Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.3 L+₹80,625 (9.45%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹10.3 L+₹1.8 L (21.2%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹10.8 L+₹2.3 L (26.6%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹11.9 L+₹3.4 L (39.8%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
24 Jun 2023, 2:00 pmClosed
NITHIN C S
SM (P AND P) CD
Replacement of Damaged Structural in Sulphuric Acid Plant and Boat Basin Area, FACT-CD.
2023_FACT_756935_1
04097/2023-2024/E27531
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM101A).
4 documents required · 4 mandatory
₹0
₹12,000
Yes
5 Aug 2023
9 Jun 2023
26 Jun 2023
9 Jun 2023
24 Jun 2023
9 Jun 2023
Replacement of Damaged Structural in Sulphuric Acid Plant and Boat Basin Area, FACT-CD.
Fabrication, and Replacement of Damaged Structurals With New Painted Structurals in SA Plant and Boat Basin Area: Collection of required materials from FACT -CD stores / plant area and transport to the work site at SA Plant area. New structure shall be fabricated as per the instruction of the Officer - in -Charge to meet site requirement. Existing damaged structure in various locations of SA Plant area shall be dismantled/removed and replaced with newly fabricated one / modified structure to meet the site requirement.Damaged structurals shall be transported to scrap yard/area earmarked as per the instruction from site in charge.shall be painted with two (02) coats of zinc chromate yellow primer of approved make/quality and two (02) coats of synthetic enamel paint of distinct colours of approved make/quality. The surfaces to be painted are to be cleaned manually using wire brush to the extent that entire surface is free from dirt, dust, oil, grease or any foreign material.The structural steel after transporting from store to worksite shall be immediately be cleaned and first coat primer shall be applied. The structurals after fabrication and erection shall be applied with second coat of zinc chromate yellow primer after necessary cleaning at all heights and elevations.Two coats of synthetic enamel paint of distinct colours shall be applied one after the other after giving sufficient curing time after each coat applied at all elevations. Any area inaccessible after erection shall be painted beforehand.All costs incurred in painting including cost of paints,primers, painting equipments, cleaning equipments ,handling charges, scaffolding and any other incidental expenses will be under contractor's scope.
MADONNA INDUSTRIES
M K ALIAS
SATHEESH K T
HASSAN MM
VIKRAMAN NAIR S
Sivadasan K
RAJU K.U
K G SIVANANDAN
JRKENGINEERSANDCONTRACTORS
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_795740.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .