Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LQualified SHOP NO 1 HOPE TOWN VILLAGE PHANIGHAT NEAR PHANIGHAT JETTY SOUTH ANDAMAN ANDAMAN NICOBAR 744107 UDYAM AN 01 0009045 35DDFPR1399N1ZS B R | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744107 | L1 | Qualified MSE, Category: General | |
| 2 | L2₹5.2 L+₹56,255 (12.1%)Qualified 03 PICOLO HOTEL RANCHI PATNA ROAD JHUMRI TELAIYA RANCHI PATNA ROAD KODERMA JHARKHAND 825409 | KODERMA | JHARKHAND | 825409 | L2 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
22 Jan 2025, 5:00 pmClosed
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H076 Flag locker at flag deck is deteriorated and perished Flag locker is required for maintaining the flags for use at flag deck Same may be renewed Qty 01 N..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H077 Rubber Cushion of RIB cradle deteriorated uprooted Rubber cushion for RIB cradle is required for safe guard and safe stowage of RIB positioned on cradle ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H078 Anchor capstan turning handle rusted perished and broken from handle and edges Turning handle is required for brake operations of anchor Same may be rene..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H079 Sink coupling of EPs bathroomPort deteriorated and found leaking Same may be renewed Repaired Qty 01 No Mat SS; Service Provider
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H080 Upper deck fire hose box deteriorated and perished due to sunlight and rough sea conditions Fire hose boxes on upper deck are required for safe keeping o..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H081 Wooden gratings for upper decks are deteriorated and perished Qty 02 Nos Mat wood; Service Provider
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H082 Arm rest of captains chair in bridge got uprooted during deployment at sea during high sea state adverse weather Same maybe repairedQty 01 no mat Alumin..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H083 The Commanding Officers name plate not updated Same to be updatedQty 01 No Mat Brass; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H084 Stair case cover onboard are to be covered with rubber Stair case rubber foot steps with bolted aluminum beading are required to avoid any slipping of p..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H085 Wardroom Captains cabin key board deteriorated and required fabrication of wire mesh of keyboard Keyboard are essential part of ship for safe keep main..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H086 DG Indian Coast Guard Director General Paramesh Sivamani PTM TMPhoto may be fabricated in ward roomQty 01 No MatPhoto Frame; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H087 Fire Plan pipe deteriorated Fire Plan pipe is required for keep of GD diagram required during DC FF situations Same may be replaced Qty 03 Nos Mat Alumi..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H088 Magazine locking arrangement is loosened and additional locking arrangement may be provided Presently Magazine is having only one locking arrangement wh..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H089 Mesh of water jet guard Deteriorated uprooted Mesh for water Jet is required for embarkation of men and material at certain occasion and for maintenance.. Bid Details 2/19
7267978
GEM/2024/B/5723677
Two Packet Bid
Repair
South Andamans, Andaman And Nicobar Islands
Total value wise evaluation
SERVICE
4 documents required · 4 mandatory
1 yrs
₹3
Exempted
15 Jan 2025
15 Jan 2025
22 Jan 2025
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H076 Flag locker at flag deck is deteriorated and perished Flag locker is required for maintaining the flags for use at flag deck Same may be renewed Qty 01 N..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H077 Rubber Cushion of RIB cradle deteriorated uprooted Rubber cushion for RIB cradle is required for safe guard and safe stowage of RIB positioned on cradle ..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H078 Anchor capstan turning handle rusted perished and broken from handle and edges Turning handle is required for brake operations of anchor Same may be rene..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H079 Sink coupling of EPs bathroomPort deteriorated and found leaking Same may be renewed Repaired Qty 01 No Mat SS; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H080 Upper deck fire hose box deteriorated and perished due to sunlight and rough sea conditions Fire hose boxes on upper deck are required for safe keeping o..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H081 Wooden gratings for upper decks are deteriorated and perished Qty 02 Nos Mat wood; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H082 Arm rest of captains chair in bridge got uprooted during deployment at sea during high sea state adverse weather Same maybe repairedQty 01 no mat Alumin..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H083 The Commanding Officers name plate not updated Same to be updatedQty 01 No Mat Brass; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H084 Stair case cover onboard are to be covered with rubber Stair case rubber foot steps with bolted aluminum beading are required to avoid any slipping of p..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H085 Wardroom Captains cabin key board deteriorated and required fabrication of wire mesh of keyboard Keyboard are essential part of ship for safe keep main..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H086 DG Indian Coast Guard Director General Paramesh Sivamani PTM TMPhoto may be fabricated in ward roomQty 01 No MatPhoto Frame; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H087 Fire Plan pipe deteriorated Fire Plan pipe is required for keep of GD diagram required during DC FF situations Same may be replaced Qty 03 Nos Mat Alumi..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C414; H088 Magazine locking arrangement is loosened and additional locking arrangement may be provided Presently Magazine is having only one locking arrangement wh..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C414; H089 Mesh of water jet guard Deteriorated uprooted Mesh for water Jet is required for embarkation of men and material at certain occasion and for maintenance.. Bid Details 2/19
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7267978.pdf
GEM_BID
1734517010.pdf
OTHER
1734517049.pdf
OTHER
atc_23887ac0-97bc-4e53-85d01734517081050_DTO14.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .