Tender Value
Refer Docs
EMD Value
₹27,202
Closing Date
27 Dec 2023, 4:00 pmClosed
HOD (MKTG AND PPC)
KEL MAMALA KOCHI
CONSTRUCTION OF OPEN GYM AT MAVELIPPURAM, WARD 14, THRIKKAKKARA MUNICIPALITY, ERNAKULAM DISTRICT
2023_KEL_633982_1
KRO/BDC/1536/2023
Open Tender
Civil Works - Others
Item Rate
90 days
KEL MAMALA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,950
₹27,202
Yes
29 Dec 2023
20 Dec 2023
28 Dec 2023
20 Dec 2023
27 Dec 2023
20 Dec 2023
20 Dec 2023 - 27 Dec 2023
Amount
Construction of Open GYM
od271826/2023_2024 : Providing and fixing Step trainer - FNF 007 (Make FUN PLAY )using, Minimum 100 NB G.I. C CLASS pipes for MAIN FRAME, Minimum 40 NB G.I. pipe for FOOT REST PIPE, Minimum 40NB & 25 NB G.I. pipe for HANDLE, Minimum 25 NB & 40 NB GI B-CLASS Pipe for CONNECTING PIPE, LLDP Rotomoulded seat with inbuilt bolts 3/8" X 1.5" for FOOT REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge
od271827/2023_2024 : Providing and fixing Leg press - FNF006 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe- for MAIN FRAME, Minimum 32 NB GI B-CLASS pipe for SEAT FRAME, Minimum 40 NB & 25 NB B CLASS GI B-CLASS Pipe for HANDLE FRAME, Minimum 32NB & 25NB GI B-CLASS pipe with two handles for LEG REST, LLDP Rotomoulded seat with inbuilt bolts 3/8" X 1.5" for FOOT REST & SEAT REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge
od271828/2023_2024 : CYCLE :Providing and fixing Cycle - FPSPCL208 (Make FUN PLAY )using, 25 NB & 40 NB GI B-class Pipe for MAIN FRAME, 32 NB GI B-CLASS Pipe for SEAT FRAME, 25 NB GI B-CLASS Pipe for HANDLE FRAME, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge
od271829/2023_2024 : Providing and fixing Pendulum -FNF012 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe for MAIN FRAME, Minimum 40 NB GI B-CLASS Pipe for LEG FRAME, Minimum 25 NB & 32 NB GI B-CLASS Pipe for HANDLE FRAME, LLDP Rotomoulded seat with inbuilt bolts 3/8" X 1.5" for FOOT REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge
od271830/2023_2024 : ABB TRAINER- Providing and fixing ABB Trainer - FNF 017 (Make FUN PLAY )using, Minimum 80 NB GI B-class Pipe for MAIN FRAME, Minimum 32 NB GI B-class Pipe for SIDE FRAME, Minimum 25 NB G.I. PIPES for INTERMEDIATE PIPE, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge- As per quotation
od271831/2023_2024 : TAI CHI CUM TWISTER- Providing and fixing Tai chi cum twister - FNF 021 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe for MAIN FRAME, Minimum 32 NB GI B-CLASS Pipe for HANDLE FRAME, LLDP rotomoulding wheel for SPINNING RING, Minimum 80 NB GI B-CLASS Pipe for TWISTER STAND, 25 NB GI B-CLASS Pipe for TWISTER HANDLE FRAME, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge
od271832/2023_2024 : CHEST PRESS CUM SHOULDER PRESS- Providing and fixing Chest press cum shoulder press - FNF 016 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe for CENTER FRAME, Minimum 40 NB & 32 NB GI B-CLASS Pipe for MAIN FRAME, Minimum 32 NB & 25 NB GI B-CLASS Pipe for HANDLE FRAME, Minimum 32 NB & 25 NB & 40 NB GI BCLASS Pipe for CONNECTING PIPE, LLDP Rotomoulded seat with inbuilt bolts 3/8" X 1.5" for SEAT & BACK REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge
od272370/2023_2024 : LEG EXTENTION - Providing and fixing Leg extention - FNF 020 (Make FUN PLAY )using, Minimum 100 NB G.I. C CLASS pipes for MAIN FRAME, Minimum 40 NB G.I. pipe for FOOT REST PIPE, Minimum 40NB & 25 NB G.I. pipe for HANDLE, Minimum 25 NB & 40 NB GI B-CLASS Pipe for CONNECTING PIPE, LLDP Rotomoulded seat with inbuilt bolts 3/8" X 1.5" for FOOT REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge
od271836/2023_2024 : CABLING - Supply, laying and clamping of 1 no. PVC insulated and PVC sheathed armoured aluminium power cable, 1.1 KV grade of the following sizes using clamps noted along with the cables, spacing of clamps not exceeding 60cms, making good the damages , colour washing etc. as required - 4 core 10 sq mm with factory made clamp and 25mm PVC pipe
od271837/2023_2024 : Supplying and fixing machine finished granite stone sitting bench of 1.5 m length, slab thickness not less than 50 mm, 450 mm clear height from ground level, 450 mm wide sitting slab, 450 mm wide back rest including cost of conveying, loading, unloading,material and labour charges etc. complete as per the direction of departmental officers.
od271850/2023_2024 : Supply, conveyance, installation, testing and commissioning of 3.00 mtr long factory fabricated Pole suitable for Post top Light Fixtures.(Philips)
od271862/2023_2024 : Supply, conveyance, installation, testing and commissioning of Post Top type pre-wired pressure die cast aluminium Dark Grey IP 65 protection type light fitting complete with all accessories and lamps etc. in the existing GI pipe and giving connection etc. as required. (Crompton LPTO-40/CDL)
od272372/2023_2024 : Supplying and fixing outdor Pedestal type Feederpillar meter box made out of 16 gauge powder coated sheet with clear coat, fitted with 25 A 2P MCB Isolator ( 1no) , 32 A Fuse with HRC ( 1NO) 25A 2P 30 MA RCCB (1 no) MNX 9 2P contractor (1 no), 10 A SP MCB (3 no) , etc all complete as per the direction of Engineer in charge
od271866/2023_2024 : Providing and fixing Entrance pergola using Natural stone (SHELL WHITE) using, granite stone (Smooth finish) 15X15X240cm - 4 nos for Pergola Pillars, granite stone (Smooth finish) 240X7.5X15cm - 2 nos for Pergola Beams, granite stone (Smooth finish) 240X5X15cm - 6nos for Pergola Rafters including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge
od271886/2023_2024 : Designing and Fixing Inauguration/signage Board including cost of board, lettering, fixing, conveying etc all complete As per the Direction Of Departmental officers
EXCLUSIVE OF GST
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
GLOBAL CONSTRUCTIONS
SABANI ENGINEERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .