Loading…
Loading…
Tender ID
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
17 Mar 2026, 6:00 pmClosed
ADD CITY ENGINEER , SOUTH ZONE
Providing and Laying upgration Drainage Line 450 mm work at alifnagar tran rasta to akruti bor lambha ward south zone.(reinvite)
284308
E TENDER NOTICE 19/2025-26 TENDER NO 743
Open
Civil - All
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹25,000
9 Mar 2026
9 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
TENDER DOCUMENT FOR :- Providing and Laying upgration Drainage Line 450 mm
work at alifnagartran rasta to akrutiborlambha ward south zone.(reinvite)
E-Tender Notice –19-2025/26 Tender no-743
TENDER DOCUMENT
Volume -1 General Conditions & Technical Specification
Volume -2 Price Bid
Dy. Municipal Commissioner
Ahmedabad Municipal Corporation.
South Zone Zonal Office ,Maninagar,
AHMEDABAD – 380
AHMEDABAD MUNICIPAL CORPORATION
TENDER DOCUMENT FOR :- Providing and Laying upgration Drainage Line 450 mm
work at alifnagartran rasta to akrutiborlambha ward south zone.(reinvited)
TENDER DOCUMENT
General Conditions &Technical Specification
Dy. Municipal Commissioner
Ahmedabad Municipal Corporation.
South Zone Zonal Office ,Maninagar,
AHMEDABAD – 380
AHMEDABAD MUNICIPAL CORPORATION
TENDER DOCUMENTS CONTENTS
General Conditions &Technical Specification
SECTION DESCRIPTION
I NOTICE INVITING E-Tender Notice – 19-2025/26
II Memorandum of Work
III Invitation For Bids (IFB)
IV Terms & Condition
VI Technical Specification
VII Form of BID
LAST DATE OF ONLINE SUBMISSION OF :-17/03/2026 up to 18.00 Hrs.
PRICE BID OF TENDER
LAST DATE OF PHYSICAL SUBMISSION :-18/03/2026 Up to 16.00 Hrs.
OF TENDER (Encloses as asked)
TENDER OPENING DATE :- To be intimated after technical bid eveluation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of Ahmedabad Municipal Corporation
invites percentage rate sealed tenders from interested contractors forthe following work at different
locations within the limit of SOUTH ZONE A.M.C.
1 Name of work Providing and Laying upgration Drainage Line 450 mm
work at alifnagartran rasta to akrutiborlambha ward south
zone.(reinvited)
2 Tender Amount Rs.25,00,000.00(exclusive of GST). GST will be paid
(Estimate put to Tender) extra by AMC/Authority at prevailing rate to the
3 Tender fee Rs.900.00Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
4 Time Limit 12 MONTHS
5 Download of Tender Complete bid documents can be downloaded with effect from As Per
Documents NIT. from the website www.nprocure.com.
6 Required registration Register “E1” class in AMC or PWD in Govt. R&B/CPWD/AMC or
equivalent register with any other state Govt. or institutions.
7 Earnest Money Deposit Rs.25000.00(Demand Draft or pay order or Bank Guarantee in favor
(Bid security) of Municipal Commissioner, AHMEDABAD/) To be submitted as
(1 % of Estimate put to prescribed in 8.0 below. Demand Draft or Bank Guarantee shall be
tender) from Nationalized Bank / Scheduled Bank and valid for 120 days.(As
per AMC finance dept. circular No-5 Dt.5/5/07 & F.D. Circular No.
Dt. 7/08/2010) & attached ANNEXURE - 1 finance dept. circular No -
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Ahmedabad Municipal Corporation.South Zone Zonal Office
,Maninagar,AHMEDABAD – 380
9 Mode of sending the •
Price bid should be submitted by online e-tender only and
Tender Documents Technical bid should be submitted physically also in sealed
envelope systems By RPAD/Speed post/ Hand Delivery in sealed
covers in Duplicate (One Original & One Duplicate) Each part
shall be separately duly sign & seal by contractor .
10 Last date of online As Per NIT
submission of tender
11 Submission of Price Bid As Per NIT
12 Opening of Technical bid As Per NIT
13 Tender validity period 120 days from the last date of submission of Tender. it should be valid
for 180 days from the last date of online tender submission.
14 Security Deposit 5 % of Contract Value to be submitted in the form of Bank Guarantee
as per. Bank Guarantee shall be from approved list of AMC of banks
and the issuing branch of bank guarantee shall be of Amdavad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work. The Security Deposit shall
be payable in 15 days from date of receipt of LOI failing which interest
@4% per annum will be charged by AMC.
15 Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
a. Labour welfare cess 1% Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Place of Arbitration Ahmedabad
17 Language of Arbitration English
18 Terms, Condition &
All General condition of contract of FORM B1 condition of contract
Specification shall be applicable.
19 Compensation for delay 10% Of Remaining work (As per Circular)
21 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of
Tender AndThe Same As to be Attached Along WithThe Tender
22 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
23 Quality Assurance Plan As per circular contractor have to submmit Quality Assurance Plan
and do necessary test as require, no extra payment given for material
24 GST GST will be paid extra by AMC/Authority at prevailing rate to the
25 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or
parts of work major part of any amount, the contractor shall be bound to start the
work within 48 hours so intimation of work. Communication done
telephonically via SMS, via whatsapp and through letter/ E-mail shall
be considered legal and binding for the same. Failure of company to
start the works in 48 hours of intimation as above by contractor. the
contractor shall be levied penalty of (1) Rs.1000/- per day (for tender
amounting upto 10 lakh). (2) Rs. 2500/- per day (for tender
amounting above 10 lakh to 30 lakh). (3) Rs. 5000/- per day (for all
tender amounting above 30 lakh). Three time failure by contractor
shall make contractor responsible to be debar unless and otherwise
justified properly in writing/binding within 15 days so flast notice of
26 During execution of works in any case if any fatal accident (major or minor) occurs due to poor work
and poor safety precautions, then it will be completely contractor’s responsibility and compensation
for the same has to be paid by contractor. During execution of works if any news is published in
print/Electronic/Social media regarding inferior quality of work and poor safety precautions, and
due to inferior quality work any fatal injuries occurs, all the losses due to such accidents and
expenses of legal matters shall be borne by contractor.
• All the circulars which were published by Authorities of AMC time by time will be
applicable on said Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the
rights to reject any or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory.
Incaseauthorized signatory holding Power of Attorney and Digital Signatory are not
thesame, the bid shall be considered non-responsive.
Seal and Signature of the Bidder Add.City Engineer (SOUTH ZONE)
Date: Ahmedabad Municipal Corporation
Finance dept. circular No- 38 Dt.21/11/2022
Seal and Signature of the Bidder Add. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( hereinafter called “the Employer”) invites
sealed Tender document from reputed and qualified bidders for the construction of Works detailed
in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No. value of works Money Period
(Rs.) Deposit (Rs.)
1 Providing and Laying Rs. 25,00,000.00 Rs.25000.00 12- MONTHS
upgration Drainage Line
alifnagartran rasta to
akrutiborlambha ward
south zone.(reinvited)
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.Tin the form of Demand
Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad, which shall be non refundable. The Details of Tender fees
shall be submit with scan copy at the time of Quoting price bid of the tender and Physically
to be submitted along with technical bid Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works
in the above Table payable at Ahmedabad and drawn in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to
be specified in Clause 2 of Financial Condition.
5.Physical submission must be delivered to Asst. Manager (Admin) SOUTH ZONE, Rajiv Gandhi
Bhavan, Memco – Naroda Road, AhmedabadAs per N.I.T
6.The Bids will be opened on As per N.I.Tat the office of Dy.City Engineer (S/Z) ,Ahmedabad
Municipal Corporation. South Zone Zonal Office ,Maninagar, AHMEDABAD – 380
in the presence of bidders or their representatives who choose to attend. In the event of the
specified date of bid submission/opening being declared a holiday for the Employer, the bids
shall be received /opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FEATURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as per
N.I.T and all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/
Speed Post/ Hand Delivery in duplicate. This envelope shall be sealed in an outer envelope. The
Bid envelopes shall be marked as follows:-
Tender Document Vol.
Registration certificate of class
Power of Attorney
Personal Details
Enclosures as asked in tender
Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, SOUTH ZONE,
Ahmedabad Municipal Corporation. South Zone Zonal Office ,Maninagar, AHMEDABAD
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Form
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures
then announce the names of bidders in the presence of bidders or their representatives who
choose to attend on the date and time mentioned in the IFB. In the event of specified date of bid
opening being declared as a holiday for the Employer, the Tender will be opened at the
appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD, the
amount and validity of EMD furnished with each bid, is valid registration and such other
details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the
Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD,
the bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified
in the bid documents and is substantially responsive to the requirement of the bidding
documents and provides any clarification for ascertaining the correctness of the
information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
Including the information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing their
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and
will not subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to
be substantially responsive in accordance with Clause 2and qualified for award of Contract in
accordance with Clause 5(General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date
and time. In the event of specified date of bid opening being declared bidders who qualify the
criteria then bidder bid will be considered for opening of price bid.(Following clause no. 5 of
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated
Bid Price, provided that such bidder has been determined to be (i) eligible in accordance with
the provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with
the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will
notify the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7.Asper City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful Bidder
has to deposit security deposit / Bank Guarantee with in 15 days after receiving letter of
Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished
by him in his bid. Such request by the Employer and the response by bidder shall be in writing
or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid
from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has
been announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain
for itself on its own responsibility all information that may be necessary for preparing the bid
and entering into a contract for construction of the Works. The costs of visiting the Site shall be
at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to
enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer
and its personnel and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
vhevºt lk-28 <&t ltKktFt<t vhevºtlk 31,32 <t.7/7/2017 îtht<t.1/7/2017
vAecnthvtzJtbtytJuj /ytJlthxuLzhbt (bxehegÕm + juchmÃjtgmt&u)
G.S.TltltuxeVefuNlbwscG.S.Tsgtjtdwvz<tuntugðgtmœhnwftbltcezhuG.S.TltuxeVefuNlbwscleyuÃjefu
cujexeægtlbthtFexuLzhlwkcezekdfhJtlwhnuNu.
Seal and Signature of the Bidder Add.City Engineer
Date: (SOUTH ZONE)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to as
"the Works") detailed in the table given in the IFB.
1.2 The Works consist of:
Providing and Laying upgration Drainage Line 450 mm work at alifnagartran rasta to
akrutiborlambha ward south zone.(reinvite)
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the
following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for Required class and
or equivalent with specialization in road works. If contractor is not registered with AMC in
the relevant class, on award of contract he shall be required to register himself with AMC
within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as
the Employer shall reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction
of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regardinglitigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of
the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a
joint venture. A bidder who submits or participates in more than one bid for a contract package will
be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
16, bids which are not substantially responsive to the requirements of the bidding documents will be
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder
and the Employer shall be written in the English language. Supporting documents and printed
literature furnished by the bidder may be in another language provided they are accompanied by an
accurate translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in
figures and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer
may request the bidders to extend the period of validity for a specified additional period. The
request and the responses thereto shall be made in writing or by fax. A bidder may refuse the
request without forfeiting his bid security. A bidder agreeing to the request will not be
required or permitted to modify his bid but will be required to extend the validity of his Bid
Security for the period of the extension, and in compliance with Clause 2 ( Financial Terms
& Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and
date specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a
date determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of
original and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in competing for the contract in
question. The Employer will declare the firm ineligible, either indefinitely or for a stated period
of time, to be awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at
any time determines that the firm has engaged in corrupt or fraudulent practices in competing
for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those close
to them, or induce others to do so, by misusing the position in which they are placed,
and it includes the offering, giving, receiving, or soliciting of anything of value to
influence the action of any such official in the procurement process or in contract
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the Borrower,
and includes collusive practice among bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable
for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria it
will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect
or are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such
laws shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary
florescent marking on traffic signs to be provided so that it should be visible at night. During
night working hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site Including traffic signages, safety cones, traffic
blinkers, barricading tapes, red and green flags etc for making easy smooth and safe
conditions for the traffic. The Contractor shall and must provide above at his own cost.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or
new connection on behalf of AMC. It includes filling the necessary application to power Supply
Company, follow up and getting the supply, filling the necessary test reports to the power
supply company. All official fees Including security deposits and other expenses shall be of
initially paid by the contractor.
Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder Add. City Engineer
Date: (SOUTH ZONE)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINANCIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments Including advances, if any, shall be made in Indian Rupees.
2.Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall
be valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as
promptly as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned
when the bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) furnish the required Performance Security or
ii) sign the Agreement.
3.(A) SecurityDeposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance, the successful
bidder shall deliver to the Employer, a Initial Security Deposit in the form of a Bank
Guarantee for an amount equivalent to 5% (five percent) of the Contract Price .
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee
as per format shall be issued from any Nationalized or RBI approved foreign bank having net
worth of more than Rs.500 Crore of Indian Operation and acceptable to Employer.
(C) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
4. Approved Bank: - As per AMC finance Department Circular
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for
8. Penalty: - Compensation for (0.10%) zero point one percentage of Delay contract price for
uncompleted work per day subject to a maximum up to ten percentage of contract price or as
decided by Municipal Commissioner.
9.Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on
material procurement or any other component for the works from any source shall be borne by
the contractors.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or
for any other cause as of the date 28 days prior to the deadline for submission of the bids, shall
be included in the rates and prices and the total bid price submitted by the bidder and the
evaluation and comparison of bids by the Employer shall be made accordingly.
10. Qualification of the Bidder
10.1 Experience of bidder
Experience of having successfully completed similar works during last 7 years ending last day of
month previous to the one in which applications are invited should be either of the following.
• Three similar completed works costing not less than the amount equal to 40% of the estimate put to
• Two similar completed works costing not less than the amount equal to 50% of the estimate put to
• One similar completed works costing not less than the amount equal to 60% of the estimate put to
Work Completion:
1. For work completion, the bidder has to submit Certificate 3 (A) from their respective
employers. Those works which are not supported by the Certificate 3(A) shall not be
considered as completed work.
2. Work completed by the bidder with Government / Semi Government under the name
of the bidder them self shall be considered for evaluation.
3. Work Completion means completed works only. If the work is in progress and Some percentage
of the work is completed, th e bidder can not consider that amount into the
work completed. For example, for the project Rs. 10.00 Crore if the work is completed
1.50 Cr., then the bidder can not submit the work completion of Rs. 1.50 Cr. for
eligibility of this tender.
4. Works done under Sublet and / or Joint Venture shall not be considered for evaluation
purpose anyhow.
Bidders shall provide such evidence of their continued eligibility satisfactory to theEmployer,
as the Employer shall reasonably request.
Seal and Signature of the Bidder Add.City Engineer
Date: (SOUTH ZONE)
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of
Gujarat State Road and Building Department / Water Resources Department shall be
applicable. Binding on the contractors unless specifically mentioned about it hereunder in
clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of
Gujarat “wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State
Public Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer
wherever written.
05. “Ahmedabad Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Ahmedabad
Municipal Corporation”
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading
“NOTICE INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work
of“Providing and Laying upgration Drainage Line 450 mm work at alifnagartran rasta to
akrutiborlambha ward south zone.
OF AHMEDABAD CITY Point No.3 : The class of contractor shall be as per
Memorandum of Works in Brief.
The Cl. No. 14.2, 21, 38, 60, 743, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as
Point No .2.1 may be read as per the details mentioned in the tender notice
10. DECLARATION FORM & DECLARATION CERTIFICATE are given separately in
Tender Document and it shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSEunder the
heading “TERMS AND CONDITION OF CONTRACT” shall be read as under-
Clause 1: Security Deposit: to be read as per the details given separately
elsewhere in the tender documents.
Clause 2: Liquidated Damages for delay: to be read as per the details given
separately elsewhere in the tender documents.
14. Clause No. 14.2, 21, 38, 60, 743, 73, 74, 75 shall be read as deleted in the form B-1.
Seal and Signature of the Bidder Dy.City Engineer
Date: (SOUTH ZONE)
AHEMDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to
that letter, contractor shall have to arrange for Security Deposit within 15 days. If S.D is
given within 10days of issuance of Letter of Intent, time limit shall be counted from that
date. If S.D is given after 15 days of issuance of letter of intent, contractor shall be finned
Rs. 200/- per day of delay and shall be deducted from contractor’s bill. In this case time
limit shall start latest by the 10th day of letter of intent, Security Deposit of 5% of tender
amount shall be deposited by pay order, demand draft, cheque of nationalized bank
/scheduled bank by pay order, demand draft, cheque of nationalized bank/scheduled bank
only. Contractor shall have to sign contract paper with AMC.
2. In case of earnest money cheque bounce back, contractor’s tender shall treated as
cancelled and the contractor shall not be given any tender, offer, quotation work in AMC
3. Conditional tender shall not be accepted
4. Tender validity period is 120 days from the date of opening of tender
5. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at
which tender to be accepted and awarded.
6. Specification of tender items shall be as per PWD manual in general/AMC’s norms and B-1
form conditions shall be applicable. In case of controversy, Add.C.E’s decision shall be final.
7. Contractor shall have to deposit Earnest Money deposit with tender.
8. Work shall be allotted as per contractors registration class.
9. Contractor shall have to work in such a system that there shall be no damage to any
service line of electric, telephone, gas, any type of service cable ,drainage or water lines
etc. In case of damage to service line, the whole responsibility of accident shall be on
contractor’s shoulder. It will be responsibility of contractor to safe guard the labours
against any accident or damage of lives. In case of police complain, Contractor shall be held
responsible for negligence. In case of soil /land collapse, contractor shall be held
responsible for not supporting the soil suffering with strutting, shuttering Contractor shall
safeguard the labour before allowing the labour to enter in excavated or other site. In case
of accident to labours, contractor shall be held responsible for police complain against him.
AMC’s staff shall be responsible for any accident at the site of the work.
10. Contractor shall take insurance of his all labour. and supervisory staff
11. Only registered contractor shall quote the tender , If the contractor is registered with
government then they shall have to apply to registration in AMC within 90 days from the
date of work order.
12. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is put
up on AMC’s web site.
13. Payment of running bill , final bill shall be as per policy of AMC in force at time of payment
14. Any time of litigation shall be in court of AMDAVAD city jurisdiction only.
15. As per site conditions/requirement of site, there shall be increase or decrease in tender
item quantities. In such case contractor shall not have right to any price rise. In case of
decrease in any tender item quantity, contractor shall not ask for compensation.
16. If any construction material brought to site by contractor , is not as per specification, or
any inferior quality material brought to site, then such rejected material shall be removed
from the site within 24 hours, otherwise AMC can throw away such material at any place
and recover the amount for such removal work from contractor bill. In this case contractor
shall not be entitled for compensation.
17. Cost of testing of material shall be done by the contractor. He shall provide vehicle for
taking material/staff from site to testing laboratory/ manufacturing site and contractor
shall be bear the cost of transportation of staff and material.
18. Contractor shall work as per labour Act. Contractor shall not be given any payment if
labour act rules are not followed or insurance of labour is not taken for work
19. Contractor shall deposit the material on site in such a way that it should not become
obstruction to any one in any way
20. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
21. If asked by AMC Engineering staff, contractor shall take photograph of site of work/before
start of work, during work and after the completion of work, with digital camera and
deposit to AMC office or transfer photograph from camera to AMC computer. No
additional cost shall be paid.
22. In case of cancellation/rejection of tender, contractor shall not be entitled
foranycompensationOr right
23. In case of extra item, rate shall be taken from SOR of the year of tender preparation. If
item is not available in SOR, then market rate shall be derived by the Eng. dept by rate
analysis. Contractor shall not ask for the rates as per his rate analysis. This should be clearly
understood and taken in to consideration while quoting the tender by the contractor.
24. During execution of work, contractor shall take safety measures like protection by ropes,
drums, danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement
& instruction of Engg.- in- charge. In case of accident due to lack of protection, contractor
shall responsible for police complains, compensation etc AMC staff shall not be held
responsible for contractors negligency.
25. If instructed by AMC officials, contractor shall have to keep daily progress register and get
is signed by Ass. city Engineer. Contractor shall maintain record of daily No. of labours,
employed, work done, rectification work carried out by contractor after Eng.-in-charge
inspection & the compliance of the same. If such rectification work is not done by
contractor within 24 days the contractor shall be finned Rs. 250/- day of delay & shall be
recovered from the contractors bill
26. Contractor is not entitled for any type of compensation or right for the cancellation of
tender or tender items by any means.
27. If work is not completed within specified time limit penalty shall be recovered from bills as
per tender condition.
28. Deduction from bills shall be done as per rules prevailing or the rules which shall come in
to force, by State or Central Govt.
29. 1% amount shall be deducted for labour welfare fund as per state Govt order.
30. Quantity in item is tentative. It is likely to be change.(increase or decrease) as per site
requirement during execution of work.
31. All above conditions shall over rule the conditions given in Form B-1
32. Contractor shall have to register the work as per labour act & as per building safety act,
1906 with ,Dy.Director building safety act, Shram bhavan, 5th floor labour commissioner
office, Khanpur, AMDAVAD.
33. Befor quoting tender, contractor shall have to take complete information of the work after
seeing site and from the concerned Asst. Engineer or Asst. city engineer.
34. In case of the bank detail are not given then EMD return procedure shall be delayed.
35. Before quoting the tender contractor should know that, he has seen the site & understood
the item of works, site conditions. He should be in a position to provide labours at the time
of festivals like Holi, Diwali, Navratri, Marriage season, rainy season or any other time of
the year Contractor can not say that he has no labours due to festivals.
36. In case progress is delayed, contractor shall be penalized 0.10% of Tender amount per
day for work done after time limit, maximum up to 10% for remaining value of work.
37. As per Cicular No- 41 Dt.09.11.2021 E Form Certificate Required.
38. Contractor has to follow Finance Circular NO-38, Date:- 21.11.2022
39. As per AMC’s Finance department Crcular No.38, Dt.21/11/022 and approval of
competent authority, rate of all the items are taken without GST and prevailing GST
will be payable Seperately..
40. All the relevant prevailing AMC circulars/ itstime to time revisions are applicable for
this work and all the bidders are bound to follow the same, so the bidder must check
before applying for the tender.
I have read all above conditions carefully and ready to work as per above conditions.
Seal and Signature of the Bidder Add. City Engineer
Date: (SOUTH ZONE)
ybœtJtœBgwrlrmvjftuvtuohuNl
œrûtKÍtulxuLzhltuxemlk- 14/2025-26xuLzh lk-
743btkytJhejuJtgujftbtulerJd<tubtxulwkxftJtheœhJt¤wkxuLzhyluftuLx[tfxxuLzhhbtxule Nh<tuu
1 xuLzhhlejtgft<
1 y: ytxuLzhsu<u Jdolty.Bgw.ftuy&JtfuL÷ y&JthtsgmhfthlebtLggtœeltftuLx[fxhtu Che NfNu.
dJobuLxltbtLgftuLx[[tfxhuy.Bgw.ftuvtuo.btkbtLgftuLx[[tfxhtulegtœebtkkhSMxu[NlfhtJJtlwkhnuNu.
1 c: btLg ©uKeltftuLx[tfxh<hefultuk^Keltkk «btKvºtleMJ«btKe<fhujlfjxuLzhmt&ustuzJtlehnuNu.
1 f: ftbsJtcœthxuLzhh<ubssuxuLzhhmwaJujftuLx[tfxhle ©uKeytJ<t
ntug<ubsftbfhJtmûtbntug<ublusytvJtbtkkytJNu. ftbyvt<t
vnujtftuLx[tfxhuftbmkk<tu»tfthf<ubsxtRbjebexbtkkvwÁkfhJtsYhemJj<, ylwCJ, ûtb<t
yluVtgltLmegjhemtumohswfhJtlthnuNu.
1 z: ybœtJtœBgwrlrmvjctuzoXhtJlk - 3836,<t.25/11/2011 &e b¤ujbkswheylwmth<&t mexe.Rsluh mh¾gwjh,lk
-17, <t.09/12/2012 bwscybœtJtœBgwrlrmvjftuvtuohuNlbtkftuLx[t¾xh hSMx[uNl Ve, heLgwyj Ve <&t
yvd{uzuNl Ve ylubtvœkztuægtlbtkhtFe<u bwscybjfhJtltuhnuNu.
1 R: xuLzh Ch<t vnujtxuLzhhumtRxrlheûtKfhejuJwk. xuLzhhftblt «fth, ngt<hM<t, vtKebtdo,
mkkathyluJvhtNltceòhM<tytu&emkk<wÐntuJtlwkbtlejuJtbtkkytJNu. xuLzhhuftblumtRxylurcÕzekkd(fu suftbfhJt,
ftbvwhwkfhJt<&t ftbltbuRxulLmbtxucltJujntug).<ubsxuLzhhuytmtRxltftbbtxu, rcÕzekkdbtxu, gtzo,
zevtubtxulesøgtvtu<tle he<u bu¤JejuJtlehnuNu. (xuLzhlwkftbfhJt, ftbvwhwk fhJt<&t ftbltbuRxulLmbtxulesøgt)
2: ytftblembgbgtoœtbubtuhuLzbbtsKtJuj «btKu le hnuNu.
3: xuLzhJujezexervhegz( 120 ) rœJmmw^elehnuNu.
4: xuLzh Ve yluR.yub.ze.
4 y: xuLzh Ve zebtLzz[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhxuLzh Ve ChJtlehnuNu. xuLzh Ch<e JF<u
yluoMxbleChJtlehnuNu. ytuAehfblexuLzhVe,R.yub.ze fu xuLzh Ve, rJltltxuLzhtuhœct<j (fuLmj) dKtNu.
4 c: xuLzhmt&ubwfJtbtytJ<e yluoMxble, xuLzhlehfblt 1% «btKucukfduhkxe/zebtLzz[tVxMJefthJtbtkytJNu.
œhufxuLzhœeXyjdR.yub.zeChJtlehnuNu. R.yub.zehfb Yt.1 fhtuzmw^eleykœtS<hfbltftbbtxu htu¾zt,
zebtLzz[tVx, cukfduhkxeltMJYvbt<&t Yt. 1 fhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze le
hfbbtºtzebtLzz[tVx, vu ytuzoh fu cukfduxheltMJYvbtkytvJtlehnuNu. yLgftuR he<u ChujR.yub.ze.
btLghtFJtbtklnekytJuyluxuLzhhœct<j XhNu.
4 f: xuLzh Ve <&t R.yub.zelehfbltze.zevtA¤ ftuLx[tfxh©eyuvtu<tlemkM&tlwltb<&t
btuctRjlkchyluvtxeoftuzyJ~gjFJtltuhnuNu.
4 z: cukfduhkxebtºtybœtJtœNnuhle s MJefthJtbtytJNu.
4 R: ytuAehfblexuLzh Ve, R.yub.ze fu xuLzh Ve, rJltltxuLzhtuhœct<j (fuLmj) dKtNu.
5 y: xuLzhVtuboyluylwmwrabtkkleœhufuœhufFtjesøgtxuLzhChlthu Che xuLzh ztu¾gwbuLxm vh<fhJtlthnuNu.
5 c: fJhWvhxuLzhlkch<&t ftuLxufxlkchsYhMvМNtoJJtltu hnuNu.su ftuLx[tfxh©eytuyuhSMx[uNlheLgwfhJuj l ntug<u
ftuLx[txh©eyuxuLzhChJtlne.
5 f: ftuLx[ftxhtuyuxuLzhbtcukflwltb,Ft<t lkch ,btRfhlkch, mhltbw ,btu.lkch,vtxeoftuz
,RbuRjytRzeMvÐyûthtubtjFJw.
5 z: ytxuLzhtuzwÃjefuxftuveytumt&uCheluWvhtuf<mhltbuYcY/hSMxhyuze./MvezvtuMx/ fwheyh&e
rlg<mbgbgtoœtbtbtufjJtlthnuNu.mekdjxuLzhftuve/mnefgtoJdhleftuvehœfhJtbtytJNu.
6: ftuLx[tfxhtuyuleaulectc<tuft¤SvwJofJtkkaJtrJlkk<e Au.
1) J^w fu ytuAtlexftJtheltœhNçœtu<ubsytkkfztbtkkytvJt. xuLzhChlthuyt he<u cl<e
hfbvKFtltbtkltuk^JeyluhfbltufwjmhJt¤tubwfJtu.
2) ftuRfkkvlelultbuxuLzhjuJtbkktytÔgwkntug<tufk vle J<e
xuLzhvhmnefhlthÔgrf<luyr^f]<fh<wkbwFðgthltbwkxuLzhmt&uhswfhJtlwkhnuNu.
3) ftuLx[tfxhuRLfbxuûtmkkckr^<vtllkch<&t cukfzexuRjytvJtlehnuNu.
4) ftuLx[tfxhvtmuydtWltylwCJtykdult «btKvºttulelfjxuLzhmt&uhswfheNfNu.
5) xuLzh Nh<tuyluMvuNeVefuNl<&t CtJvºtfltœhufvtltylurJd<tuvhftuLx[tfxhumnefhJe.
6) <btbmw^tht, AufAtfyluDwkxujtjFtKvhftuLx[tfxhuxwkfemnefhJe.
7) xuLzhbtstuftuRmw^thtJ^thtntug<tu<u ykduxuLzh Ch<t
vnujtAuÕjuœeJmurlg<JucmtRxy&JtJtuzofauheyusYhe<vtmfhelu s xuLzhbtufjJw.
xuLzhChlthlusKtJJtbtkkytJu Au fu xuLzhœM<tJustultjFtKbtkftuRAufAtf fu VhuVthfhJtœuJtNulrnyluytJeftuRAufAtf fu
VuhVthjuJtNulrn, <ultkkjFtKbtkkftuRCwwjntug<tu<ult vh l Dwkx<t FtuxtjFtK fu ytkkfztvhAuftubthelu<ult mtawkjFtK
fu ytkkfztMvÐWfju<u he<u jFJt. «ðgufmw^thtvhxwk femnefhJe.
xuLzhhswfh<tkkvnujtFtmfheluxuLzhbtkœNtoJujmwaltytulwkvtjlfhJtbtkkytÔgwlrnntug<tuxuLzhybtLgdKJtbkktytJ
Nu<ule ltuk^ juJtrJlk<e Au. J¤eytVtubolwkbwFv]ƒyluftuLx[tfxhtultbtdoœNolbtxumtbtLgrlgbtu
ylumwaltytuvKft¤SvwJofJtkkaJtrJlkk<e Au.
ftuRvKfthKœNtoÔgtrmJtgftuRvK fu c^txuLzhtuyMJefthfhJtltunfyctr^<hnu Au.
xuLxhhuctujvtuWLxvulltcœjuNtneJt¤evul&eChujtxuLzh<whk< s ybtLgdKJtbktytJNu.
8 c: Wvhlectc<tuWvhtkk<xuLzhleaultmkkstudtubtkk<h<ybtLgXhJtluvtºt&Nu.
xuLzhChlth, rlg<ftby&Jtftbbtxubkswhfhujy&JtCtJvºtfltftuRftuzy&Jtvîr<y&JtrJd<tubtkkbwfuj
Nh<y&Jtmw^thtbtkkftuRVuhVthmwaJ<t ntug.
xuLzhlwkftuRvtlwk fu vtltftZeltkkÏgwk/ltkkÏgtntug fu cœÕgwk/cœÕgtntug.
c^tmw^thtJ^thty&JtatukxtzujeftvjeytuWvhxuLzhChlthuxwkfemne l fhentug.
xuLzhbtk<ubKuftuRAufAtffhentug, ylu
xuLzhChlthy&JtvuZelectc<btkkœhufCtdeœthy&Jt<u ykkdulwkbwFðgthltbwk ^htJlthÔgrf<mne l fhuy&JtxuLzhbt<u
btxuhtFJtbtkkytJujesøgtbtkkmne/mneytuWvhftuRmtûteyumtFfhe l ntug.
8 f: Nh<e xuLzhMJefthJtbtkytJNulne.
8 z: xuLzhMJefthJw ,hœfhJw, ftuluytvJwylufgtCtJ&eytvJw<u ykduBgwrl. frb§h©elturlKogytFhehnuNu.
ftuRfthKmhstuftuLx[tfxhluftb l ytveNftg<tu<u ykkduftuLx[tfxhftuRvK «fthltulwfNtle fu
J¤<hltunffœtJtufheNfNulrnfuftgœtfegftgoJtneytykkdu&RNfNulrn. xuLzhbkswh>ltuy&oftbytve s œuJtlwk Au
<uJtu&RNfNulrn.
8 R: xuLzhbtkftuLx[t¾xh îthtChujtCtJ<btb «fthltsu<u «J<o<t mhfthexuûtmrn<ltCtJdKJtbtkytJNu.
ylu<ubtkatjwftbœhBgtlsuftuRVuhVth&Nu<ultuJ^thtuawfJJtbtkytJNulrnk.
9: rJmkkdr<ylurnmtc stud:
nt& ^hJtltftbtulectc<œNtoJ<t
CtJvºtfbtkltsÚ&tyluhfbleftuRvKCwjawfleaultrlgbtuylwmthmhChfhJtbtkkytJNu.
xuLzhChlthuœhltFtltbtkksKtJujNçœtuyluytkkfztJåauftuRymkkdr<ltfumbtkkNçœtubtkksKtJujhfbbtLghtFJtbtkkytJNu.
10 y: ftbltu «tud{um mbgbgtoœtbwscfhJtltuhnuNu. ytmbgbgtoœt 10 jtFmw^eltftbbtxuyuj.ytu.ytR.
ytÃgt<theF&e 10 rœJm<&t 10 jtF&eWvhltkftbbtxuyuj.ytu.ytR. ytÃgt<theF&e 15 rœJm&e NY
&gujdKJtbtytJNu. <&t <u mbgœhrbgtlftble 5% juFuzevtuÍex Che fhthvºtfhJtltuhnuNu.
10 c: mûtbm•ttîtht Yt.10,00,000.00 (œmjtF) mw^eltxuLzhlebkswheltuXhtJvtzgtctœ(
LOI)ytvJtbtkytJNuðgthctœrœl - 10 btk rm¾gtuhexe zevtuÍexsbtfhtJJtlehnuNu. rm¾gtuhexe
zevtuÍexbtuzeChJtltrfMmtbtkBgwrl.ftuvtuohuNlbtk «JoðbtlrlgbylwmthftgoJtnefhJtbtkytJNu.
10 f: bkswh&gujxuLzhlembgbgtoœtbtkftbdehevqKo l
&tg<tusuxjtrœJmftbdehebtuzevqhefhujntug<uxjtrœJmlevulÕxexuLzhhfb (fhthrfkb<) lt 0.1 % bwsc
«r<rœJmbwscxuLzhbtkbkswh&gujmbgbgtoœtctœltFhuFhctfeftblehfbltbn•tb 10% juFu (jefJezexezubuSm)
vulÕxeJmwjfhJtbtkytJNu.
11 y: awfJKexuLzhChujœhvwhtk&gujtftbbtxult Au ylu<ubtkbswhe, vtjF, ÃjtLx, œuFhuF, mrJom-ftbdehe, Jes¤e,
htugÕxeJduhu<btbFaoltu<&t sYhsKtgðgthuht<vt¤eltftblujd<t J^thtltFaoltumbtJuN&NuyluxtkkfujtCtJ fu
œhfh<t J^thtleftuRawfJKeykkdult<ubltftuRœtJtægtlbtkkjuJtNulnekk.
xuLzhChlthFtuxehswyt<lufthKuy&JtftuRÔgrf<yu (vAe<u ctkk^ftbrJCtdltufboathentug fu l ntug)
<ubluytvujebtne<eluyt^thuvtA¤&e ftuRœtJthswfhJtnfœthhnuNulnekk. <ublwxuLzhChJt<&t
<ubtkkswœtswœtCtJyluœhChJtbtxusYheyuJe<btbbtne<e vtu<tltvûtu l bu¤JeNfJtlufthKuvtu<u
xuLzhhswfhJtluje^uy&Jt<ubtkk&eWCt&<t ftuRstuFb fu sJtcœthebtkk&eAxfeNfNulnekk. mœhftbbtkftuRvK
ò<ltctk^ftbltbxehegjWvhCtJJ^thtuytvJtbtkytJNulrnk.
11 c: ftuLx[tfxhtuluvubuLx / hlekdcejBgwrl. frb§h©eltsu<u «JoðbtlrlgbbwscfhJtbtytJNu. <&t Bgwrl.
frb§h©e/mexeRsluh©eltsu<u JF<ltk mh¾gwjh «btKuftbdehe/ybjfhJtckDlf<othnuNu.
11 f: ftuLx[t¾xhlt œhufhlekdcejbtk&eftuLx[t¾xhlu awfJJtle&<e fwjhfb (xuLzhbwsclwkvubuLx+ yu¾Mx[t ytRxb) Wvh
2 % juFuhexulNlbleftvJtbtkytJNusuVtRljcejbtkvh<ytvJtbtkytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<ltftgœtbwscsuftuRhfblefvt<fhJtle&Nu<u
bwscftuLx[[tfxhltcejbtkk&efvt<fhJtbtytJNu.
12: yu)fhthmkkc^eœM<tJustufhthltydðgltCtddKtNuylu<u mD¤tmne<ltfhthmbd{ ftblujtdwvzNu.
ce)xuLzhbtkœNtoJujftbmkkck^eœM<tJusbtkkœNtoJujrJd<btkkrJmkkd<<tltrfMmtbtkleauœNtoJuj
¢btlwmthœM<tJusbtkkœNtoJujrJd<d{tnghtFJtbkktytJNu.
(2) xuLzhVtubolwkCtJvºtf
(3) MvuNeVefuNl
z[tuRkdbtkfœ, ytfth, ytkkfztfœtaFtuxtntug<tubtvujtkkfœ, ytfthluylwmhJwk.
(2) xuLzhVtuboleylwmwra-ce
(3) MvuNeVefuNl
CwjChujt fu FtuxtJKolltrfMmtbtkkytmkkck^eWvhefûttyurJmkkd<<t ykduleltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.lebkswhebu¤JJtbtkytJNuylu<u bwscfhJtbktytJujrlKogykkr<b dKJtbkktytJNu.
13 :xuLzhhuz[tuRkd fu MvuNeVefuNlbtkkhnujeftuRûtr< fu FtbeltuduhjtCjuJtlefturNN l fhJeyluRsluhRl-atsoÃjtl<&t
MvuNeVefuNlleûtr<ytumw^thJe<&t <ulwkmtawky&oDxlfhtJJwk.
14 :ytWvhtk<y.Bgw. ftuvtuo. ltslhjftuLx[tfxfLzeNlvKbtLghtFJtlehnuNu.
15 :yufe JF<u yuffh<t J^wsøgtytuyuftb NY fhJtltuJfoytuzohb¤u<tuftbyufmt&u s c^u NY fhJwvzNu.
16 :atjwftbumrJomjtRllulwfNtl l &tg<u he<u ftbfhJtlwhnuNu. stuftuRmrJomjtRllulwfNtl&Nu<tu<ule
mkvwKosJtcœthe (òlbtj) ftuLx[tfxhlevtu<tlehnuNu. mtRxWvhftbœhBgtlbswhtu fu
sl<tltftuRbtKmltòlbtjlulwfNtl&tg<ule sJtcœtheftuLx[tfxhlehnuNu. vtujemVhegtœ&tg<tu<ule
sJtcœthevKftuLxtfxhlehnuNu. CuFz ^me l vzu<ule sJtcœthevKvtujemVhegtœbtftuLx[tfxhlehnuNu. CuFzDme l
vzu<u btxumjtb<eltvdjt (suJt fu œtuhzwk ctk^ebswhFtztbtkk W<thJt, mtuhekkdyluMx[[xekkdfhJtrJduhu)
je^tJdhbsqhluFtztbtkk k k W<thNu<tuftuLx[[tfxh s vtujemVhegtœbtsJtcœthhnuNu.
Bgwrl.ftuvtuohuNlltuftuRvKMxtVytltbtxusJtcœthhnuNulrn. BtswhtulturJbtuvK W<thJtu.
17 :bxehegÕm fu ceòxuMxedhevtuxoftuLx[tfxhuvtu<tltFauoftuvtuohuNlsKtJu<u søgtyufhtJJtlthnuNu.
bxehegÕmjtJJtfujRsJtltumkvwKoFaoftuLx[tfxhuCtudJJtltuhnuNu.
18 : M&¤ vrhrM&r< / sYhegt<bwscftbfhtJ<t xuLzhltytRxbltsÚ&tbtk J^ ^x &tg<turlgbylwmth<u
ykduftbfhJtftuLx[tfxhck^tgujt Au.
19: mtRxvhjtJJtbtkytJujbtjmtbtlhesufxfhJtbtytJu<tu<whk<rœl 1btk vh<jRsJtltuhnuNu. yLg&t<ule
lwfNtllesJtcœtheftuLx[tfxhlehnuNu.
20 :ftuLx[tfxhlusuftuLx[tfxytvJtbtkytJuAu.<ubtmhfth©elt
«Joðbtlrlgbbwscve.yuV/juchyufx/vtujemltftgœtlwvtjlfhJtlwkhnuNu<&t ytykduBgwrl.ftuvtuohuNlîthtsubtne<e
btkdJtbtkytJu<u ytvJtlehnuNu.
21: ftuRvKftgœtfegjexeduNlybœtJtœNnuhleftuxobthnuNu.
22: btjsu<u MxtumoWvhy&JtmtRxWvhjtuftululz<h l &tg<u he<u mwaltbwsc W<thJtltu<ubsdtuXJJtltuhnuNu.
23: ftuRvKmhfthefhJuhtChJtle<btbsJtcœtheftuLx[tfxhlehnuNu.
24: ftuLx[tfxhîthtxuLzhbtœNtoJujMveNeVefuNlbwscMxtLzzobxehegÕmMvuNeVefuNlbwscjtJJtlthnuNu.<&t
xuMxekdfhtJJtlwkhnuNu.<&t y ykdu «JoðbtlBgwrl.ftuvtuohuNltrlgbtulwvtjlfhJtlwhnuNu
25: ytxuLzhbtkk stuftuRytRxbhnedRntug<tu<u y&Jt M&¤ rM&<e bwscxuLzhbtkmbtJuN l
ntug<uJeJ^thtleftbdehefhJtle&tg<uJtrfMmbtkBgwrl.ftuvtuohuNlt
«JoðbtlrlgbylwmthJ^thtleytRxbltCtJlffefhJtbtkytJNuylu<u bwscawfJKefhJtbtkytJNu.
26: atjwftbœhBgtl «tuxufNllemkvwKosJtcœtheftuLx[[tfxhlehnuNu. subtkkvevzt,œtuhzt, Cgmwafctuzo,ÃjtMxefvxe,rJ.
ftuLx[tfxhujtJJtlwkylumtaJJtlwwkhnuNu. yluftuRvKyfMbt<&Nu <tu<ule mkkvwKosJtcœtheftuLx[tfxhlehnuNu.
27: M&¤ WvhatjwftbdeheœhBgtlftbfhlthftuLx[tfxhltbswh /
fboathey&JtyLgÔgrf<ltyfMbt<ltrfMmbtkjuchyufxbwscfhJtle&<e ftgoJtne<&t
vtujemftgoJtnelesJtcœtheftuLx[tfxhlehnuNu.
28: stuMxtVmqaltytvu<u bwscmwaltvtu&eftuLx[tfxhuhtFJtlehnuNu. <ubtœhhtusfhujftbdehe<&t
yr^ftheytuyuftbmw^thJt fu vtu{d{um J^thJtltltuk ^ fhujntug<tu<ulwkftuBÃjtgLmytvJtlwk hnuNuytJeltu^ltsJtc l
&gufu<u «btKu M&¤ Wvhybj l &guftuLx[tfxhluvulÕxefhJtlemððttyuze.mexeyuLSlehgh©eluhnuNu.
29: œhufytRxbltMvuNeVefuNlybœtJtœBgwrlrmvjftuvtuohuNlltkbkswh&guj<&t btLghtFujMvuNeVefuNl
Nh<tubwschnuNusuytRxbbtkMvuNeVefuNl l
ntug<uJtmkstudtubtkyuze.mexe.yuLSlegh©elturlKogytFhehnuNu.JtuxhekdfhJtbtklrnytJu fu
œhhtusJ^thtltuzucheÍWvtzJtbtklrnytJu<tuftuLx[tfxhltFauoylusutFbuJdhltuxemuJtuxhekdfhtJJtbtk<&t
zucheÍWvtzJtbtkytJNuylucejbtkk&ehfbftvejuJtbtkytJNu.
30: juchJuÕVuhVkkzbtxuntjbtkkhtsgmhfth©eyufhujnwfbbwsc 1%(yufxft) hfbcejbtk&eftvejuJtbtytJNu.
31: vhevºt lk-28 <&t ltKktFt<t vhevºtlk 31 <t.7/7/2017 îtht<t.1/7/2017
vAecnthvtzJtbtytJuj/ytJlthxuLzhbt (bxehegÕm + juchmÃjtgmt&u )
G.S.TltltuxeVefuNlbwscG.S.Tsgtjtdwvz<tuntugðgtmœhnwftbltcezhuG.S.TltuxeVefuNlbwscleyuÃjefucuj
exeægtlbthtFexuLzhlwkcezekdfhJtlwhnuNu.
32. mefgwhexezevtuÍex/ vVtuobLmduhxelehfb Yt.1 fhtuzmw^eleykœtS<hfbltftb,ze.ze ,cukfduhkxeltMJYvbt<&t Yt.1
fhtuz&eWvhleykœtS<hfbltftbbtxumefgwhexezevtuÍex / vVtuobLmduhkxelehfbbtºt ze.ze.,vuytuzoh,
cukfduhkxeltMJYvbtytvJtlehnuNu. zebtLzz[tVx/ cukfduhkxe ‘‘Bgwrl.frb§h©eybœtJtœ’’ ltltbltuytvJtltuhnuNu.
33.ybœtJtœ BgwrlrmvjftuvoutuhuNlBgwrlrmvjfrbNlh©elemuLx[j yturVm mh¾gwjh lk 41 bwscxuLzhhyultufheœt<t
<hefuhSMxu[NlVhrsgt<fhtJJtlwhnuNu.
34.ybœtJtœ BgwrlrmvjfrbNlh©ele<t.16.02.23 le bkswhebwsc“ «J<obtlS.yum.xe. J^thtltuawfJJtbtkytJNu”
Conctractor's Signature Add. City Engineer
Address & Mobile no. ( SOUTH ZONE)
1) nwk /ybuyt&eyufhthfhwkAwk/fheyuAeyu fu ytxuLzhhswfh<tkkvnujtkkbuk/ybu M&¤le bwjtft<je^e Au
yluftblujd<t btjmtbtl, bswheyluceSctc<tulujd<e M&trlfvrhrM&r<le ò<-btne<e
2) nwk /ybuyt&eyufhthfhwkAwk/fheyuAeyu fu ytftuLx[tfxhtule Nh<turJd<tuyluxuLzhlujd<t
œM<tJustuft¤SvwJofyÇgtmfgtuo Au ylu<u bwsc<ultuybjfhJtmkkb<Awk/Aeyu.
ftuLx[tfxhlemneylurmfft<theF :-
mkœCo:(1)©b yluhtusdthhtsgbkºte©e- lJerœÕneltvrhvºt¢btkfC-
(2)fboatheCrJ»grl^emkdXl- lJerœÕneltvrhvºt ¢btkfCIAU/011(33)2015/HQ/5345
(3) ©b yluhtusdthrJCtd-dtkDeldhvrhvºt ¢btkf: RveyuV/182016/368596/b(3)
Cth<mhfth©elt©byluhtusdthbkºttjg-lJerœÕneylufboatheCrJ»grlr^ mkdXl
(R.ve.yuV.ytu.) lJerœÕneyu<ubltylw¢bu<t.07/07/2015 ylu<t.21/06/2016lt
vºttu&emhftherJCtdtu,
mhftherldbtu<ubshtsglemnfthemkM&tytuyluctuzeytubtkytWxmtumo&eftbfh<tkbnufblumtbtrsfmwhûttlwkA
ºtb¤ehnu<u btxu<ubluftbœthCrJ»grlr^ yluvhawhKstudJtRytult yr^rlgb,1952 nuX¤
ytJhejuJtsKtJuj Au.
ytylwmk^tluhtsgmhfth©eltmJuorJCtdtu, ònuhrldbtu, htsglemnfthemkM&tytu,
MJtg<mkM&tytuyluMJhtsglemkM&tytubtkytWxmtumeodyusLmeytuîthtytWxmtumeod&eftbfh<t,
ftuLx[tfxfboatheytu,htusbœth<&t mhfth©eltftbbtxurVfmvdthuhFtgujt<uJt «ðguffboathe fu
subluftuRvKyr^rlgbyk<do<mtbtSfmwhûttltjtCtu b¤<t l&e<uJtfboatheytuluCrJ»grlr^
Vt¤tuyaqffvtgylu<ublumtbtrsfmwhûttltujtCb¤u<u btxuleaubwscltvdjtkjuJtsKtJtguj Au.
1. ftuRvKmkM&t/ yusLme/ ftuLx[tfxhluftuRvKmhftheftgtuobtxuftuLx[tfxytv<t
vnujt<ublevtmufboatheCrJ»grlr^ mkdXlyk<do<RMgw&guj «turJzLzVkzhSMx[uNl Au fu lne<ule
2. Wvhtuf<fuxudhebtkytJ<t fboatheytuluftbœthCrJ»grl^eyluvhawhKstudJtRytult
yr^rlgb,1952 ylu<u ykk<do<DzJtbtkytJujgtusltytulestudJtRytujtdwvzu<u
btxu<tðftrjfvdjtkjuJt.
3. Wvhtuf<fuxudhebtkkytJ<t fboatheytultuCrJ»grlr^ltuVt¤tu<&t ltufheœt<t
<hV&eWbuhJtltu&<tuVt¤tuyaqffvtRlu<ublt «turJzLzVkzlt Ft<tbtksbt&tg,<ule aftmKefhelu s
vAeltbrnltleawfJKeytWxmtumekdyusLmelufhJe.
fauheltyr^f]<yr^fthe©eytultsKtÔgtbwscybœtJtœBgwrlrmvjftuvtuohuNlbtkftbfh<tkftuLx[tfxh©eytu,
mÃjtgoh©eytu<&t
fLmjxLx©eyturJduhusuJe<btbcnthleyusLmeytuyu<ubltnM<fltfboathe©eytultuvKR.ve.yuV.btkmbtJu
NfhJtltuyluR.ve.yuV.ltrlgbbwscR.ve.yuV. awfJJtusYheyluVhSgt< Au.
stuyubfhJtbtkawf&tg<tur«LmevtjyuBÃjtugh<hefu<ubltawfJJtltve.yuV. ykdultltKtkrlg<Ôgts,
vulÕxeyluzubuSmmne<ybœtJtœBgwrlrmvjftuvtuohuNluawfJJtlesJtcœthe l &R Nfu<u nu<w&emkœrCo<vºt
¢btkf 3 yLJgubnu. Bgwrl. frbNlh©e XhtJlk.50 <t.06/08/2018&e
b¤ujbkswheR.ve.yuV.yufxjtdw&gujntug<uJtybœtJtœBgwrlrmvjftuvtuohuNlbtkftbfh<t
ntjbtkftgoh<ntug<uJtyluytsvAeftbytvJtlt&tg<uJt<btbftuLx[tfxhtuluftbytv<t
vqJuoR.ve.yuV.hSMx[uNlfhtJujntug<u sYhe
Au.<ubssuytuluR.ve.yuV.yufxl&ejtdwvz<tu<uJtftuLx[tfxhtuyuhtFujfboathe©eytubtxuR.ve.yuV. yufx<&t
htsgmhfth©eltvrhvºtbtksKtÔgtbwscr«LmevtjyuBÃjtugh<hefuR.ve.yuV.lesJtcœtheybœtJtœBgwrlrm
vjftuvtuohuNllehnu<e ntuJt&eCrJ»gbtkR.ve.yuV. yufxlwkvtjl l fhJt&ezebtLzltuxem<&t ftgœtfeg
«r¢gt&ecaJtbtxu<&t ftgœtfegvrhrM&<e WvrM&< l &tg<u nu<w&ehtsgmhfth©elt ©b
yluhtusdthrJCtdltytmt&umtbujfhujvrhvºt ¢btkfRveyuV/182016/368596/b(3)
<t.07/07/2017 ltuawM<vKuybjfhJtusYhe Au.
ybœtJtœBgwrlrmvjftuvtuohuNllt<btb Ft<tltJztyr^fthe©eytulu<ubltnM<flt Ft<t/
rJCtdbtkfhtJJtle&<e ftuRvK «fthleftbdehebtxufhtJJtbtkytJ<t fJtuxuNl, xuLzh fu
ytuVhbtkR.ve.yuV.yufxbwscsYhehSMx[uNlctc<u yawfltuk^ fhJtle<&t
R.ve.yuV.yufxltuawM<vKuybjfhJtleFtmltuk^ juJtyºtu&esKtJJtbtkytJu Au.
mne:zu.Bgwwrl.frbNlh
ltuku ^:-y.Bgw.ftultmhfgwjh lk-41 <t.09/11/2021 bwsc ‘bwÏgbkºteyu«uLxemNevgtuslt’
yk<do<ftuLx[tfxh/xuLzhhuxuLzhmt&uVhSgt< R-VtubomxeoVefuxhswfhJtlwkhnuNusuleyawfltuk^ juJe.
xuLzhhlemneylurm¬tu
bu.Bgwrl.frb§h©e, ybœtJtœBgwrl. ftuvtuhuNlltmhfgwjhlk.-81, <t.26.02.2015 bwsc<btb
«fthlefLmx[fNlleyufxeJexebtkbwÏgftuLx[tfxh,mcftuLx[tfxhltsubswhtuftbdehefh<t ntug<u
<btbbswhtulwkdwsht<rcÕzekdyuLzy^hfLmx[fNlJfombtkhSMx[uNlfhtJJwkVhSgt< Au.
AHEMDABAD MUNICIPAL CORPORATION
Section II - CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be Initialed
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Vol. V.
5. The scope of work, project description mentioned in the document is indicative and is likely to
change during detail design. Project brief, along-with the schematic drawings and colored
photographs, is provided to assist the bidder in understanding the fundamental and specific
requirements of the project.
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms.
Information other than that related to this work shall not be considered for evaluation.
9. If AMDAVAD Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be
liable for disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria
will be rejected.
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect
or are conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and contract
without assigning any reason thereof.
15. All the material and other test expenses shall be borne by the contractor. Contractor shall
have to provide vehicle and other communication facilities to visit plant and testing
16. Contractor shall have to make his own arrangements for water and electricity for the purpose
of construction work at site at his own expense.
17. If the contractor fails to execute the said works within prescribed time limit, the said work will
be carried out at the risk and cost by other contractors with 20 % supervision charges as may be
decided by the Dy. City Engineer.
18. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project, users of
the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary
florescent marking on traffic signs to be provided so that it should be visible at night. During
night working hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signage, safety cones, traffic blinkers,
barricading tapes, red and green flags/lights etc for making easy smooth and safe conditions
for the traffic. The Contractor shall and must provide above at his own cost. If the Contractor
fails to comply this clause, Rs. 500/- per day shall be recovered from his bill.
19. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT,
govt.duties etc. on material procurement or any other component for the works from any
source shall be borne by the contractors.
20. Submission of project schedule:
Contractor has to submit the following documents along with the qualification data of the
tender failing in which shall lead to rejection of the tender.
Contractor shall submit the detailed Project schedule showing break up for the various tasks to
be performed in order of their occurrence during the project in Microsoft Project/Prima Vera
21. For Flakiness and Elongation Index norms adopted by AMC shall be made applicable.
22. For non-bituminous, bituminous and concrete works, the black trap aggregates of required size
shall be procured from any quarry.
23. Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such laws
shall be directly deducted from the contractor's outstanding. .
24. As per St. Committee's resolution 0.5% testing charges shall be deducted from each R.A.Bill and
the amount of actual Testing charges shall be adjusted in the final bill.
25. Special Clause:As per construction works welfare cess Act – 1996 non-refundable one percent of
tender amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Add. City Engineer
AHEMDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour
Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the
guide lines. If child labour is employed on the site work, the contractor shall have to deposit Rs.
(Rupees Tw enty thousand only) in the child labour welfare fund. If the employer refuses to deposit then
action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal Corporation
shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its
Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual
testing charge is taken and the remaining amount is refundable at the time of final bill (As per Muni. Board
Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and
has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be
entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made
by A.M.C. The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed
along with the tender duly signed. These shall form a part of tender. The tenderer shall not add or amend
the text of any of the documents except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of
the contract documents. The full consideration shall be given to such addendum or corrigendum or
correction before submission tender duly filled in by the contractor. Therefore, the contractor shall have to
watch such addendum or corrigendum or correction published by A.M.C through its website
www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the
tender documents,failing which the tender shall be liable for rejection and no any complaint in respect to
this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE Add.CITY ENGINEER
& STAMP (SOUTH ZONE)
AHMEDABAD MUNICIPAL CORPORATION
TECHNICAL SPECIFICATIONS
Item No. 1 Excavation for pipe line trenches for water supply, sewerage lne, manhole etc. all with
shoring and struting if required as per required gradient and line including safety provisions using site
rails and stacking excavated stuff including up to all required lead cleaning the site etc. complete for all
lifts and strata as specified. (GWSSB SOR 2022-23) SECTION : 1 & 2.B - LABOUR It.No.1, Pg.No.32
Item No. 2onveyance charge of earth, lime, murrum, building rubbish,manure, garbage, sludge, excavated
rock, fly ash, aggregates of any kind executed outside the road site. Rate also includes spreading & levelling
etc complete. Internal conveyance above 50 mt done within the work site is not payable. Note: Quantity Shoud
not be more then the quantity equal to excavation minus back filling. (no bulkage) (R&B Ahmedabad City SOR
2023-24 Statement 5 Item Code 030201A2 Page No.6)
Item No. 3Extra rate over item of excavation of earth if excavation is to be done in wet condition
without resorting to pumping out incl. of bailing out of water. (SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line Drainage Work Item No.3 Page 1)
Item No-4Excavation in bituminous road as per required gradient and line including safety
provisions using site rails and stacking excavated stuff inclucing up to all required lead cleaning
the site etc. complete for all lifts as specified. (GWSSB SOR 2022-23 SECTION : 1 & 2.B - LABOUR Item
No.2 Page No.33)
Item No-5Brickwork using common burnt clay building bricks having crushing strength notless than
35kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5 (1-Cement:5-finesand) (B) Conventional
(upto 10 ton) (Based on Building
SOR 2023-24) It.No.06001BA, Pg No.70
Item No-6Cement Plaster ((I.No.17.6 + 17.743 R & B SOR 2023-24 )
Item No-7Providing and supplying Lowering, laying and jointing ISI marked only standard length
Stonewate pipes in standard lengths of following class and diameter with cement joints in C.M.1:1
proportion in proper position, grade and alignment at all level as directed by Engineer-in-charge
including conveyance from stone to site of work, Jointing material etc.comp. including all
taxes,insurance, transportiton, fright charges, octroi,inspection charges, loading, unloading,
conveyance to departmental stores,stackingetc.complete (IS-651-1989) Class AA (GWSSB SOR 2022-
23)Part-1 & 2A (Material Sec) It.No.11.1,Class A,Pg.No.17+(GWSSB SOR 2022-23) SECTION:1 & 2.B-
LABOUR It.No.14, Pg.No.40
Item No-8Providing and supplying ISI Standard R.C.C, pipes (of Sulphate Resisting Cement) in
standard lengths of following Class and diameter suitable for either collar joints or rubber ring joints
including all taxes, insurance, transportation, freight charges, octroi, inspection charges, loading,
unloading, conveyance for departmental stores, stacking etc. Note : One collar should be supplied with
each full length plain ended RCC pipe, cost included in rates below. One rubber ring should be supplied
with each full length socketed pipe, cost included in rates below. (GWSSB SOR 2022-23 MATERIAL
SECTION :-1A Item No.10 Page No.15)
Item No-9Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of following diameters in proper
position, grade and alignment at all level as directed by Engineer-in-charg including
conveyance from stores to site of work, labour, giving hydraulic testing as per ISI code. (GWSSB SOR
2022-23 SECTION : 1& 2.B - LABOUR Item No.11 Page No.39)
Item No-10Providing and supplying ISI pipes (Of Sulphate Resisting Cement) in standard lengths of
following Class and diameter suitable for either collar joints or rubber ring joints including all taxes,
insurance, transportation, freight charges, Octroi,InspectionCharges , Loading, Unloading
ConveyncetoDepartmental Store ,Stockingetc.(GWSSB SOR 2022-23 MATERIAL SECTION :A Item
No.10.1E Page No.15)
Item No-11Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of following diameters in proper
position, grade and alignment at all level as directed by Engineer-in-charg including
conveyance from stores to site of work, labour, giving hydraulic testing as per ISI code. (GWSSB SOR
2022-23 SECTION : 1& 2.B - LABOUR Item No.11 Page No.39)
Item No- 12Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20 cm. in depth consolidation each deposited layer by ramming and
watering (SOR - (Jan. 2016) Rates for work of Drainage /SWD pipe line Drainage Work Item No.5 Page 1)
Item No-13Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of
surplus stuff as directed within a radius of 3 km. (GWSSB SOR 2022-23 SECTION : 1 & 2.B - LABOUR
Item No.14 Page No.40)
Item No-14Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3, finishing with
cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber seat cover etc..completed.
(SOR - (Jan. 2016) Rates for work of Drainage / SWD pipe line Drainage Work Item No.11 Page 2)
Item No-15Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside & outside (Only for shaft) In Cm 1:3, Finishing With Cement
Slurry, P/F 4 Mm Dia M.S.SteelHdpe Coated Steps 35 Cm C/C At 35 CmStaggeredMasonary In Cm 1:5,
Rcc Slab In Cc 1:1.5:3 of thickness 15 C.M.,Including Cantering & Reinforcement (Single jalli at
C.M. c/c bothway 10 mm dia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size
0.75 X 1.00 Meter (Inside Clear, M.H. length should be parallel to the flow) (SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line Drainage Work Item No.12 Page 3)
Item No-16Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 0.75 mt for
constructing slab @ depth more than 0.60 mt below Ground Level (Max. 3 unit of DM should be reduced
in this item) (As Per R.A. Based on Building SOR 2015-16) (SOR - (Jan. 2016) Rates for work ofDrainage
/ SWD pipe line Drainage Work Item No.13 Page 3)
Item No-17Constructing Slab type M.H. Chamber of the following size including excavation, refilling,
brick bats cement concrete(1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside & outside(Only for shaft) in CM 1:3, finishing with cement
slurry, P/F 4 mm diaM.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in masonary CM 1:5,
RCC Slab in CC 1:1.5:3 of thickness 23 C.M., including Cantering & reinforcement (double jalli at
15 C.M. c/c bothway 12 mm dia.) but excluding the cost of Manhole seat cover etc..completed. of Size
1.00 X 1.40 meter (Inside Clear, M.H. length should be parallel to the flow, for pipe dia<= 800 mm) (SOR -
(Jan. 2016) Rates forworkof Drainage / SWD pipe line Drainage Work ItemNo.14 Page 3)
Item No-18Dismantling of existing Arch type manhole upto Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and & finished 15 mm thick cement plaster inside in CM 1:3,P/F
4mm dia M.S. Steel HDPE coated steps 35 cm c/c at 35 cm staggered in masonry CM 1:5, incl.cost of
RCC Slab in CC 1:1.5:3, including Cantering & reinforcement as directed by engineer in charge. Rate
includes carting of debris and excavated soil (SOR-(Jan. 2016) Rates for work of Drainage/SWD
pipeline DrainageWork ItemNo.17 Page 4)
Item No-19Cutting the pipes of following dia coming in the new M.H.in running sewer including cutting
bars, including removingdebris /silt from the M.H. and carting at a suitable distance etc..complete as
directed. No payment for M.H. work will bemade until pipe is not cut completely in all respect. (SOR -
(Jan. 2016) Rates for work of Drainage / SWD pipe line Drainage Work Item No.17 Page 4)
Item No-20Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm thick
IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catch pit in the
proportion of CM (1:3) with outjali etc. comp. as directed. (As per R.A. Based on Building SOR 2015-16)
(AMC Drainage SORJan-2016)
Item No-21Set F.R.C. Strom Water Grating Grating(Jali): 743 x 743 x 90mm square jali, 10:00 MT load
design, 90x2mm MS flat allround, Frame: 600 x 600mm clear opening, outer size- 900 x 900 x 165 mm.
On the upper periphery of frame 25 x 3mm wide MS flat should be well embded in concrete to protect
the edges of frame (Based on Central Store Rate)
Item No-22Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any convenient time. All damaged work shall be well repaired
as per instructions. etc..complete. (SOR - (Jan. 2016) Rates for work of Drainage / SWD pipe line
Drainage Work Item No.19 Page 4)
Item No-23Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and
existing MH sheet cover, removing the debris from MH and carting the same as directed (SOR - (Jan.
2016) Rates forworkof Drainage / SWD pipe line Drainage Work Item No.21 Page 4)
Item No-24Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet
cover,removing the debris from chamber and carting the same asdirected. (SOR - (Jan. 2016) Rates for
work of Drainage /SWD pipe line Drainage Work Item No.22 Page 5)
Item No-25Providing Kachha of Pakka Dummy in the following dia pipes and removing the same after
completion of the connection work as directed. (SOR - (Jan. 2016) Rates for work of Drainage / SWD
pipe line Drainage Work Item No.26 Page 5)
Item No-26Temporary /Permanent Pluggingfor blocking of sewer line,
branchconnectionsanddiversionofflowsandremovalofallplugsby any means etc. comp. as
directedbyEngineerIn Charge of the work. (GWSSB SOR Itm no-6, PG no-102)
Item No-27Providing Dead Cantering using good quality Country Wood Planks, wall Plate of required
thickness and size including placing the nece. supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per standard engg. practice etc. comp. as directed. (SOR
- (Jan. 2016) Rates for work of Drainage / SWD pipe line Drainage Work Item No.27 Page 5)
Item No-28Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid
accident & for smooth traffic diversion &movement including cautionary board etc. Item also includes
for making temporary sufficient nos of lighting arrangement through outthe work with necessary
required arrangement. The same shall be removed after completion of work. (Only for break down work
from start to complete) (SOR- (Jan. 2016) Rates for work of Drainage / SWD pipe line Drainage Work
Item No.29 Page 6)
Item No-29Dewatering by pumping set (GWSSB SOR 2022-23 Sec-E Item no.1 pg.104 )
Item No-30Hiring and operating the 20 KV 3 Phase Electric Generator for operating desilting machinery,
and lighting and other requirements with Arranging diesel to run the D.G. Set Do As Directed. 8 Hrs
Shift. (No payment should be allowed for non workingconditionofmachinery)(AMC Drainge SOR 2015-
2016 Machinary Item No.3 - 12% GST )
Item No-31 Hiring of Tractor with trolley considering 8 hrs. as working day hours incl. Driver (GWSSB
SOR 22-23 It.No.7 pg.no.105 sec.2.E. mis)
Item No-32Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges and stacking of useful & non-useful materials
separately up to store. (No payment should be allowed for non working condition of machinery and for
pipe line excavation and laying work) (SOR- (Jan. 2016) Rates for work of Drainage / SWD pipe line -
Machinery Item No.4 Page no.7)
Item No-33Supplying electric breaker machine for RCC slab or asphalt demolishing work on site by
using operator, fuel, power supply etc.complete as directed. (no payment should be allowed for non
working condition of machinery and for pipe line excavation and M.H. work. Allowed only for
break down work) (SOR - (Jan. 2016) Rates for work of Drainage / SWD pipeline - Machinery Item No.9
Item No-34Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site
by using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and M.H. work. Allowed only for break
downwork) (SOR - (Jan. 2016) Rates for work of Drainage / SWD pipe line - Machinery Item No.10 Page
Item No-35 Providing & Supplying Hitachi Machine-110 capacity onrental basis in case of emergency
situation and break downtype work & also during unavoidable condition as perinstruction of
engg.incharge , rate includes all nece. shifting,fuel and operating charges . (No payment should
beallowed for non working condition of machinery )(Based on central work shop rate)
Item No-36Carting and Fixing M.H. Chamber or CatchpiteSeat and Cover in line and level to match
exisisting road level in CC 1:2:4 and finishing smooth, watering and protecting for 7 days
etc.completeasdirected.M.H.seat cover will be supplied byA.M.C.(from any store) (AMC Drainage SOR
Item No-37Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.(Based On
Rate Of Central Store Circular No.01/2025-26, Dt.21-04-2025)
a- SET cover and frame) F.R.C. Extra Heavy Duty [EHD-35] Machinehole Covers & Frame- 560mm ø
clear opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 :
a1- ( OnlyCover ) F.R.C. Extra Heavy Duty [EHD-35] Machinehole Covers & Frame- 560mm ø clear
opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
a2 - Only Frame ) F.R.C. Extra Heavy Duty [EHD-35] Machinehole Covers & Frame- 560mm ø clear
opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
b- (SET cover and frame) F.R.C. Heavy Duty [HD-20] Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 :
b1- (Only Cover) F.R.C. Heavy Duty [HD-20] Machinehole Covers & Frames- 560mm ø clear opening,
The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table 1 (Only
b2-(Only Frame ) F.R.C. Heavy Duty [HD- 20] Machinehole Covers & Frames- 560mm ø clear opening,
The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table 1 (Only
c-(SET cover and frame) F.R.C. Medium Duty [MD-10] Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame)
c1-(Only Cover ) F.R.C. Medium Duty [MD- 10] Machinehole Covers & Frames- 560mm ø clear opening,
The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
c2-(Only Frame ) F.R.C. Medium Duty [MD- 10] Machinehole Covers & Frames- 560mm ø clear opening,
The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
d-(SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear
opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
d1-(Only Cover ) F.R.C. Medium Duty [MD- 10] Chamber Covers & Frame- 600 x 450 mm clear opening,
The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
d2-(Only Frame ) F.R.C. Medium Duty [MD- 10] Chamber Covers & Frame- 600 x 450 mm clear opening,
The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
e-(SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber Cover & Frame - 600 x 450mm clear
opening,The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
e1-(Only Cover ) F.R.C. Light Duty [LD-2.5] Chamber Cover & Frame - 600 x 450mm clear opening,The
dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
e2-(Only Frame ) F.R.C. Light Duty [LD-2.5] Chamber Cover & Frame - 600 x 450mm clear opening,The
dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
Item No-38Supplying, labour for break down repairing work for activitieslike excavation, disliting,
removing debris from trench backfilling etc. comp. as directed by Eng.in charge. (Rate as perLabour,
Skill Development & Employment Department,Government of Gujarat Notification dated 27th March
Item No-39Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared
surface and compacting with vibratory roller to achieve the desired density as per Codal Provision.
(Road Project Approved Rate)
Item No-40Extra rate over item of excavation of earth for excavation of asphalt pavement/RCC of
thickness up to 0.20 meter including demolishing the asphalt carpet, metal, soiling /cutting
reinforcement etc.comp. with stacking the material as directed. (based on previously approved rate by
CE sir (AMC Drainage SORJan-2016) and As per Road Project Rate W/O GST)
Item No-41Labour charges for repairing of lekage CI/Di pipe line for following dia different places
including necessary excavation manually or by machinery removing mud dewatering cleaning of pipe
and leakafe portion and repairing by inserting lead wool jute tools required for inserting lead wool
hiring charges of excavators Hydra/crane j.c.b dewatering set fuel operator cost of lead wool etc
complete(including all material but excluding cost of pipel) (GWSSB SOR 22-23 SECTION 1 G I.NO 2)
For detail specifications refer PWD and GWSSB department Specifications.
Seal and Signature of the Bidder Add. City Engineer (S Z)
Technical conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the correction slips made up to 15-08-1999 may be referred.
(only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be
taken to mean as reference to the latest edition of the same of force on the date of
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence
of specific mention for a particulars point / aspect, the same in the relevant Indian
Standards shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in
its specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date.
The contractor shall have no claim to any payment or compensation whatsoever on
account of any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works & all precautionary measures
during execution shall have to be kept in sufficient numbers and in good working
condition at the site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and completion of
work to the required strength and quality. Acceptance of the same by the Engineer in
charge shall not however, absolve the contractor from the responsibility of any adverse
effect and concordance of adopting the same in the course of exaction or completion of
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and
machinery on the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to
the quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required.
18. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the
guidance of AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after 15 days from the date of issue of the written work
order to the contractor. No time extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations
as necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour
26. Contractor is requested to see the site physically before tendering. He is also requested
to quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable
water for drinking, washing, sanitation and cleaning down. The contractor will be
responsible for all the costs where applicable of connection, meter installation, water
consumed, water required for testing purposes, disconnection and the laying,
maintenances and ultimate removal of any distribution system around the site.
28. Electricity:Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such
services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site
for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the
power during the work. No compensation shall be paid for idle labor staff, machineries
and for use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their
initial/eligibility criteria mentioned above along with the bid. They shall have also to
submit the income tax clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized
Government approved licensed electrical person or firm in appropriate category in
accordance to contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued
by Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes
& thereby total amount of work increases/ decreases.
& thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding
on the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning
any reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to execute the contract agreement within 15 days from the date
if issue of work order.
Eventhough in special case, If work is not started because of monsoon or any
other special reason (like site is not available), after evaluation of situation the actual
date of starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the
40. Conditional tenderes will not be accepted.
41. The Bidder should be follow COVID 19 related government guideline
Seal and Signature of the Bidder Add. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the term and conditions of tender for the work of “Providing and Laying upgration Drainage
Line 450 mm work at alifnagartran rasta to akrutiborlambha ward south zone.(reinvite)
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we undertake to
pay to Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad. Specified tip to his
first written demand, without demur without delay and without the necessary of a previous of
judicial or administrative procedures and without the necessity of a previous of judicial or
administrative procedures and without the necessity to prove to the Bank the defects or short
comings or debits of the contractor any sum within the limit of Rs.....................................................
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during
the period that would be taken for the acceptance of tender. However unless a demand of claim
under this guarantee is made on its in writing on or before the (Date to be specified will not be less
than 120 days from the stipulated date of receiving the tender) we shall be discharge from all
liabilities under the guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, Ahmedabad Municipal Corporation, A' bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - .AsperANNEXURE –
Seal and Signature of the Bidder Add.City Engineer (S.Z)
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________for “Providing and Laying upgration
Drainage Line 450 mm work at alifnagartran rasta to akrutiborlambha ward south
zone.(reinvite)
Whereas the said M/s __________________________________________has approached Us
___________________________________________Bank to provided a PERFORMANCE
GUARANTES BOND to the AMC for the work undertakes by M/s.
agreed to provided such a PERFORMANCE GUARANTEE BOND. Now therefore, we the_
______________________Bank provided the following Performance Bank, Guarantee by way of
these Bond to the AMC.
1. The contract value of the contract provided to M/s. _____________________by the AMC in Rs.
_ __________. This guarantee in the nature of PERFORMANCE GUARANTEE is provided so as
to ensure and indemnify the AMC for full and proper performance of the contract by
the _______________________________Bank hereby indemnify the AMC for all losses and / or
damages to the road surface which would be laid or resurface by M/s.________________________
and such PERFORMACE GUARANTEE would include any damage to hot mixes, dense
bituminous macadam asphalt, concrete, seal coat, concrete blocks, road markings, signage, steel
structures which may be suffered by the AMC as a result of defective production of mixes, because
of poor workmanship, or at all, by way of this bond, we the
_________________________________Bank agree and promises that in the eventuality of the
contractors M/s. __________________________________________not repairing or remeding the
Problem, loss or damage to the road surface we shall indemnify and pay the AMC such expenses,
losses and damages that may be incurred by the AMC, as a result of the AMC getting the work
done itself or from the other source.
2. We _______________________________ Bank agree and understand that the decision as to
whether any losses or damages to the project have taken place or not and / or whether the work
suffers from poor workmanship or not will be taken by the Commissioner of AMC and on the
Commissioner's decision regarding such losses or damages or defect whatsoever being so notified
by the AMC to us, We shall immediately take steps and ensure that
M/s.__________________________________ faithfully and diligently carry out the necessary
remedial steps to the full satisfaction of the Commissioner of the AMC. The opinion of the
Commissioner as to whether full and complete remedial steps, to the full satisfaction the
Commissioner of the AMC has been taken or not, will be that of the AMC. For the purpose, of
arriving at such decision as aforesaid it will be open to the Commissioner of the AMC in case he so
desires, to delegate this power to subordinate like the city Engineer to take appreciate decision and
the decisions referred to above will be deemed to be properly take and as if taken by the
Commissioner of the AMC. In the eventually of M/s.______________ not taking remedial
action to the almost satisfaction of the Commissioner of AMC. The AMC will be entitled to get the
work done itself or from sources. On the Commissioner of the AMC notifying to us the total
expenses incurred for this purpose. We hereby expressly have under taken to pay the AMC the said
amount forth with and in any case not less than 7 days from taken to pay the AMC the said binding
the amount indicted by the Commissioner of the AMC and our obligation to pay such amount will
be continuing of the AMC and our obligation irrespective of any dispute of differences that may
arise between us and M/s. _____________________________ of between the AMC and M/s.
3. The contract value is Rs. __________________________. This PERFORMANCE GURANTEE
is limited to 5% of the said contract value and accordingly it comes to Rs.
_______________________ our liability will be in all cases be limited to Rs._________________.
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a period of
five years and one month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the AMC notify such
completion that to us. In case, no such completion it is notified, this performance guarantee will be
a valid from five years from the date of execution of this agreement. The Performance Guarantee
will come into effect from such completion date. In case however, the contract of several parts it
will be opened to the Commissioner to indicate separate completion dates for separate part and to
simultaneously indicate a break up of the contract value equivalent to the separate part. In which
case the PERFORMANCE GUARNATEE to extent of the different completion dates. It is
expressly understood that the considering this period of five years and one month, the date by
which the Corporation, intimate the Bank about the losses, damages or problems as the case may
be, shall be considered as long as such intimation is within a period of five years and one month
from the completion date. We the ___________________ Bank will be liable, irrespective of
whether the remedial actions or lack thereof has taken place after the period of the five years and
5. We _________________________________ Bank agree that the PERFORMANCE
GUARANTEE which is continuing guarantee will be binding, and enforceable against us
irrespective of any difference / disputes between the AMC and M/s.
and irrespective of any change or variation or execution time or any forbearance or waiver made or
6. In case any disputes arise as to the interpretation or implementation or implementation of this
PERFORMANCE GUARANTEE, the matter shall be referred to the sole arbitration of he
Commissioner of AMC whose decision in the matter will be final. In case any resource to any court
of law is necessitated, the appropriate Civil Court in the Ahmedabad along will have Jurisdiction.
Date: Signature of Contractor
FORM 3 - FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 20__ between Ahmedabad Municipal
Corporation ………………..(here in after called “the Employer”) of the one part and
____________________________________________ (here in after called “the Contractor”) of the
WHEREAS the Employer is desirous that certain works should be executed by the Contractor, viz.
____________________________________________ and has accepted the bid by the contractor
for the execution and completion of such works and the remedying of any defects therein at a
contract price of Rs.______________ (Rupees _________________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) the Letter of Acceptance;
b) the General Conditions
c) The Financial Condition
d) the Technical Specifications;
e) the Priced Bill of Quantities; and
f) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in after
mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works
and remedy any defects therein in conformity in all respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the Works and the remedying of defects therein the Contract Price or such other sum
as may become payable under the provisions of the Contract at the times and in the manner
prescribed by the Contract. IN WITNESS whereof the parties hereto have caused this Agreement to
be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence
On behalf of Ahmedabad Municipal
On behalf of M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
Sample Form for updating - qualification information
STATEMENT NO.-1
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Year Name of Employer Value of the Reasons/Details for Remarks showing
Project Project (`) litigation/arbitration Present Status
(1) The bidder shall furnish separate table for individual project.
(2) The above information shall be supported with necessary documents otherwise the same shall be
treat as null and void.
(3) A consistent history of arbitration awards? Judgments against the applicants or any partner of a
joint venture may result in disqualification for proposed work.
(4) If the details of litigation History is hidden by the applicant and later on it comes to knowledge of
the employer the bidder shall be disqualified for the proposed work and other appropriate actions
shall be taken against the bidder.
Seal and Signature of the Bidder Add. City Engineer (SZ)
Date: Ahmedabad Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender notice 743 vol1.pdf
tender notice 743 vol 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .