Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC | ₹17.5 L Quoted ₹17.3 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹18.0 LRejected-Finance | ₹18.0 L | L2 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | PANDIYAN K L2 | N PERUMAL L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of 30000 Ltr OHT at Palarpatti in Nattarpatti Panchayat. Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B First depth | 60.5 | cu.m | 300 ₹18,150 | 245 ₹14,822.50 |
| 2.00 | II nd depth | 13.61 | cu.m | 500 ₹6,805 | 381 ₹5,185.41 |
| 3.00 | Supplying and Filling foundation and basement with filling M-sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 9.08 | cu.m | 2,000 ₹18,160 | 1,715 ₹15,572.20 |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 4.54 | cu.m | 5,500 ₹24,970 | 5,362 ₹24,343.48 |
| 5.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle - Footing side | 10.4 | Sq.m | 800 ₹8,320 | 515 ₹5,356 |
| 6.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification | 1.47 | MT | 99,000 ₹1.5 L | 89,988 ₹1.3 L |
| 7.00 | Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 13.52 | cu.m | 10,000 ₹1.4 L | 9,173 ₹1.2 L |
| 8.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 7.2 | Sq.m | 800 ₹5,760 | 516 ₹3,715.20 |
| 9.00 | Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 0.54 | cu.m | 10,000 ₹5,400 | 9,173 ₹4,953.42 |
| 10.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B - First depth | 0.42 | cu.m | 500 ₹210 | 246 ₹103.32 |
Tender Value
₹17.5 L
EMD Value
₹17,460
Closing Date
4 Aug 2025, 3:00 pmClosed
Block Development Officer (VP)
BDO
Construction of 30000 Ltr OHT at Palarpatti in Nattarpatti Panchayat Panchayat IN Marungapuri Block in Tiruchirappalli District under Mines Fund - 2025-2026
2025_RDTN_585778_1
B2/1791/2025
Open Tender
Civil Works - Bridges
Block Development Officer (VP)
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,460
Yes
16 Mar 2026
26 Jul 2025
4 Aug 2025
26 Jul 2025
4 Aug 2025
26 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid