing to profile etc. required for proper completion of work (Excluding cost of GST).
ASHUTOSH KUMAR VERMA
Shri Krishna And Company
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .