| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | ₹3.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.8 L+₹96 (0.02%)Rejected-Finance | ₹3.8 L+₹96 (0.02%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.5 L+₹67,399 (17.5%)Rejected-Finance | ₹4.5 L+₹67,399 (17.5%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.7 L+₹86,546 (22.5%)Rejected-Finance | ₹4.7 L+₹86,546 (22.5%) | L4 | Rejected-Finance L4 |
| 5 | L5₹4.8 L+₹96,023 (25.0%)Rejected-Finance | ₹4.8 L+₹96,023 (25.0%) | L5 | Rejected-Finance L5 |
Tender Value
₹4.8 L
EMD Value
₹9,622
Closing Date
10 Aug 2026, 3:00 pmClosed
Assistant Engineer
Golaghata KNI Avenue Kolkata 700048
Maintenance and repairing of drainage Pit at Sribhumi on KNI Avenue 1st K.M. ( Kolkata bound flank ) under Baguihati Highway Sub Division under Barasat Highway Division No. - I in the District of North 24 Parganas.
2026_WBPWD_5017404_2
WBPWRD/AE/BHS-D/eNIT04/2026-27
Open Tender
CIVIL WORKS
Percentage
Sribhumi
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,622
8 Sept 2026
29 Jul 2026
12 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Reference to MORT&H's specification clause 202)
Dismantling Brick / Tile work In cement mortar | 2.15 | Cu.M. | 361.14 | ₹776.45 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Reference to MORT&H's specification clause 202) By Mechanical Means Cement Concrete Grade M-15 & M-20 | 11.07 | Cu.M. | 501.42 | ₹5,550.72 |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Ordinary soil depth upto 3 m.by Mechanical Means including cost of Dewatering 20 % . | 76.51 | Cu.M. | 151.78 | ₹11,612.69 |
| 4 | Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305 (Reference to MoRT&H's specification clause 301). | 89.73 | Cu.M. | 86.77 | ₹7,785.87 |
| 5 | Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in-charge.(Reference to MORT&H's specification 304). | 11.27 | Cu.M. | 1,579.07 | ₹17,796.12 |
| 6 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (Reference to MORT&H's specification 2100). | 9.6 | Cu.M. | 5,627.17 | ₹54,020.83 |
| 7 | Brick masonry work with 1st class full size bricks except when necessary to complete the bond in cement morter 1:4 in foundation complete, including thoroughly soaking the bricks in a tank filled with water for a minimum period of one hour prior to being laid, protecting the green structure from rain by suitable covering and with a minimum Seven days curing etc., but excluding pointing and plastering, as per drawing and Technical. Specifications.(Reference to MORT&H's specifications 1300 & 2200). | 22.47 | Cu.M. | 7,255.94 | ₹1,63,040.97 |
| 8 | Plastering with cement mortar (1:3) on brick work in sub-structure complete all including raking out joints curing, etc as per Technical Specifications (Reference to MORT&H's specifications 1300 & 2200). | 61.8 | Sq.M. | 134.41 | ₹8,306.54 |
| 9 | Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200).
RCC Grade M35 With Batching Plant, Transit Mixer and Concrete Pump Including 3% extra cost as formwork over cost of material | 3.73 | Cu.M. | 6,787.09 | ₹25,315.85 |
| 10 | Supplying, binding, fixing etc. including initial straightening, cutting to requisite length, hooking and bending to correct shape, placing in proper position of uncoated HYSD reinforcement bar in open foundation complete as per drawing and Technical Specifications (Reference to MORT&H's specifications 1600 & 2200). | - | M.T. | 68,392.87 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
WBF.pdf
Tender Documents • 1.16 MB
BOQ_5087779.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .