Executive Engineer, Electrical (R&B) Division, Valsad
Providing Solar Rooftop System on Rest house at Ubharat, Ta. Jalalpore, dist. Navsari
353075
TENDER NOTICE NO. 16 OF 2026-27 (Second Attempt)
Open
Electrical Works
Works
Valsad
8 documents required · 8 mandatory
₹900
Executive Engineer, Electrical (Rand B) Division, Valsad
₹9,800
7 Oct 2026
7 Oct 2026
7 Oct 2026
15 Oct 2026
7 Oct 2026
Name of Providing Solar Rooftop System on Rest house at Ubharat, Ta. Jalalpore, dist. Navsari
Qnty Sr.No. Item Description Rate After Amount
1 Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar
Power Plant with
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy
Frame With Twin Wall Profile, Front Cover : High Transmission Low-Iron
Tempered Glass (AR Coated), High efficency and positive power tolerance Pmax:
0/+5, Module Efficiency should be approx. 19.5%-22%, Normal operating
temperature 45'C, Junction Box with Waterproof IP67 & MC4 Compatible and
Enclosed with Bypass diodes, 100% Electroluminescence test to ensure error free
Modules, Thep. temp. co-efficient of the PV module shall equal or better than -
0.45%/degree C. Solar PV modules of minimum fill factor 75% to be used. Unit
Production:- More than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year
Product warranty. Modules must be complied to the DCR(Domestic content
requirements). The Ration of AC to DC is 5:6 for the Installation capacity which are
given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% -
98.9%, O/p Frequency: 50/60Hz, Operating Altitude (m) ≤4000, O/p Power Factor:
~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated protection
of Inverter are Anti-islanding Protection, Input Reverse Polarity Protection,
Insulation Resistor Detection, Ground fault protection, Residual Current Monitoring
Unit, Output Over Current Protection, Output Short Circuit Protection, Output Over
Voltage Protection, PV array string fault Protection. Protection Degree: IP65, User
Interface LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor
Detection Integrated, Residual Current Monitoring Unit Integrated, Output
Over Current Protection Integrated, Output Short Circuit Protection
Integrated, Output Over Voltage Protection Integrated, Protection Degree:
IP65, User Interface LCD & APP,Datalogger & Communication: GPRS /
Wi-Fi, Module Mounting Structure: The mounting (Rectangular pipe /
square pipe / circular pipe) with requisite cross bars, nuts and bolts, etc.
shall be Hot deep galvanized with minimum 80micron coating. The
Rectangular / square /circular hollow pipe section used for the structure
should have a minimum thickness of 2.0 mm. other than above, the material
thickness should be minimum 2.5 mm. A certificate of a structural engineer
certifying the strength and stability of the mounting structure to withstand
the weight and wind speed of 150 km/hour , shall be submitted by the
vendors. Hot Dipped Galvanized steel coils. suitable arrangement for base
plate for foundation , solar panel mounting, the structure should be suitable
for carry the load of solar panel,wiring, sprinkler system etc. with necessary
foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used for
installtion of stucture should be (SS 304) quality.The ground clearance of
the bottom most edge of solar panel shall not be less than 300 mm to
mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM
Balane of System with necessary Swichgears (Suitabel size and protection
of ACDB & DCDB), inter connecting wiring, earthing system as per the
CEIG drawing approval,
lightining arrester system as per the CEIG drawing approval, all liasoning
work with various gov. dipartment like state nodal agency,DISCOM &
CEIG is included in agency scope (Excluding All charges namely GEDA
Application fees, Solar connectivity Charges, Meter connectivity Charges,
Meter testing Charges and system stability/strenthning charges.)
Qnty Sr.No. Item Description Rate After Amount
22 (C ) Grid Tied Solar Power System: 11 - 25 kW (3 - phase) 42,455.35 Rupees Forty
22 2 Providing & erecting Automatic solar panel cleaning system for solar power 1,841.23 Rupees One
projects which includes necessary plumbing work (UPVC pipes and Thousand Eight
accessories) from source of water to project site (up to 30 meters),Suitable Hundred Forty
size of sub mercible/ open well motor, necessary wiring for motor and One And Paise
sprinkler system with safety, timer circuit for automatically on/off the Twenty Three
sprinkler system, necessary size oand number of nozzles/JET (minimum 1 Only
Nozzle/Jet per module). (D) 21KW-50KW Cleaning System
Deputy Executive Engineer Executive Engineer
Electrical R & B Sub-Division Electrical (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule B Solar Rest House Ubharat.pdf
Supply and Installation Commissioning with 5 year CMC of Solar.pdf
SPECIAL CONDITIONS.pdf
Notic No 16 of 2026-27 Second Attempt Solar.pdf
ELEGIBILITY CRITERIA.pdf
4.0 FINAL _ SBD (Electrical Work) _ 2024 _ 120 pg (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .