| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC Loiwest | |
| 2 | lL2₹5.5 LRejected-AOC NO 10 544 THANEERPANTHAL KANNADI KINASSERY 678701 | KINASSERY | PALAKKAD | KERALA | 678701 | lL2 | Rejected-AOC high |
| Sl No | Description | Qty | Unit | SAI ENGINEERING L2 | BINIL S O L1 |
|---|---|---|---|---|---|
| 1.00Cleaning of work site, dismantling the old structures, demolishing the existing civil structure and providing concrete for fixing new embedded parts etc. | |||||
| 1.00 | OD1072/2023-2024:Clearing grass from banks of canal and removal of silt, zoological waste and other debris from canal bed including removal of the rubbish up to a distance of 50 m outside the periphery of the
area cleared. | 6 | Day | 2,060 ₹12,360 | 2,056 ₹12,336 Lowest |
| 1.00 | OD1073/2023-2024:Taking out of shutter from the grooves after dissembling from the old hoisting mechanism and placing safely on nearby suitable place not more than 50m from the site, then hooking it back into grooves after completing works on shutter and embedded parts as per direction of deptl officer at site including cost of all labour, conveyance charges, all lead and lift etc. | 2 | set | 9,500 ₹19,000 | 9,320 ₹18,640 Lowest |
| 1.00 | OD1074/2023-2024:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embedded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery, labour etc. complete as directed by the departmental officer at the site.(Weight of the unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting units as 80 % ) | 306.28 | kg | 4.2 ₹1,286.37 Lowest | 4.6 ₹1,408.88 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.33 | cum | 3,450 ₹4,574.7 | 3,301 ₹4,377.13 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 12.28 | sqm | 950 ₹11,666 | 906.7 ₹11,134.28 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.8 | cum | 9,950 ₹17,870.2 | 9,429.4 ₹16,935.2 Lowest |
| 1.01 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 1.16 | cum | 9,250 ₹10,757.75 | 8,775 ₹10,205.33 Lowest |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 14.3 | sqm | 325 ₹4,647.5 | 309 ₹4,418.7 Lowest |
| 1.01 | OD1090/2023-2024:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges | 1,073.25 | kg | 86.3 ₹92,621.65 | 85.7 ₹91,977.7 Lowest |
Tender Value
₹5.8 L
EMD Value
₹14,613
Closing Date
11 Aug 2026, 4:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, Mechanical Sub division Thenmala
GENERAL-KIP(LB)-Patch work, painting and erection of Appuppankavu Cross and Flush shutters (2nos) and providing new hoisting mechanisms at Ch 12100m of Paravoor branch canal.-General Mechanical Work
2026_Irrig_863024_1
IRR/MH/TR/8142/2022_16_32_31/1
Open Tender
Repair and Maintenance Works
Item Rate
180 days
Kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,290
Yes
₹14,613
Yes
10 Sept 2026
29 Jul 2026
13 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
29 Jul 2026 - 11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning of work site, dismantling the old structures, demolishing the existing civil structure and providing concrete for fixing new embedded parts etc. | |||||
| 1.001 | OD1072/2023-2024:Clearing grass from banks of canal and removal of silt, zoological waste and other debris from canal bed including removal of the rubbish up to a distance of 50 m outside the periphery of the
area cleared. | - | Day | - | - |
| 1.002 | OD1073/2023-2024:Taking out of shutter from the grooves after dissembling from the old hoisting mechanism and placing safely on nearby suitable place not more than 50m from the site, then hooking it back into grooves after completing works on shutter and embedded parts as per direction of deptl officer at site including cost of all labour, conveyance charges, all lead and lift etc. | - | set | - | - |
| 1.003 | OD1074/2023-2024:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embedded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery, labour etc. complete as directed by the departmental officer at the site.(Weight of the unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting units as 80 % ) | 0.2 | kg | - | - |
| 1.004 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.005 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | - | - |
| 1.006 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.007 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.008 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | - | sqm | - | - |
| 1.009 | OD1090/2023-2024:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges | 0.8 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1459788.xls
BOQ • 0.32 MB
BD.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .