Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹97.4 LAdmitted-Finance | -3.00% | ₹97.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance PLOT NO 37 BADANPUR OLD SER NO 34658 NEAR SAI BARAT PALACE PAWAN BHUMI SHAKTI NAGAR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | +8.00% | ₹1.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.1 CrAdmitted-Finance | +12.00% | ₹1.1 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical As per technical evaluation sheet |
| 5 | Rejected-Technical 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | - | - | Rejected-Technical As per technical evaluation sheet |
Updated dates
Tender Value
₹1.0 Cr
EMD Value
₹2 L
Closing Date
11 Mar 2026, 6:00 pmClosed
Maintenance In Charge IDO, IIT Indore
th floor Abhinandan Bhawan IIT Indore
Operation Maintenance of Central HVAC Plant and Comprehensive Maintenance of 05 Nos. of Chillers installed at IIT Indore.
2026_IITI_899534_1
IITI/IDO/M/HVAC/CAMC/HVAC PLANT/NIT/2025-26/03
Open Tender
AMC/ Maintenance Contracts
365 days
IIT indore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2 L
Yes
5th floor Abhinandan Bhawan IIT Indore
8 Apr 2026
20 Feb 2026
12 Mar 2026
20 Feb 2026
11 Mar 2026
20 Feb 2026
25 Feb 2026
Operation & Maintenance (routine and preventive) and Breakdown Maintenance of all the Machinery and Equipment (Chillers, Cooling Towers, Pumps, Electrical Panels, Cabling, Piping etc.) installed at Central HVAC plant of IIT Indore. Deputation of following manpower included: a) Engineer (Highly Skilled) - 1 Nos. (General shift of all working days) b) Operator (Skilled) - 3 Nos. (2 shift all days of the week) c) Helper (Unskilled) - 3 Nos. (2 Shift all days of the week) Note: The cost included deputation of 7 manpower (including reliever) deployed by the contractor in suitable shift duties on a daily basic. A minimum of 6 personnel must be required to be present daily for a period of 365 days. (Also, the cost included of :- employee’s contribution to EPF, ESIC, WC Policy, LWC, uniforms, tools etc. as per statutory rules.)
Repair (Including Manpower, Spares, Consumables etc.), Testing & Commissioning of 1 (One) Chiller, Capacity-600TR, Make-Carrier.
Comprehensive Maintenance of Chillers (make-Carrier) installed at Central HVAC plant of IIT Indore for a period of 1 year (365 days).
Chiller-1, Capacity-600TR
Chiller-2, Capacity-600TR Note: The comprehensive maintenance (CAMC) for this chiller will start from date of commissioning & successful operation of the chiller and payment for CAMC will be made accordingly.
Chiller-1, Capacity-600TR
Chiller-1, Capacity-650TR
Chiller-1, Capacity-650TR
stage.html
html • 0.04 MB
techsummary_945506.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_945506.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid