Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.1 LAccepted-AOC MULLAKATH PODIYATTUVILA PO VALAKOM KOLLAM 691532 | KOLLAM | KOLLAM | KERALA | 691532 | L1 | Accepted-AOC L1 Accepted for further proceedings |
Tender Value
₹57.7 L
EMD Value
₹50,000
Closing Date
8 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MANAGER (Technical)
SILK STEEL FABRICATION UNIT.SL PURAM, CHERTHALA ALAPPUZHA - 688582
Renovation of Hanging Bridge and Elevated walkway at Thenmala Ecotourism Promotion Society
2023_SILK_630684_3
SILK/SFU/04/2023-24/511
Open Tender
Miscellaneous Works
Item Rate
180 days
Thenmala
As per tender documents
7 documents required · 7 mandatory
₹2,950
₹50,000
Yes
29 Oct 2024
1 Jan 2024
9 Jan 2024
1 Jan 2024
8 Jan 2024
1 Jan 2024
1 Jan 2024 - 8 Jan 2024
Amount
Hanging Bridge - CIVIL WORKS
od140815/2022_2023 Site clearing and cutting branches of trees
15.25 Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
15.9.2 Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.9.2 Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (requiring Blasting)
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
16.68 Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
13.1.2 12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
GRANITE BENCH
6.1.1 Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.2 12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
8.9.1.2 Stone tile (polished) work for wall lining over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and cement slurry @ 3.3 kg/sqm including pointing in white cement complete.Granite of any colour and shade
STEEL WORK
15.18 Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,boltd, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
od140801/2022_2023 Dismantling of existing platform , Timber floor , granite pieces , corroded bracings and clamps etc.
85.102 Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
85.104 Supply of Al checquered plates including cost of conveyance charges
85.124 Fabrication and supply of Hoisting bridge unit in structural steel confirming to IS2062Gr including ladder, covers for hoisting unit etc as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, incidental and handling charges for fixing handrails and allied works etc complete but excluding material already supplied and weight of pipes for hand rails etc
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
od140779/2022_2023 Erection of the bridge including handrails , ladder and platform etc. in correct alignment and anchoring it ; setting and aligning the covers of the hoisting unit etc complete including cost of all labour, machinery, incidental and conveyance , lead and lift charges etc complete but excluding cost of materials already supplied
od141045/2022_2023 Applying Grease to the mechanical hinges , Saddle point cable anchorage point
od141232/2022_2023 Corrosion protection compound applied on steel rope
Elevated Walkway - CIVIL WORKS
2.9.2 Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (requiring blasting)
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.1.2 12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.44.1 Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
STEEL WORK
od141469/2022_2023 Dismantling of existing timber platform and support structure from walkway
85.103 Supply of MS checquered plates including cost of conveyance charges
85.102 Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
85.124 Fabrication and supply of Hoisting bridge unit in structural steel confirming to IS2062Gr including ladder, covers for hoisting unit etc as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, incidental and handling charges for fixing handrails and allied works etc complete but excluding material already supplied and weight of pipes for hand rails etc
13.52.1 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
od141605/2022_2023 Erection of the bridge including handrails , ladder and platform etc. in correct alignment and anchoring it ; setting and aligning the covers of the hoisting unit etc complete including cost of all labour, machinery, incidental and conveyance , lead and lift charges etc complete but excluding cost of materials already supplied
13.92.1 Painting on G.S. sheet with synthetic enamel paint of approved brand andmanufacture of required colour to give an even shade :Old work (one or more coats)
od141742/2022_2023 Rectification of damaged S.S handrail and S.S post on required. elevated walkway with material with required.
technical_972347.pdf
PDF • 0.30 MB
techsummary_972347.pdf
PDF • 0.26 MB
finance_972347.pdf
PDF • 0.09 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_972347.pdf
PDF • 0.19 MB
W.O.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .