Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹24.2 L
EMD Value
₹48,454
Closing Date
15 Oct 2026, 3:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The EE, MCD, PWD(B),ILS Road, Agartala
O/O The EE, MCD, PWD(B),ILS Road, Agartala
Construction of one (01) Class room, Teachers room and Demonstruction room at Netaji Subash Homeopathic Hospital, Renters colony, Agartala, Tripura during the year 2026-27/ SH Earth work, brick work, RCC work, tiles, PVC ceiling etc. (Phase-II)
2026_CEPWD_77839_1
58/EE/MCD/PWD(B)/2026-27
Open Tender
Civil Works - Building
Percentage
60 days
Homeopathic Hospital, Renters colony
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹48,454
8 Oct 2026
8 Oct 2026
15 Oct 2026
8 Oct 2026
15 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means over areas (exceeding 30cm indepth, 1.5m in width as well as 10 sqm on plan) includingdisposal of excavated earth, lead upto 50m and lift upto1.5m, disposed earth to be levelled and neatly dressedAll kinds of soil | 18.6 | cum | 179.9 | ₹3,346.14 |
| 2 | Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) includingdressing of sides and ramming of bottoms, lift upto 1.5 m,including getting out the excavated soil and disposal ofsurplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 38.4 | cum | 231.6 | ₹8,893.44 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 21.2 | cum | 1,177.3 | ₹24,958.76 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 40 mm nominal size) | 16.6 | cum | 10,249.1 | ₹1,70,135.06 |
| 5 | First class brick work in foundation and plinth
including cost of all materials as required complete:-In cement mortar 1:5 ( 1 cement : 5 fine sand ). | 18.6 | cum | 9,667.4 | ₹1,79,813.64 |
| 6 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:- In cement mortar 1:5 ( 1 cement : 5 fine sand ). | 35.8 | cum | 11,224.2 | ₹4,01,826.36 |
| 7 | Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 20.6 | sqm | 1,311.8 | ₹27,023.08 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level:1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 6.7 | cum | 12,073.8 | ₹80,894.46 |
| 9 | Reinforced cement concrete work in walls (any
thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 7.2 | cum | 13,305.8 | ₹95,801.76 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, alconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 6.1 | cum | 13,584.5 | ₹82,865.45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
int.PDF
Additional Documents • 0.47 MB
TEN.pdf
Tender Documents • 3.00 MB
BOQ_79233.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .