Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
10 Mar 2026, 2:00 pmClosed
Executive Engineer JPDCL ED-I Parade Jammu
Office of Executive Engineer JPDCL ED-I Parade Jammu
Fixing of Rate Contract for handling and fabrication of various material in Divisional stores at Narwal Under the jurisdiction of JPDCL Electric Div-I, Parade, Jammu for the financial year 2026-27
2026_PDD_303580_1
ED-I/e-NIT/01 of 2026-27 dated 17.02.2026
Open Tender
Support/Maintenance Service
Turn-key
1 days
Parade Jammu
Please refer tender documents
10 documents required · 10 mandatory
₹1,000
Executive Engineer JPDCL ED-I Parade Jammu
₹30,000
6 Apr 2026
17 Feb 2026
11 Mar 2026
17 Feb 2026
10 Mar 2026
17 Feb 2026
Fixing of Rate Contract for handling and fabrication of various material in Divisional stores at Narwal Under the jurisdiction of JPDCL Electric Division-I, Parade, Jammu for the financial year 2026-27.
Unloading of PCC 8 Mtr Pole
Unloading of PCC 9 Mtr Pole
Unloading of PCC 11 Mtr Pole
Unloading of ST 8 Mtr Pole
Unloading of ST 9 Mtr Pole
Unloading of ST 11 Mtr Pole
Unloading of ST 13 Mtr Pole
Loading of PCC 8 Mtr Pole
Loading of PCC 9 Mtr Pole
Loading of PCC 11 Mtr Pole
Loading of ST 8 Mtr Pole
Loading of ST 9 Mtr Pole
Loading of ST 11 Mtr Pole
Loading of ST 13 Mtr Pole
Dragging of PCC 8 Mtr. Poles at an average distance upto 100 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
Dragging of PCC 9 Mtr. Poles at an average distance upto 100 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
Dragging of PCC 11 Mtr. Poles at an average distance upto 100 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
Dragging of ST 8 Mtr. Poles at an average distance upto 100 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
Dragging of ST 9 Mtr. Poles at an average distance upto 100 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
Dragging of ST 11 Mtr. Poles at an average distance upto 100 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
Dragging of ST 13 Mtr. Poles at an average distance upto 100 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
Loading of 25 KVA Transformer
Loading of 63 KVA Transformer
Loading of 100 KVA Transformer
Loading of 250 KVA Transformer
Loading of 300 KVA Transformer
Loading of 400 KVA Transformer
Loading of 500 KVA Transformer
Loading of 630 KVA Transformer
Unloading of 25 KVA Transformer(New/Write Back Transformer)
Unloading of 63 KVA Transformer(New/Write Back Transformer)
Unloading of 100 KVA Transformer(New/Write Back Transformer)
Unloading of 250 KVA Transformer(New/Write Back Transformer)
Unloading of 300 KVA Transformer(New/Write Back Transformer)
Unloading of 400 KVA Transformer(New/Write Back Transformer)
Unloading of 500 KVA Transformer(New/Write Back Transformer)
Unloading of 630 KVA Transformer(New/Write Back Transformer)
Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New /Damaged 300 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking
Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Unloading of Old /New ACSR Squirel Conductor
Unloading of Old /New ACSR Weasel Conductor
Unloading of Old /New ACSR Rabbit Conductor
Unloading of Old /New ACSR Dog Conductor
Loading of Old/New ACSR Squirel Conductor
Loading of Old/New ACSR Weasel Conductor
Loading of Old/New ACSR Rabbit Conductor
Loading of Old /New ACSR Dog Conductor
Shifting of Old/New ACSR Squirel Conductor from unloading site to stacking site at an average distance upto 100 Mtr and its stacking
Shifting of Old/New ACSR Weasel Conductor from unloading site to stacking site at an average distance upto 100 Mtr and its stacking
Shifting of Old/New ACSR Rabbit Conductor from unloading site to stacking site at an average distance upto 100 Mtr and its stacking
Shifting of Old/New ACSR Squirel Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking
Shifting of Old/New ACSR Weasel Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking
Shifting of Old/New ACSR Rabit Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking
Unloading of Channel/Angle/Flat Iron
Loading of Channel/Angle/Flat Iron
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking
Unloading of Link Set
Unloading of HG Set
Unloading of GO Set
Unloading of DO Set
Unloading of LA Set
Loading of Link Set
Loading of HG Set
Loading of GO Set
Loading of DO Set
Loading of LA Set
Unloading of CT/PT Unit
Loading of CT/PT Unit
Unloading or Loading of SE AL Wire of all sizes
Unloading or Loading of SE Cu Wire of all sizes
Unloading or Loading of LV Bush Rod M-12
Unloading or Loading of LV Bush Rod M-20
Unloading or Loading of LV Bush Rod M-30
Unloading or Loading of HV Bush 11KV
Unloading or Loading of HV Bush Rod
Unloading or Loading of LV Bush M-12
Unloading or Loading of LV Bush M-20
Unloading or Loading of LV Bush M-25/30
Unloading or Loading of Lethoride Paper
Unloading or Loading of Khakhi Paper
Unloading or Loading of Gutties
Unloading or Loading of Washers of sizes
Unloading or Loading of cork sheet of sizes
Unloading or Loading of cork strip of sizes
Unloading or Loading of cotton tape/bovin tape of sizes
Unloading or Loading of craft paper
Unloading or Loading of packing sheet/pressboard
Unloading or Loading of Nuts and bolts of sizes
Unloading or Loading of wooden wedges
Unloading or Loading of Bakelite tubes 1 mtr
Unloading or Loading of Transformer oil
Unloading or Loading of Breather
Unloading or Loading of Welding Rods
Unloading or Loading of allied material for HT/LT Line/Substations material(i.e. Disc/Pin/Shackle/Busbar Insulators etc)
Unloading or Loading of allied material for HT/LT Line/Substations material like Guy wire/G.I Wire
Unloading or Loading of Staysets/Guy
Unloading or Loading of Tension/Suspension fitting/eye bolt
Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly
Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material
Unloading/Loading of Bammboo Ladder
Unloading/Loading of Single/Three Phase Meters
Unloading of PVC Cable single core 95 mmsq
Unloading of PVC Cable single core 120 mmsq
Unloading of PVC Cable single core 185 mmsq
Unloading of PVC Cable single core 300 mmsq
Unloading of PVC Cable single core 400 mmsq
Unloading of PVC Cable single core 630 mmsq
Loading of PVC Cable single core 95 mmsq
Loading of PVC Cable single core 120 mmsq
Loading of PVC Cable single core 185 mmsq
Loading of PVC Cable single core 300 mmsq
Loading of PVC Cable single core 400 mmsq
Loading of PVC Cable single core 630 mmsq
Unloading of AB HT Cable 35 mmsq.
Unloading of AB HT Cable 50 mmsq.
Unloading of AB HT Cable 70 mmsq./95mmsq
Unloading of AB HT Cable 120 mmsq./185 mmsq
Loading of AB HT Cable 35 mmsq.
Loading of AB HT Cable 50 mmsq.
Loading of AB HT Cable 70/95 mmsq.
Loading of AB HT Cable 120 /185 mmsq.
Unloading of AB LT Cable35/ 50 mmsq.
Unloading of AB LT Cable 70/95 mmsq./3.5 core LTcable
Unloading of AB LT Cable 120 /185 mmsq./3.5 core Ltcable
Loading of AB LT Cable 35/50 mmsq.
Loading of AB LT Cable 70/95 mmsq/.3.5 core Ltcable
Loading of AB LT Cable 120/185 mmsq./3.5 core Ltcable
Unloading of HT XLPE Cable 35/50 mmsq.
Unloading of HT XLPE Cable 95/120 mmsq.
Unloading of HT XLPE Cable 150 mmsq./
Unloading of HT XLPE Cable 185 mmsq.
Unloading of HT XLPE Cable 300 mmsq.
Loading of HT XLPE Cable 35/50 mmsq.
Loading of HT XLPE Cable 95/120 mmsq.
Loading of HT XLPE Cable 150 mmsq.
Loading of HT XLPE Cable 185 mmsq.
Loading of HT XLPE Cable 300 mmsq.
Unloading of LT XLPE Cable 35/50 mmsq.single core
Unloading of LT XLPE Cable 70 mmsq.single core
Unloading of LT XLPE Cable 95 mmsq.single core
Unloading of LT XLPE Cable 120 mmsq.single coree
Unloading of LT XLPE Cable 185 mmsq.single core
Unloading ofLT XLPE Cable 300 mmsq.siongle core
Loading of LT XLPE Cable 35/50 mmsq.single core
Loading of LT XLPE Cable 70 mmsq.single core
Loading of LT XLPE Cable 95 mmsq.single core
Loading of LT XLPE Cable 120 mmsq.single coree
Loading of LT XLPE Cable 185 mmsq.single core
Loading ofLT XLPE Cable 300 mmsq.siongle core
Shifting of AB HT CABLE 35 mmsq from unloading site to stacking site and stacking properly
Shifting of AB HT CABLE 50 mmsq from unloading site to stacking site and stacking properly
Shifting of AB HT CABLE 70 /95 mmsq from unloading site to stacking site and stacking properly
Shifting of AB HT CABLE 120/185 mmsq from unloading site to stacking site and stacking properly
Shifting of HT XLPE CABLE 35 mmsq from unloading site to stacking site and stacking properly
Shifting of HT XLPE CABLE 50 mmsq from unloading site to stacking site and stacking properly
Shifting of HT XLPE CABLE 70/95 mmsq from unloading site to stacking site and stacking properly
Shifting of HT XLPE CABLE 120/185 mmsq from unloading site to stacking site and stacking properly
Shifting of AB LT CABLE 35 /50 mmsq from unloading site to stacking site and stacking properly
Shifting of AB LT CABLE 70 /95 mmsq from unloading site to stacking site and stacking properly
Shifting of AB LT CABLE 120 /185 mmsq from unloading site to stacking site and stacking properly
Shifting of LT XLPE CABLE 35 /50 mmsq from unloading site to stacking site and stacking properly
Shifting of LT XLPE CABLE 70 mmsq from unloading site to stacking site and stacking properly
Shifting of LT XLPE CABLE 95 mmsq from unloading site to stacking site and stacking properly
Shifting of LT XLPE CABLE 120 mmsq from unloading site to stacking site and stacking properly
Shifting of LT XLPE CABLE 185 mmsq from unloading site to stacking site and stacking properly
Shifting of LT XLPE CABLE 300 mmsq from unloading site to stacking site and stacking properly
Fabrication of Channel Cross Arms of sorts from MS Channel of sizes
Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes
Fabrication of clamps of sizes from MS flat (suitable for 8 mtr 9mtr,11 mtr and 13 mtr poles)
Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards
Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards
Fabrication of ST poles by way of drilling of extra holes
Fabrication of foundation bolts from MS tor steel including threading as per REC Standards
Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards
Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines
Unreeling and laying of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum
Unreeling and laying of the XLPE/PVC /Single core cables of sizes from the drum
Measuring,Cutting of ACSR Dog/Weasel/Rabbit/Squirrel conductor of required lengths ,making rolls of conductor and binding.
Measuring,Cutting of XLPE/PVC Single core Cable of required lengths ,making rolls and binding.
Unreeling and laying of the XLPE/PVC /AB Three core /3.5 core cables of sizes from the drum
Measuring,Cutting of XLPE/PVC /AB Three core/3.5 core Cable of required lengths ,making rolls and binding.
Carriage /Shifting of ACSR Rabbit/Weasel/Squirrel/Dog conductor from stacking site to loading site
Carriage /Shifting of ACSR Rabbit/Weasel/Squirrel/Dog conductor from unloading site to stacking site
Carriage /Shifting of XLPE/PVC Single core Cable from unloading site to stacking site
Carriage /Shifting of XLPE/PVC Single core Cable from stacking site to loading site
Carriage/Shifting of XLPE/PVC /AB Three core/3.5 core Cable from unloading site to stacking site
Carriage of XLPE/PVC /AB Three core/3.5 core Cable from unloading site to stacking site
Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators ,fittings, Pin insulators with pins etc
Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.and stacking
Cutting of Vegetation, Bushes , Wild Grass, trees to avoid any mishappening of untoward incidents
Carriage of Green Vegetation Bushes , Wild Grass, trees after cutting and dumping away from store
Straightening of tilted fencing posts in the store premises for repair of fecning
Insertion of new fencing Posts in the store for repair of fencing
Dismantling of existing mesh fencing
Fixing of mesh Fencing
Fixing of CGI Sheets
Dismantling of CGI sheets
Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA
Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA
Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking
Painting of Red oxide/Aluminium Paint) of Fabricated Material
Unloading of old loose conductor and making bundles
Checking & maggering of 11KV LA set HG set GO set CT/PT unit
Unloading of PVC Cable 16 mmsq. 2 core 1.1KV grade
Loading of PVC Cable 16 mmsq. 2 core 1.1KV grade
Shifting/Carriage of 16 mmsq. 2 core PVC Cable upto 100 mtr
Unloading of PVC Cable 10 mmsq. 2 core 1.1KV grade
Loading of PVC Cable 16 mmsq. 2 core 1.1KV grade
Shifting/Carriage of 16 mmsq. 2 core PVC Cable upto 100 mtr
Unloading or Loading of PVC Cable single core 50 mmsq
Unloading or Loading of PVC Cable single core 120 mmsq
Shifting/Carriage of 1 core PVC Cable50 mm upto 100 mtr
Shifting/Carriage of 1 core PVC Cable120 mm upto 100 mtr
Unloading/Loading of Paint
Unloading/Loading of IPC
Unloading/Loading of Mid span straight through jointing kit
Unloading/Loading of LT 3.5 Core jointing kit
Unloading/Loading of 11kv 3 core straight through jointing kit
Unloading/Loading of 11kv 1 core straight through jointing kit
Unloading/Loading of trivector meter
Unloading/Loading of 11KV Isolator
Unloading/Loading of changeover switch
Unloading/Loading of MCB/MCCB
Unloading/Loading Of Flood light
Drilling of holes in M.S Iron for fabrication
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
sbd01.pdf
Tender Documents • 1.14 MB
BOQ_985848.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .