Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance SPH 40 KAIGA TOWNSHIP MALLAPUR 581 400 KARWAR | KARWAR | UTTARA KANNADA | KARNATAKA | 581400 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
17 Feb 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer(Civil) BSNL
6th floor, Administrative Building, Karimabad, Ghoddod Road, Surat
Construction of tower foundation of 40 M N.B. tower at Sighana (Jabalpur Make)(dist.Dang)
2021_BSNL_69648_1
46/BSNL/EE/CD/SRT/ 2020-21
Open Tender
Civil Works
Item Rate
45 days
Sighana
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Accounts Officer (Cash), Office of the PGMTD,Surat
Exempted
24 Feb 2021
9 Feb 2021
20 Feb 2021
9 Feb 2021
17 Feb 2021
9 Feb 2021
30 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed.
(a) All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator) manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
(a) Hard rock (blasting prohibited)
Filling available excavated earth (including rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
(a) All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level.
(a) 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.
(a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form for.
(a) Foundations, footings, bases of columns, etc. for mass concrete.
(b) Lintels, beams, plinth beams, girders, bressumers and cantilevers.
(c) Columns, Pillars, Piers, Abutments, Posts and Struts.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
(a) Thermo-Mechanically Treated bars.
Fixing of all anchor foundation bolts with the help of templete in accurate position and levelling etc. as per standard drawing accurately including necessary equipments or positioning work such as providing platform for bearing/fixing of templetes, anchor bolts etc. complete as per direction of Engineer-in-charge but excluding cost of anchor bolts, templates, nuts and washers which will be supplied by the department.
Structural steel work welded in built up sections in framed work using Tees, angles, flats, bars etc. for feeder support cable tray horizontally from tower to building, vertically on the wall of building and from building to inside equipment room including fixing in position with suitable supporting / fixing arrangements at the tower end, building and floor using connecting plates and rivetting / bolting or embedding in walls / floors etc. complete as required and as directed by Engineer-in-charge and including providing and applying two or more coat of synthetic enamel paint over and above one coat of approved steel primer all complete.
NOTES : (1) Material not to be galvanised. (2) This item is including supply of materials, fabrication, erection, priming and painting all complete. (3) The rate includes all material, their carriage, octroi etc. as well as labour and T& P necessary for straightening, cutting, welding, filing, drilling etc. all complete for above all the operations. (4) Measurement : Weight of all the material supplied (weight of each piece in exact length as required as per drawing) including weight of nuts / bolts and washers shall be measured for payment.
OM ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .